Energy saving measures (Q3060500): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in fr: translated_label) |
(Created claim: summary (P836): Optimisation de l’installation Système d’évaporation, Mesures d’économie d’énergie, Linz, translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Optimisation de l’installation Système d’évaporation, Mesures d’économie d’énergie, Linz (French) | |||||||||||||||
Property / summary: Optimisation de l’installation Système d’évaporation, Mesures d’économie d’énergie, Linz (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Optimisation de l’installation Système d’évaporation, Mesures d’économie d’énergie, Linz (French) / qualifier | |||||||||||||||
point in time: 27 November 2021
|
Revision as of 09:41, 27 November 2021
Project Q3060500 in Austria
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy saving measures |
Project Q3060500 in Austria |
Statements
142,084.0 Euro
0 references
8 July 2017
0 references
30 November 2018
0 references
Fresenius Kabi Austria GmbH
0 references
40101
0 references
Plant Optimisation Evaporation Plant, Energy Saving Measures, Linz (English)
20 July 2021
0 references
Anlagenoptimierung Eindampfanlage, Betr. Energiesparmaßnahmen, Linz (Austrian German)
0 references
Optimisation de l’installation Système d’évaporation, Mesures d’économie d’énergie, Linz (French)
27 November 2021
0 references
Linz
0 references
Identifiers
AUST-216
0 references