Reduction of energy performance in EUROFROST CB a.s. (Q16222): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Change because item Q214250 was merged with Q4860)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
Réduction de l’intensité énergétique à EUROFROST CB a.s.

Revision as of 18:37, 28 November 2021

Project Q16222 in Czech Republic
Language Label Description Also known as
English
Reduction of energy performance in EUROFROST CB a.s.
Project Q16222 in Czech Republic

    Statements

    0 references
    2,118,574.0 Czech koruna
    0 references
    84,742.96 Euro
    10 January 2020
    0 references
    5,296,435.0 Czech koruna
    0 references
    211,857.4 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    6 September 2018
    0 references
    31 March 2020
    0 references
    EUROFROST CB a.s.
    0 references
    0 references

    48°57'40.28"N, 14°27'20.84"E
    0 references
    37001
    0 references
    Předmětem projektu je aplikace energetických opatření v administrativní budově a logistickém skladu, ve kterém převládá skladování mraženého a chlazeného zboží.V administrativní budově se nacházejí kancelářské prostory, šatny a hygienická zařízení. Logistický sklad má kapacitu 17 tisíc paletových míst, z čehož je 15 tisíc pro mraženéa 2 tisíce pro chlazené zboží. Administrativní budova a sklad byly vystavěny na přelomu let 2006 a 2007 a v roce 2015 byl sklad rozšířen o nové mrazící komory. a. (Czech)
    0 references
    The object of the project is the application of energy measures in the administrative building and logistics warehouse, which predominates the storage of frozen and chilled goods.The administrative building contains office spaces, dressing rooms and sanitary facilities. The logistics warehouse has a capacity of 17, pallets, of which 15 thousand for frozen 2 thousand for chilled goods. The administrative building and warehouse were built at the turn of 2006 and 2007 and in 2015 the warehouse was expanded with new freezer chambers. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0013181
    0 references