ERDF-ENERGETIC RENOVATION OF 180 DWELLINGS IN HARFLEUR-IMMOBILIERE LOWER SEINE (Q3681284): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
EFRE-ERNEUERUNG VON 180 WOHNUNGEN IN HARFLEUR-IMMOBILIERE BASS SEINE |
Revision as of 14:59, 26 November 2021
Project Q3681284 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | ERDF-ENERGETIC RENOVATION OF 180 DWELLINGS IN HARFLEUR-IMMOBILIERE LOWER SEINE |
Project Q3681284 in France |
Statements
1,076,404.59 Euro
0 references
3,588,015.29 Euro
0 references
30.0 percent
0 references
31 May 2021
0 references
IMMOBILIERE BASSE SEINE
0 references
76600
0 references
180 logements collectifs répartis sur 8 bâtiments collectifs disposés parallèlement sur la pente du site entouré d'espaces verts importants. Leur construction, sous forme de barres et de plots, ont été édifiés au début des années 1960. Le chauffage, collectif, est assuré par une chaufferie et une sous-station. L'Eau Chaude Sanitaire est collective pour les bâtiments D à G, et individuelle pour A, B et C.La Conception Réalisation Exploitation Maintenance (CREM) : Le contrat associe la conception et l'exploitation du chauffage à la réalisation des travaux afin de remplir des objectifs chiffrés d'efficacité énergétique. Le contrat signé le 28/12/2017, comprend une phase conception de 6 mois, une phase travaux de 18 mois et l'exploitation des installations collectives de chauffage et ECS du 01/09/2018 au 30/06/2032. (French)
0 references
180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English)
18 November 2021
0 references
Identifiers
18E01877
0 references