Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre (Q3357339): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Created claim: summary (P836): In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) | |||||||||||||||
Property / summary: In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English) / qualifier | |||||||||||||||
point in time: 29 November 2021
|
Revision as of 15:07, 29 November 2021
Project Q3357339 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Removal from Fibrocement in School Buildings — School School No. 2 of Silvestre |
Project Q3357339 in Portugal |
Statements
13,244.0 Euro
0 references
13,244.0 Euro
0 references
100.0 percent
0 references
17 December 2020
0 references
31 May 2021
0 references
MUNICÃPIO DE COIMBRA
0 references
Na intervenção pretende-se substituir todos os elementos em fibrocimento por painéis de cobertura de chapa perfilada, com isolamento térmico. Serão desobstruÃdos os tubos de queda e será colocada pinha para evitar a futura obstrução dos tubos de queda. (Portuguese)
0 references
In the intervention, it is intended to replace all the elements in asbestos-cement with panels of profiled sheet covering, with thermal insulation. Drop tubes will be cleared and pine cones will be placed in order to avoid future obstruction of the drop tubes. (English)
29 November 2021
0 references
Coimbra, Região de Coimbra, Centro
0 references
Identifiers
CENTRO-03-5673-FEDER-000246
0 references