Creation of a basis for re-employment and diversification of Emmaus’ activities Challenge for a significant impact in the fight against large exclusion. ERDF aid will intervene on phase 1 of the work (Q139588): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
(‎Changed claim: French Kohesio ID (P843): IF0009109)
Property / French Kohesio IDProperty / French Kohesio ID
320
IF0009109

Revision as of 10:10, 24 November 2021

Project Q139588 in France
Language Label Description Also known as
English
Creation of a basis for re-employment and diversification of Emmaus’ activities Challenge for a significant impact in the fight against large exclusion. ERDF aid will intervene on phase 1 of the work
Project Q139588 in France

    Statements

    0 references
    0 references
    900,000.0 Euro
    0 references
    2,877,907.0 Euro
    0 references
    31.27 percent
    0 references
    1 June 2017
    0 references
    31 October 2018
    0 references
    EMMAUS DEFI - FONDATEUR ABBE PIERRE
    0 references
    0 references

    48°52'57.76"N, 2°23'37.61"E
    0 references
    75019
    0 references
    Cette opération a pour objet le cofinancement de la phase 1 des travaux d’aménagement et de réhabilitation des surfaces non utilisés par Emmaüs Défi dans ses locaux situé au cœur du quartier riquet-stalingrad. Emmaus utilise actuellement l’ensemble du rez-de-chaussée de Riquet, la quasi-totalité du niveau -1 et quelques places de parking pour les camions au niveau -2. Des surfaces sont inutilisées : environ 500 m² au niveau -1 et environ 5000 m² aux niveaux -2 et -3. (French)
    0 references
    The purpose of this operation is to co-finance Phase 1 of the renovation and rehabilitation of areas not used by Emmaus Défi in its premises located in the heart of the Riquet-stalingrad district. Emmaus currently uses the entire ground floor of Riquet, almost all of the -1 level and a few parking spaces for trucks at the -2 level. Surfaces are unused: About 500 m² on level -1 and about 5000 m² on levels -2 and -3. (English)
    2 October 2020
    0 references
    The Emmaüs Défi association shopfront. (English)
    Emmaüs Défi
    0 references

    Identifiers

    IF0009109
    0 references
    4950
    0 references