Energy rehabilitation — 80 homes — Allée Jean Bart (Q3678910): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Changed label, description and/or aliases in de: translated_label) |
||
label / de | label / de | ||
Energiesanierung – 80 Wohnungen – Allée Jean Bart |
Revision as of 14:43, 26 November 2021
Project Q3678910 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy rehabilitation — 80 homes — Allée Jean Bart |
Project Q3678910 in France |
Statements
390,400.0 Euro
0 references
1,600,000.0 Euro
0 references
24.4 percent
0 references
31 December 2018
0 references
1 June 2020
0 references
Le Foyer Rémois
0 references
La présente opération porte sur un ensemble de construction comprenant 80 logements répartis sur 4 ensembles de bâtiments R+4 datant de 1960 réhabilités une première fois en 1993 La typologie des logements correspond à la répartition suivante : 10T2 - 30 T3 - 30 T4 - 10 T5 L'opération consiste en la rénovation énergétique de ces bâtiments avec les travaux suivants : - Traitement de l'enveloppe du bâtiment via l'isolation thermique par l'extérieur, le remplacement des meuiseries extérieures et la refection des toitures; - Amélioration des productions et distributions de chauffage et d'eau chaude sanitaire; - Création de VMC; - Fermeture des balcons - Remplacement des portes palières L'opération répond également à des obligations de sécurisation et de sécurité: - Reprise du contrôle d'accès et de l'interphonie - Mise au normes aux niveaux électrique, accessibilité et incendie (French)
0 references
The present operation concerns a construction package comprising 80 dwellings spread over 4 sets of R+ 4 buildings dating from 1960 first rehabilitated in 1993 The type of dwellings corresponds to the following breakdown: 10T2-30 T3-30 T4-10 T5 The operation consists of the energy renovation of these buildings with the following works: — Treatment of the building envelope by means of thermal insulation from the outside, replacement of exterior mills and refection of roofs; — Improvement of the production and distribution of heating and domestic hot water; — Creation of VMC; — Closure of balconies — Replacement of landing doors The operation also meets security and safety obligations: — Resumption of access control and interphony — Standardisation at electrical, accessibility and fire levels (English)
18 November 2021
0 references
Identifiers
CA0024032
0 references