Construction of a photovoltaic micro-installation by Grzegorz Wiszniewski (Q131889): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to the...)
Property / summary
 
The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to the photovolt strength. (up to 40 kW) according to Article 5 RED (Journal of Laws 2015, item 478) and Article 7 (8d) with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the need for the beneficiaries to have important technical grid connection conditions. It will be used for its own purposes and any surplus will be entered into the network. There will be no need to install batteries and recharging regulators as the network is able to absorb the entire production of batteries. The applicant currently has a connection where the contractual power is 26 kW.. the project shall be completed within 1 year following the signature of the contract um. for part-financing. as a specific objective, a subdivision. 4.1 is indicated: Increased share of renewable sources in the region’s overall energy balance. Within the framework of the project, the applicant will open a new electricity generating electricity generation with an annual yield of 12.14 MWh. In this way, the electricity produced will inevitably increase the share of renewables in the overall energy mix by 12.14 MWh/year. The project meets all boundary conditions laid down in the SzOOP. Following the receipt of the grant and the signature of the contract with the contractor, the purchase and installation of the photovoltaic equipment (in accordance with the design documentation) will be purchased and installed and the planned project indicators will be met. (English)
Property / summary: The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to the photovolt strength. (up to 40 kW) according to Article 5 RED (Journal of Laws 2015, item 478) and Article 7 (8d) with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the need for the beneficiaries to have important technical grid connection conditions. It will be used for its own purposes and any surplus will be entered into the network. There will be no need to install batteries and recharging regulators as the network is able to absorb the entire production of batteries. The applicant currently has a connection where the contractual power is 26 kW.. the project shall be completed within 1 year following the signature of the contract um. for part-financing. as a specific objective, a subdivision. 4.1 is indicated: Increased share of renewable sources in the region’s overall energy balance. Within the framework of the project, the applicant will open a new electricity generating electricity generation with an annual yield of 12.14 MWh. In this way, the electricity produced will inevitably increase the share of renewables in the overall energy mix by 12.14 MWh/year. The project meets all boundary conditions laid down in the SzOOP. Following the receipt of the grant and the signature of the contract with the contractor, the purchase and installation of the photovoltaic equipment (in accordance with the design documentation) will be purchased and installed and the planned project indicators will be met. (English) / rank
 
Normal rank

Revision as of 20:47, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic micro-installation by Grzegorz Wiszniewski
Project in Poland financed by DG Regio

    Statements

    0 references
    88,400.0 zloty
    0 references
    21,216.0 Euro
    13 January 2020
    0 references
    128,420.0 zloty
    0 references
    30,820.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 April 2017
    0 references
    30 April 2020
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWE GRZEGORZ WISZNIEWSKI
    0 references

    54°2'20.8"N, 22°29'37.7"E
    0 references
    Inwestycja polega na zakupie i montażu w m. Olecko,obręb 0002, nr dział. 265/5, 266/2, 265/3: - instalacji fotowoltaicznej dachowej–63paneli (monokrystalicznych) o mocy 18,27 kW z 2 falownikami, niezbędnym okablowaniem i osprzętem. Panele PV wykorzystują zjawisko fotowolt. do przetwarzania promieniowania na en. elektr. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny, inst. będzie podłączona do sieci, jednakże ze względu na moc inst. fotowolt. (do 40 kW) zgodnie z art. 5 ust. o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz art. 7 ust.8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będą one dokonywane na podst. zgłoszenia bez konieczności posiadania przez benef. ważnych techn. warunków przyłączenia do sieci. Wyproduk. en. będzie wykorzyst. na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. Nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą wyprod. en. Wnioskodawca posiada obecnie przyłącza gdzie moc umowna wynosi 26 kW.Projekt zostanie zakończony w ciągu 1 roku od podpisania um. o dofinansowanie.Jako cel szczegółowy poddział. 4.1 wskazano: Zwiększony udział odnawialnych źród. energii w ogólnym bilansie energetycznym regionu. W ramach projektu Wnioskodawca uruchomi nową elektr. fotowoltaiczną do produkcji energii elektr. o rocznej produktywności 12,14 MWh. W ten sposób wyprodukowana energia elektr. z całą pewnością wpłynie na zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym o 12,14MWh/rok. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP. Po otrzymaniu dotacji i podpisaniu umowy z wykonawcą będzie zakup i montaż instalacji fotowoltaicznej (zgodny z dokumentacją projektową) oraz osiągnięcie planowanych wskaźników projektu. (Polish)
    0 references
    The investment consists of the purchase and assembly in m. Olecko, rim 0002, unit number. 265/5, 266/2, 265/3: — 63KW and 18,27-kW solar photovoltaic installations with 2 inverters, the necessary wiring and fittings. PV panels are used by photovoltaic panels to process radiation to en. electrons. With cable connections, they transmit energy to inverters where alternating current into variable current will be connected to the grid, but due to the photovolt strength. (up to 40 kW) according to Article 5 RED (Journal of Laws 2015, item 478) and Article 7 (8d) with 4-9 Act — Energy Law (Journal of Laws 1997/54, item) 348) will be made on the basis of the notification without the need for the beneficiaries to have important technical grid connection conditions. It will be used for its own purposes and any surplus will be entered into the network. There will be no need to install batteries and recharging regulators as the network is able to absorb the entire production of batteries. The applicant currently has a connection where the contractual power is 26 kW.. the project shall be completed within 1 year following the signature of the contract um. for part-financing. as a specific objective, a subdivision. 4.1 is indicated: Increased share of renewable sources in the region’s overall energy balance. Within the framework of the project, the applicant will open a new electricity generating electricity generation with an annual yield of 12.14 MWh. In this way, the electricity produced will inevitably increase the share of renewables in the overall energy mix by 12.14 MWh/year. The project meets all boundary conditions laid down in the SzOOP. Following the receipt of the grant and the signature of the contract with the contractor, the purchase and installation of the photovoltaic equipment (in accordance with the design documentation) will be purchased and installed and the planned project indicators will be met. (English)
    0 references

    Identifiers

    RPWM.04.01.00-28-0273/17
    0 references