(Created claim: summary (P836): The project involves the construction of 7 new photovoltaic installations on public buildings located in Bartoszyce Municipality. Primary School No 4 in Bartoszyce: Ref. 98/5, Ob: 0002, Bartoszyce Pre-Public School No. 6: Ref. 113/4, Ob: 0002, Bartoszyce before Public School No 2: Ref. 89/46, Ob: 0007, Bartoszyce Pre-Public School No. 9: Ref. 107/34, Ob: 0003, Bartoszyce Urban Social Assistance Centre; Ref. 33/16, Ob: 0005, Bartoszyce Urban Soci...) |
||
Property / summary | |||
The project involves the construction of 7 new photovoltaic installations on public buildings located in Bartoszyce Municipality. Primary School No 4 in Bartoszyce: Ref. 98/5, Ob: 0002, Bartoszyce Pre-Public School No. 6: Ref. 113/4, Ob: 0002, Bartoszyce before Public School No 2: Ref. 89/46, Ob: 0007, Bartoszyce Pre-Public School No. 9: Ref. 107/34, Ob: 0003, Bartoszyce Urban Social Assistance Centre; Ref. 33/16, Ob: 0005, Bartoszyce Urban Social Assistance Centre: Ref. 33/27, Ob: 0005, Bartoszyce School of Primary School No 3: Ref. 4/1; OB: 0008, Bartoszyce to connect each photovoltaic system to the grid, the type of installation it grid. Technical parameters of the installation: MOPS: Generator power: 19,2 kWp Modules: 64 inverter: 1 MOPS: Generator power: 27,90 kWp Modules: 93 inverter: 1 Pre-school No 2: Generator power: 12,30 kWp Modules: 41 inverter: 1 Pre-school No 6: Generator power: 10,80 kWp Modules: 36 inverter: 1 Pre-school No 9: Generator power: 14,70 kWp Modules: 49 inverter: 1 SP No 4: Power generator 15,60 kWp Modules: 52 inverter: 1 SP No 3: Generator power: 39,90 kWp Modules: 133 inverter: 2 Investment will be implemented in different stages: preparation of the feasibility study, selection of contractors, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the timetable, testing and checking of the installation, completion of the project and signature of the final protocol, operational phase. The project is part of the assumptions of the SZOOP ROP WM 2014-2020. The project will increase energy efficiency at consumption level, increasing the share of RES in the municipality’s energy balance. Local energy security through diversification of sources and supply will be increased. The investment will help to improve the environment by reducing CO2 emissions. (English) | |||
Property / summary: The project involves the construction of 7 new photovoltaic installations on public buildings located in Bartoszyce Municipality. Primary School No 4 in Bartoszyce: Ref. 98/5, Ob: 0002, Bartoszyce Pre-Public School No. 6: Ref. 113/4, Ob: 0002, Bartoszyce before Public School No 2: Ref. 89/46, Ob: 0007, Bartoszyce Pre-Public School No. 9: Ref. 107/34, Ob: 0003, Bartoszyce Urban Social Assistance Centre; Ref. 33/16, Ob: 0005, Bartoszyce Urban Social Assistance Centre: Ref. 33/27, Ob: 0005, Bartoszyce School of Primary School No 3: Ref. 4/1; OB: 0008, Bartoszyce to connect each photovoltaic system to the grid, the type of installation it grid. Technical parameters of the installation: MOPS: Generator power: 19,2 kWp Modules: 64 inverter: 1 MOPS: Generator power: 27,90 kWp Modules: 93 inverter: 1 Pre-school No 2: Generator power: 12,30 kWp Modules: 41 inverter: 1 Pre-school No 6: Generator power: 10,80 kWp Modules: 36 inverter: 1 Pre-school No 9: Generator power: 14,70 kWp Modules: 49 inverter: 1 SP No 4: Power generator 15,60 kWp Modules: 52 inverter: 1 SP No 3: Generator power: 39,90 kWp Modules: 133 inverter: 2 Investment will be implemented in different stages: preparation of the feasibility study, selection of contractors, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the timetable, testing and checking of the installation, completion of the project and signature of the final protocol, operational phase. The project is part of the assumptions of the SZOOP ROP WM 2014-2020. The project will increase energy efficiency at consumption level, increasing the share of RES in the municipality’s energy balance. Local energy security through diversification of sources and supply will be increased. The investment will help to improve the environment by reducing CO2 emissions. (English) / rank | |||
Normal rank |
