Construction of cycle paths in Pie any (Q3100834): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of this project is the construction of cycling infrastructure, additional cycling infrastructure and the promotion of cycling traffic in the town of Piešt’any. The implementation of the proposed objective will lead to an increase in infrastructure capacity for non-motorised transport in the city, which will contribute to an increase in the proportion of people using this mode of transport. The city has built several cycling roads so...) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Construction de pistes cyclables dans la ville de Piešt’any |
Revision as of 12:57, 27 November 2021
Project Q3100834 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of cycle paths in Pie any |
Project Q3100834 in Slovakia |
Statements
400,094.09 Euro
0 references
470,698.93 Euro
0 references
85.0 percent
0 references
1 September 2018
0 references
1 April 2021
0 references
Mesto Piešťany
0 references
Q3120136 (Deleted Item)
0 references
Predmetom predkladaného projektu je vybudovanie cyklistickej infraštruktúry, doplnkovej cyklistickej infraštruktúry a propagácia cyklistickej dopravy v meste Piešťany. Vďaka zrealizovaniu predkladaného zámeru dôjde k zvýšeniu kapacity infraštruktúry pre nemotorovú dopravu v meste, čo prispeje k zvýšeniu podielu osôb využívajúcich tento druh dopravy. Mesto aj doposiaľ vybudovalo niekoľko cyklistických komunikácií, víziou do budúcnosti je sieťovanie týchto trás a zvýšenie dostupnosti bodov záujmu (najmä občianskej infraštruktúry a miest dochádzky za prácou), avšak na dobudovanie ďalších trás mestu chýba dostatok finančných prostriedkov, preto sa obracia na riadiaci orgán pre IROP so žiadosťou o dotáciu. Cieľom projektu je zvýšenie kapacity nemotorovej dopravy, zvýšenie počtu prepravovaných osôb prostredníctvom cyklistickej dopravy a propagácia cyklistickej dopravy. Jedným z podnetov pre predloženie predmetného projektu bol práve rastúci počet obyvateľov mesta využívajúcich cyklistickú dopravu. Vďaka realizácii projektu bude mesto schopné uspokojiť potreby občanov spojené s využívaním nemotorovej dopravy. Vytýčený cieľ projektu bude dosiahnutý zrealizovaním dvoch hlavných aktivít projektu „Výstavba infraštruktúry pre nemotorovú dopravu vrátane doplnkovej infraštruktúry“ a „Propagácia cyklistickej dopravy v meste prostredníctvom mobilnej aplikácie“ s celkovou dĺžkou trvania 13 mesiacov. V rámci týchto aktivít budú uskutočnené stavebné práce a nákup ďalšieho vybavenia. Výsledkom zrealizovaného projektu bude dosiahnutie merateľných ukazovateľov projektu: dĺžka nových úsekov cyklistických komunikácií – 2,3 km, počet vytvorených prvkov doplnkovej cyklistickej infraštruktúry – 1 prvok a počet zavedených propagačných aktivít – 2 propagačné aktivity. Miestom realizácie projektu je mesto Piešťany. (Slovak)
0 references
The subject of this project is the construction of cycling infrastructure, additional cycling infrastructure and the promotion of cycling traffic in the town of Piešt’any. The implementation of the proposed objective will lead to an increase in infrastructure capacity for non-motorised transport in the city, which will contribute to an increase in the proportion of people using this mode of transport. The city has built several cycling roads so far, the vision for the future is to network these routes and increase the availability of points of interest (especially civic infrastructure and commuting places), but there is insufficient funding to complete the other routes of the city, so the managing body for IROP is contacting the request for a subsidy. The aim of the project is to increase the capacity of non-motorised transport, to increase the number of persons transported by cycling and to promote cycling. One of the initiatives for the submission of the project in question was the growing number of inhabitants of the city using cycling. Thanks to the implementation of the project, the city will be able to meet the needs of citizens associated with the use of non-motorised transport. The stated objective of the project will be achieved through the realisation of two main activities of the project “Construction of infrastructure for non-motorised transport, including additional infrastructure” and “Promotion of cycling in the city through a mobile application”, with a total duration of 13 months. As part of these activities, construction works and the purchase of additional equipment will be carried out. The realised project will result in the achievement of measurable project indicators: length of new cycling sections – 2.3 km, number of additional cycling infrastructure created – 1 element and number of promotional activities introduced – 2 promotional activities. The place of implementation of the project is the town of Piešt’any. (English)
28 September 2021
0 references
Identifiers
302011G485
0 references