Eli – EXTREME LIGHT Infrastructure – phase 2 (Q19847): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
ELI — INFRASTRUCTURE LUMIÈRE EXTREME — Phase 2 |
Revision as of 19:28, 28 November 2021
Project Q19847 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | Eli – EXTREME LIGHT Infrastructure – phase 2 |
Project Q19847 in Czech Republic |
Statements
1,580,564,601.09 Czech koruna
0 references
1,859,487,765.99 Czech koruna
0 references
85.0 percent
0 references
1 October 2015
0 references
31 December 2018
0 references
Fyzikální ústav AV ČR, v. v. i.
0 references
18200
0 references
Projekt ELI (Extreme Light Infrastructure) je součástí evropské cestovní mapy (roadmap) pro vybudování příští generace velkých výzkumných center zásadního významu, které byly identifikovány Evropským strategickým fórem pro výzkumné infrastruktury (ESFRI). ELI bude mezinárodní výzkumnou laboratoří využívající nejnovější generaci laserových technologií k vytváření nejintenzivnějších světelných pulsů dostupných v laboratorních podmínkách. a. (Czech)
0 references
The ELI (Extreme Light Infrastructure) project is part of the European Roadmap for building the next generation of major research centres of major importance identified by the European Strategic Forum for Research Infrastructures (ESFRI). Eli will be an international research laboratory using the latest generation of laser technologies to generate the most intense light pulses available in laboratory conditions. a. (English)
22 October 2020
0 references
Identifiers
CZ.02.1.01/0.0/0.0/15_008/0000162
0 references