(‎Created claim: summary (P836): Dans le cadre du projet, la revitalisation du territoire dégradé sera réalisée dans la partie A de la ville de Limbazi, assurant la croissance territoriale et la création de nouveaux emplois propices à la durabilité environnementale. Les principales activités du projet sont les suivantes: réalisation de recherches en génie, développement d’une conception de construction, reconstruction de la rue Mécanisation et de son intersection avec la rue Cē...)
(‎Changed label, description and/or aliases in de: translated_label)
label / delabel / de
 
Revitalisierung degradierter Gebiete in Limbazi Stadt Teil A durch Verbesserung der Zugänglichkeit

Revision as of 09:38, 28 November 2021

Project Q3057511 in Latvia
Language Label Description Also known as
English
Revitalising the degraded areas of part A of Limbazi by improving accessibility
Project Q3057511 in Latvia

    Statements

    0 references
    0 references
    0 references
    1,504,648.28 Euro
    0 references
    1,770,174.45 Euro
    0 references
    85.0 percent
    0 references
    12 June 2019
    0 references
    11 September 2020
    0 references
    Limbažu novada pašvaldība
    0 references
    0 references

    57°30'46.33"N, 24°43'38.50"E
    0 references

    57°30'59.04"N, 24°43'59.45"E
    0 references
    Projekta ietvaros tiks veikta degradētās teritorijas revitalizācija Limbažu pilsētas A daļā, nodrošinot vides ilgtspēju veicinošu teritoriālo izaugsmi un jaunu darba vietu radīšanu.Projekta galvenās darbības ir: inženierizpētes darbu veikšana, būvprojekta izstrāde, Mehanizācijas ielas un tās krustojuma ar Cēsu ielu pārbūve, tajā skaitā inženiertīklu, kam pastāv bojāšanas risks: SIA "Limbažu komunālserviss" esošā ūdensvada, SIA "Limbažu siltums" esošā siltumtīkla un AS "Sadales tīkls" elektroenerģijas infrastruktūras, pārbūve, būvdarbu autoruzraudzība un būvuzraudzība.Projekta rezultātā tiks pārbūvēta Mehanizācijas iela visā garumā (ap 940 m) atbilstoši spēkā esošajiem būvnormatīviem un izstrādātajam būvprojektam.Projekts tiks īstenots 15 mēnešu laikā pēc vienošanās par projekta īstenošanu noslēgšanas. Tā kopējās izmaksas ir 1839589.98 EUR, no kurām attiecināmās izmaksas ir 1770174.45 EUR, tajā skaitā 1504648.28 EUR ERAF līdzfinansējums. (Latvian)
    0 references
    Within the framework of the project the degraded territory will be revitalised in part A of Limbazi city, ensuring environmental sustainability-friendly territorial growth and job creation.The main activities of the project are: Engineering studies, development of construction project, reconstruction of Mehanizācijas street and its intersection with Cēsu street, including engineering network, which is at risk of damage: “Limbažu komunālserviss” Ltd. electricity infrastructure, construction, author supervision and construction supervision of the existing water supply network, LLC “Limbažu siltums” and “Sadales tīkls” AS.The project will be rebuilt in the whole length (about 940 m) of Mehanisation Street in accordance with the existing construction regulations and developed construction project. Its total cost is EUR 1839589.98, of which the eligible costs are EUR 1770174.45, including EUR 1504648.28 ERDF co-financing. (English)
    15 July 2021
    0 references
    Dans le cadre du projet, la revitalisation du territoire dégradé sera réalisée dans la partie A de la ville de Limbazi, assurant la croissance territoriale et la création de nouveaux emplois propices à la durabilité environnementale. Les principales activités du projet sont les suivantes: réalisation de recherches en génie, développement d’une conception de construction, reconstruction de la rue Mécanisation et de son intersection avec la rue Cēsu, y compris les réseaux d’ingénierie, qui sont menacés de dommages: Reconstruction de l’approvisionnement en eau existant de «Limbažu komunālserviss» Ltd, du réseau de chauffage existant de SIA Limbažu siltums et de l’infrastructure électrique de JSC «Sadales tīkls», auteur de la supervision des travaux de construction et de la supervision de la construction. Son coût total s’élève à 1 839 589,98 EUR, dont les coûts éligibles s’élèvent à 1 770 174,45 EUR, dont 1 504 648,28 EUR cofinancés par le FEDER. (French)
    25 November 2021
    0 references
    Mehanizācijas iela, Limbaži, Limbažu nov.
    0 references
    Cēsu iela, Limbaži, Limbažu nov.
    0 references

    Identifiers

    5.6.2.0/18/I/019