17 km renewal of drinking water system in the Grand Abymes Fund — 2018 Emergency Plan (Q3685572): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
||
Property / beneficiary | |||
Property / beneficiary: Q3770671 / rank | |||
Normal rank |
Revision as of 17:05, 24 November 2021
Project Q3685572 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | 17 km renewal of drinking water system in the Grand Abymes Fund — 2018 Emergency Plan |
Project Q3685572 in France |
Statements
4,620,000.0 Euro
0 references
5,775,000.0 Euro
0 references
80.0 percent
0 references
23 February 2018
0 references
31 December 2023
0 references
EAU D'EXCELLENCE
0 references
L’étage de distribution du compteur de caraque est long 58 km. Ce compteur est alimenté directement par le feeder de Belle Eau Cadeau nous observons depuis plusieurs années une baisse significative de la pression sur ce réseau de Belle-Eau-Cadeau. Par voie de conséquence : les réservoirs et les habitations situées sur les points hauts ont du mal à être alimentés. L’objet de ce projet est le renouvellement du réseau de distribution de l’étage de Caraque dans les Grands-Fonds sur la commune des Abymes. Il s’agit de la première et la deuxième tranche d’un programme de renouvellement des réseaux et des branchements qui a été décomposé en 6 phases opérationnelles. Cela représente ainsi un total 17 km du réseau d’eau potable incluant le report et le renouvellement des branchements, ainsi que la mise en œuvre de compteurs et de vannes de renouvellement de sectorisation. Les impacts attendus des travaux sont : La réduction du débit des fuites de 100 m3/h et les pertes d’eau sur le réseau de distribution sur le secteur de Grands-Fonds Abymes et Gosier. L’augmentation des volumes disponibles en matière d’eau potable pour d’autre périmètre notamment pour les Grands Fonds Gosier L’amélioration du rendement de réseau de distribution sur le secteur de Grands-Fonds Abymes. (French)
0 references
The distribution floor of the caraque meter is 58 km long. This meter is powered directly by the feeder of Belle Eau Gifteau we have observed for several years a significant decrease in the pressure on this network of Belle-Eau-Cadeau. As a consequence: reservoirs and dwellings located on the high points have difficulty in being fed. The purpose of this project is the renewal of the distribution network of the Caraque floor in the Grands-Fonds in the commune of Abymes. This is the first and second tranche of a network and branch renewal programme that has been broken down into six operational phases. This represents a total of 17 km of the drinking water system, including the postponement and renewal of connections, as well as the implementation of metering and sectorisation renewal valves. The expected impacts of the work are: Reduction of leak flow by 100 m³/h and water losses on the distribution system on the Abymes and Gosier Grand-Fonds area. Increasing the volume of drinking water available for other areas, notably for the Grand Gosier Funds Improving the efficiency of the distribution system in the Abymes Grand fonds area. (English)
18 November 2021
0 references
Identifiers
GP0019404
0 references