Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution Nr.29, Vienības iela 38B (Q3057104): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Amélioration de l’efficacité énergétique dans l’établissement d’enseignement préscolaire de la ville de Daugavpils no 29, Vienības iela 38B |
Revision as of 20:10, 25 November 2021
Project Q3057104 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution Nr.29, Vienības iela 38B |
Project Q3057104 in Latvia |
Statements
542,111.75 Euro
0 references
807,178.49 Euro
0 references
67.16 percent
0 references
14 August 2020
0 references
13 November 2022
0 references
DAUGAVPILS PILSĒTAS DOME
0 references
Projektā “Energoefektivitātes paaugstināšana Daugavpils pilsētas pirmsskolas izglītības iestādē Nr.29, Vienības ielā 38B” ir paredzēts veikt iestādes ēkas pārbūvi, tādējādi nodrošinot ēkas energoefektivitātes paaugstināšanu. Projekta mērķis: Veicināt Daugavpils pilsētas 29. poļu pirmsskolas izglītības iestādē, Vienības ielā 38B energoefektivitātes paaugstināšanu, samazinot primārās enerģijas patēriņu.Projekta galvenās darbības: 1. Būvdarbu veikšana Daugavpils pilsētas 29.poļu pirmsskolas izglītības iestādē;1.1.apkures sistēmas rekonstrukcija; 1.2.energoefektīva apgaismojuma uzstādīšana; 1.3.ārsienu siltināšana; 1.4.logu un ārdurvju nomaiņa; 1.5. ventilācijas sistēmas izbūve;1.6. pagraba pārseguma siltināšana;1.7. jumta pārseguma siltināšana;1.8. cokola un pamatu siltināšana2.Autoruzraudzība 3.Būvuzraudzība.Tiks nodrošināta projekta publicitāte, ievērojot Ministru kabineta 17.02.2015. noteikumus Nr.87 “Kārtība, kādā Eiropas Savienības struktūrfondu un Kohēzijas fonda ieviešanā 2014.–2020.gada plānošanas periodā nodrošināma komunikācijas un vizuālās identitātes prasību ievērošana” un Finanšu ministrijas vadlīnijas Nr.2.4. “Eiropas Savienības fondu 2014 – 2020.gada plānošanas perioda publicitātes vadlīnijas Eiropas Savienības fondu finansējuma saņēmējiem”.Projekta ilgums: Vienošanās par projekta īstenošanu plāno noslēgt līdz 2020.gada 30.septembrim, bet projekta aktivitātes tiks uzsāktas no 2020.gada IV.ceturkšņa līdz 2022.gada IV.ceturksnim.Projekta kopējās izmaksas: EUR 1 382 296.73, t.sk. ERAF EUR 542 111.75. Projekta plānotie rezultāti: •tiks samazināts primārās enerģijas patēriņš, sekmējot ilgtermiņā energoefektivitātes paaugstināšanu un pašvaldības izdevumu samazināšanos par siltumapgādi, •tiks sasniegtas energoefektivitātes prasības atbilstoši Latvijas būvnormatīvā LBN 002-15 “Ēku norobežojošo konstrukciju siltumtehnika” (Latvian)
0 references
The project “Enhancement of Energy Efficiency at Daugavpils City Preschool Education Institution No.29, Vienības iela 38B” provides for reconstruction of the building, thus ensuring improvement of the energy efficiency of the building. The aim of the project shall be: Promote improvement of energy efficiency in Daugavpils city’s 29th Polish preschool educational institution, Vienības Street 38B, reducing primary energy consumption.Project main activities: 1. Construction works in Daugavpils city 29th Polish preschool educational institution; 1.1. reconstruction of heating system; 1.2. energy efficient lighting installation; 1.3. insulating of external walls; 1.4.replacement of windows and external doors; 1.5. construction of ventilation system; 1.6. insulation of basement cover; 1.7. roof covering insulation; 1.8. cap and foundation insulation2.Author supervision 3 Construction supervision The project publicity will be ensured in accordance with the Regulations of the Cabinet of Ministers of 17.02.2015 No.87 “Procedure of implementation of the European Union Structural Funds and Cohesion Fund during the 2014-2020 planning period to ensure compliance with communication and visual identity requirements” and the Ministry of Finance Guidelines No 2.4. “Publicity guidelines for the 2014-2020 planning period of the European Union funds for the recipients of funding of the European Union funds”.Project duration: The agreement on the implementation of the project is planned to be concluded by 30 September 2020, but the project activities will be started from the IVth quarter of 2020 to the fourth quarter of 2022. Project total costs: EUR 1 382 296.73, of which: ERDF EUR 542 111.75. Planned results of the project: •The primary energy consumption will be reduced, contributing to the long-term improvement of energy efficiency and reduction of municipal expenditure on heating, • the energy efficiency requirements will be achieved in accordance with the Latvian building norm LBN 002-15 “Heat Engineering of Building Structures” (English)
15 July 2021
0 references
Vienības iela 38B, Daugavpils, LV-5401
0 references
Identifiers
4.2.2.0/18/I/003
0 references