Revision as of 20:18, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Investments in renewable energy sources in Bartoszyce Municipality |
Project in Poland financed by DG Regio |
Statements
796,187.98 zloty
0 references
936,691.74 zloty
0 references
85.0 percent
0 references
29 September 2016
0 references
31 December 2018
0 references
GMINA MIEJSKA BARTOSZYCE
0 references
Przedmiotem projektu jest budowa 7 nowych instalacji fotowoltaicznych na budynkach użyteczności publicznej położonych na terenie Gminy Miejskiej Bartoszyce. Szkoła Podstawowa nr 4 w Bartoszycach: Nr. dz: 98/5 , Ob: 0002, Bartoszyce Przedszkole Publiczne nr 6: Nr. dz: 113/4, Ob:0002, Bartoszyce Przedszkole Publiczne nr 2: Nr. dz: 89/46, Ob: 0007, Bartoszyce Przedszkole Publiczne nr 9: Nr. dz: 107/34, Ob: 0003, Bartoszyce Miejski Ośrodek Pomocy Społecznej; Nr. dz: 33/16, Ob:0005, Bartoszyce Miejski Ośrodek Pomocy Społecznej: Nr. dz: 33/27, Ob: 0005, Bartoszyce Szkoła Podstawowa nr 3: Nr. dz: 4/1; Ob: 0008, Bartoszyce Zakłada się podłączenie każdego systemu fotowoltaicznego do sieci - typ instalacji on grid. Parametry techniczne instalacji: MOPS: Moc generatora: 19,2 kWp Moduły: 64 Falownik: 1 MOPS: Moc generatora: 27,90 kWp Moduły: 93 Falownik: 1 Przedszkole nr 2 : Moc generatora: 12,30 kWp Moduły: 41 Falownik: 1 Przedszkole nr 6: Moc generatora: 10,80 kWp Moduły: 36 Falownik: 1 Przedszkole nr 9: Moc generatora: 14,70 kWp Moduły: 49 Falownik: 1 SP nr 4: Moc generatora 15,60 kWp Moduły: 52 Falownik: 1 SP nr 3: Moc generatora: 39,90 kWp Moduły: 133 Falownik: 2 Inwestycja zostanie wdrożona w poszczególnych etapach: przygotowanie studium wykonalności, wybór wykonawców, zawarcie umowy z wykonawcą, przygotowanie techniczne do montażu instalacji oraz montaż zgodnie z harmonogramem, testowanie i sprawdzanie instalacji, zakończenie projektu i podpisanie protokołu końcowego, etap eksploatacji. Projekt wpisuje się w założenia SZOOP RPO WiM 2014-2020. Projekt pozwoli na zwiększenie efektywności energetycznej na poziomie zużycia, zwiększając przy tym udział OZE w bilansie energetycznym Gminy. Zwiększone zostanie lokalne bezpieczeństwo energetyczne poprzez dywersyfikację źródeł oraz dostaw energii. Inwestycja przyczyni się do poprawy stanu środowiska naturalnego poprzez redukcję emisji CO2. (Polish)
0 references
The project involves the construction of 7 new photovoltaic installations on public buildings located in Bartoszyce Municipality. Primary School No 4 in Bartoszyce: Ref. 98/5, Ob: 0002, Bartoszyce Pre-Public School No. 6: Ref. 113/4, Ob: 0002, Bartoszyce before Public School No 2: Ref. 89/46, Ob: 0007, Bartoszyce Pre-Public School No. 9: Ref. 107/34, Ob: 0003, Bartoszyce Urban Social Assistance Centre; Ref. 33/16, Ob: 0005, Bartoszyce Urban Social Assistance Centre: Ref. 33/27, Ob: 0005, Bartoszyce School of Primary School No 3: Ref. 4/1; OB: 0008, Bartoszyce to connect each photovoltaic system to the grid, the type of installation it grid. Technical parameters of the installation: MOPS: Generator power: 19,2 kWp Modules: 64 inverter: 1 MOPS: Generator power: 27,90 kWp Modules: 93 inverter: 1 Pre-school No 2: Generator power: 12,30 kWp Modules: 41 inverter: 1 Pre-school No 6: Generator power: 10,80 kWp Modules: 36 inverter: 1 Pre-school No 9: Generator power: 14,70 kWp Modules: 49 inverter: 1 SP No 4: Power generator 15,60 kWp Modules: 52 inverter: 1 SP No 3: Generator power: 39,90 kWp Modules: 133 inverter: 2 Investment will be implemented in different stages: preparation of the feasibility study, selection of contractors, conclusion of contract with the contractor, technical preparation for installation and installation in accordance with the timetable, testing and checking of the installation, completion of the project and signature of the final protocol, operational phase. The project is part of the assumptions of the SZOOP ROP WM 2014-2020. The project will increase energy efficiency at consumption level, increasing the share of RES in the municipality’s energy balance. Local energy security through diversification of sources and supply will be increased. The investment will help to improve the environment by reducing CO2 emissions. (English)
0 references
Identifiers
RPWM.04.01.00-28-0447/16
0 references