DRR: Kočevje cyclist (Q3277558): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in slovenia one item from slovenia)
(‎Changed label, description and/or aliases in fr: translated_label)
label / frlabel / fr
 
RRC: Cycliste de Kočevje

Revision as of 13:37, 27 November 2021

Project Q3277558 in Slovakia
Language Label Description Also known as
English
DRR: Kočevje cyclist
Project Q3277558 in Slovakia

    Statements

    0 references
    2,547,575.2 Euro
    0 references
    3,184,469.0 Euro
    0 references
    80.0 percent
    0 references
    1 June 2017
    0 references
    31 December 2022
    0 references
    OBČINA KOČEVJE
    0 references
    0 references

    45°38'34.37"N, 14°51'58.79"E
    0 references
    1330
    0 references
    Ureditev kolesarski poti v občini Kočevje na več lokacijah. Dolžina novo zgrajene kolesarske povezave znaša 5,23 km, dolžina celotnega odseka z obstoječo infrastrukturo pa znaša 5,27 km. (Slovenian)
    0 references
    Organisation of the cycling route in the municipality of Kočevje at several locations. The length of the newly built cycling link is 5.23 km and the length of the entire section with the existing infrastructure is 5.27 km. (English)
    19 October 2021
    0 references

    Identifiers

    OP20.07465
    0 references