Construction of a cycling path Poznań — Tulce — Govzewo over the district roads of 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo, District of Poznański (Q134948): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The scope of the project includes the construction of a cycle path Poznań — Toulon — Gowarzezewo over district roads No 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo. Projected length of the section 7.497 km from the border of M. Tulce and tm. Govik ends at ul. The Czech Republic will be connected to the site and will be connected to the footbridge on the site. Szczepankowo. It will provide a cycle of communication for w...) |
||
Property / summary | |||
The scope of the project includes the construction of a cycle path Poznań — Toulon — Gowarzezewo over district roads No 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo. Projected length of the section 7.497 km from the border of M. Tulce and tm. Govik ends at ul. The Czech Republic will be connected to the site and will be connected to the footbridge on the site. Szczepankowo. It will provide a cycle of communication for walking and cycling with latitudes 1.50 m to 3.50 m. new energy efficient lighting will also be provided for the sections from km 0 + 00 to km 0 + 500 and from the cemetery in Tulce to ul. Diamond. A bicycle parking area (B & R) will be built in Toulon at the hub. The planned cycle path will be at the same time a pushchair at which rest areas will be located. The project will be carried out by: New lines of demarcation for the cycle road and for the walkway; — bituminous pavement paths; − − − − − − − − − − − − − − − − − − — road body for paths and for pedestrians; — earth-moving works and embankments; — the path towards open road ditches is dehydrated; — culverts and separators — path drainage.; — paving blocks of concrete shape; Traffic lights at the intersection ul. Sports in Tulce; — new lighting; — stations for bicycles; Remove any conflict with the devices; — frames for bicycles on the government. Kopel. The scope of the project shall also include measures to promote sustainable mobility, in particular cycle communication and investment surveillance. — Number of facilities built "Bike & Ride”, 1; Number of parking positions in built facilities “Bike & Ride” — 45; — Length of cycle infrastructure — 7.497 km; — Number of actions and information and promotional campaigns — 1 balances; — Number of new/improved light points — 45. (English) | |||
Property / summary: The scope of the project includes the construction of a cycle path Poznań — Toulon — Gowarzezewo over district roads No 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo. Projected length of the section 7.497 km from the border of M. Tulce and tm. Govik ends at ul. The Czech Republic will be connected to the site and will be connected to the footbridge on the site. Szczepankowo. It will provide a cycle of communication for walking and cycling with latitudes 1.50 m to 3.50 m. new energy efficient lighting will also be provided for the sections from km 0 + 00 to km 0 + 500 and from the cemetery in Tulce to ul. Diamond. A bicycle parking area (B & R) will be built in Toulon at the hub. The planned cycle path will be at the same time a pushchair at which rest areas will be located. The project will be carried out by: New lines of demarcation for the cycle road and for the walkway; — bituminous pavement paths; − − − − − − − − − − − − − − − − − − — road body for paths and for pedestrians; — earth-moving works and embankments; — the path towards open road ditches is dehydrated; — culverts and separators — path drainage.; — paving blocks of concrete shape; Traffic lights at the intersection ul. Sports in Tulce; — new lighting; — stations for bicycles; Remove any conflict with the devices; — frames for bicycles on the government. Kopel. The scope of the project shall also include measures to promote sustainable mobility, in particular cycle communication and investment surveillance. — Number of facilities built "Bike & Ride”, 1; Number of parking positions in built facilities “Bike & Ride” — 45; — Length of cycle infrastructure — 7.497 km; — Number of actions and information and promotional campaigns — 1 balances; — Number of new/improved light points — 45. (English) / rank | |||
Normal rank |
