Installation of photovoltaic power plant with battery system and necessary modifications of electrical distributions in ZOD Tísek (Q16698): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q214247 was merged with Q4870)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Installation d’une centrale photovoltaïque avec système de batterie et modifications nécessaires du câblage électrique à ZOD Tísek

Revision as of 18:43, 28 November 2021

Project Q16698 in Czech Republic
Language Label Description Also known as
English
Installation of photovoltaic power plant with battery system and necessary modifications of electrical distributions in ZOD Tísek
Project Q16698 in Czech Republic

    Statements

    0 references
    1,938,418.4 Czech koruna
    0 references
    77,536.74 Euro
    10 January 2020
    0 references
    2,423,023.0 Czech koruna
    0 references
    96,920.92 Euro
    10 January 2020
    0 references
    80 percent
    0 references
    30 June 2020
    0 references
    Zemědělské obchodní družstvo Tísek
    0 references
    0 references

    49°46'2.53"N, 18°0'27.29"E
    0 references
    74301
    0 references
    Instalace fotovoltaické elektrárny o výkonu 50 kWp na střeše správního objektu ZOD Tísek a současně na střeše dílen s bateriovým systémem o výkonu 28 kWh k akumulaci vyrobené elektřiny umístěném v podkroví správního objektu a nezbytnými úpravami elektrorozvodů ve správní budově - dílny, posklizňové lince a úpravy páteřního rozvodu elektřiny v areálu ZOD Tísek s cílem rozvodu vyrobené energie z FVE a akumulované v bateriích po podnikatelském areálu ZOD Tísek a. (Czech)
    0 references
    Installation of a photovoltaic power plant with an output of 50 kWp on the roof of the administrative building ZOD Tísek and simultaneously on the roof of the workshops with a battery system of 28 kWh for the accumulation of electricity produced in the attic of the administrative building and necessary modifications of electrical distribution in the administrative building – workshops, post-harvest line and modifications of the backbone distribution of electricity in the area of ZOD Tísek with the aim of distribution of produced energy from FVE and accumulated in the business area. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011722
    0 references