Revision as of 21:25, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a cycling path Poznań — Tulce — Govzewo over the district roads of 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo, District of Poznański |
Project in Poland financed by DG Regio |
Statements
6,281,742.31 zloty
0 references
1,507,618.1543999999 Euro
0.24 Euro
13 January 2020
0 references
8,096,658.09 zloty
0 references
1,943,197.9415999998 Euro
0.24 Euro
13 January 2020
0 references
85.0 percent
0 references
2 April 2018
0 references
31 December 2019
0 references
POWIAT POZNAŃSKI
0 references
Zakres projektu obejmuje budowę ścieżki rowerowej Poznań - Tulce - Gowarzewo w ciągu dróg powiatowych nr 2438P, 2429P, 2489P (była DW 433) w gminie Kleszczewo. Projektowany odcinek o dł. 7,497 km biegnie od granicy m. Poznania (Szczepankowo) poprzez m. Tulce i m. Gowarzewo, kończy się przy ul. Czereśniowej i stanowić będzie połączenie z przebudowywaną na terenie m. Poznania ul. Szczepankowo. W ramach proj. wykonane zostaną ciągi komunikacji pieszej i rowerowej o szerokościach od 1,50 m do 3,50 m. Wykonane zostanie także nowe oświetlenie energooszczędne na odcinkach od km 0+00 do km 0+500 oraz od cmentarza w m. Tulce do ul. Diamentowej. W miejscowości Tulce przy węźle przesiadkowym wybudowany zostanie parking rowerowy (B&R). Projektowana droga rowerowa stanowić będzie jednocześnie ciąg spacerowy, przy którym zostaną zlokalizowane miejsca odpoczynku. Na zakres projektu złoży się wykonanie: -nowych linii rozgraniczających dla drogi rowerowej i chodnika; -ścieżki o nawierzchni bitumicznej; -ścieżki z kostki; -korpusu drogowego dla ścieżki oraz azyli dla pieszych; -robót ziemnych związanych z wykopami i nasypami; -odwodnienia ścieżki systemem otwartych rowów drogowych; -przepustów i separatorów - odwodnienie ścieżki row.; -chodników z kostki betonowej; -sygnalizacji świetlnej na skrzyżowaniu ul. Sportowej w Tulcach; -nowego oświetlenia; -stacji dla rowerów; -usunięcia wszystkich kolizji z urządzeniami obcymi; -kładki dla rowerów na rz. Kopel. Zakres projektu obejmuje także przeprowadzenie działań promocyjnych w zakresie mobilności zrównoważonej, w szczególności komunikacji rowerowej oraz sprawowanie nadzoru inwestorskiego.Efekty rzeczowe (produkty) realizacji projektu to: -Liczba wybudowanych obiektów "Bike&Ride" - 1 szt; -Liczba stanowisk postojowych w wybudowanych obiektach "Bike&Ride" - 45 szt.; -Długość wspartej infrastruktury rowerowej - 7,497 km; -Liczba akcji i kampanii informacyjno - promocyjnych - 1 szt; -Liczba nowych/zmodernizowanych punktów świetlnych - 45. (Polish)
0 references
The scope of the project includes the construction of a cycle path Poznań — Toulon — Gowarzezewo over district roads No 2438P, 2429P, 2489P (former DW 433) in the municipality of Kleszczzewo. Projected length of the section 7.497 km from the border of M. Tulce and tm. Govik ends at ul. The Czech Republic will be connected to the site and will be connected to the footbridge on the site. Szczepankowo. It will provide a cycle of communication for walking and cycling with latitudes 1.50 m to 3.50 m. new energy efficient lighting will also be provided for the sections from km 0 + 00 to km 0 + 500 and from the cemetery in Tulce to ul. Diamond. A bicycle parking area (B & R) will be built in Toulon at the hub. The planned cycle path will be at the same time a pushchair at which rest areas will be located. The project will be carried out by: New lines of demarcation for the cycle road and for the walkway; — bituminous pavement paths; − − − − − − − − − − − − − − − − − − — road body for paths and for pedestrians; — earth-moving works and embankments; — the path towards open road ditches is dehydrated; — culverts and separators — path drainage.; — paving blocks of concrete shape; Traffic lights at the intersection ul. Sports in Tulce; — new lighting; — stations for bicycles; Remove any conflict with the devices; — frames for bicycles on the government. Kopel. The scope of the project shall also include measures to promote sustainable mobility, in particular cycle communication and investment surveillance. — Number of facilities built "Bike & Ride”, 1; Number of parking positions in built facilities “Bike & Ride” — 45; — Length of cycle infrastructure — 7.497 km; — Number of actions and information and promotional campaigns — 1 balances; — Number of new/improved light points — 45. (English)
0 references
Identifiers
RPWP.03.03.03-30-0022/17
0 references