(Created claim: summary (P836): The conversion of the SUW installation will consist of a change in the working technology, i.e. the hydroforter system with a one-stage water pumping system will be replaced by a two-step water pumping system, together with the construction of the clean water reservoirs and the one-step filtration of water will be changed into two steps with two aerators to aerate the water. In Brajniki, the construction of a mains network with a long length is...) |
||
Property / summary | |||
The conversion of the SUW installation will consist of a change in the working technology, i.e. the hydroforter system with a one-stage water pumping system will be replaced by a two-step water pumping system, together with the construction of the clean water reservoirs and the one-step filtration of water will be changed into two steps with two aerators to aerate the water. In Brajniki, the construction of a mains network with a long length is being designed. 11.746,6 mb. The investment will take the following plots of land: Geodesic zone Vision: plot No 168, 263, Brajniki surveying perimeter: plot No 1/3; 3; 5/5; 5/6; 5/8; 6; 8/1; 8/2; 9; 10; 11/1; 13/1; 13/4; 14; 15; 16/1; 17; 20; 21/2; 23; 26/7; 26/19; 26/23; 27/3; 27/5; 27/6; 27/8; 27/11; 28; 29; 30; 35; 42/10; 42/12; 42/15; 42/16; 42/35; 46/5; 46/7; 46/20; 46/80; 46/83; 58/12; 58/13; 58/29; 58/30; 58/34; 58/43; 58/50; 76/6; 84/10; 85/18; 86/12; 86/32; 88/4; 88/5; 89/4; 92; 93; 95/1; 95/2; 96/1; 96/2; 97/2; 99/2; 102. The village of Witopa and the Brajniki are located in the area of the agglomeration which is being analysed. The concept of the replacement of a water treatment plant in a station is linked to the widening of the station’s share of the station in the construction of water for the production of water for economic purposes. Current water abstraction due to inadequate hygiene and sanitation conditions is zero. The drought in Vilnius since September 2015 is closed because of very poor water performance. In water, Witowa’s water supplies hydroformance, which at present provides water to the municipality. At present, the inhabitants of Brajnik have built a sewerage network, and water is taken from deep water wells. The construction of deep water wells by the population. The project is to be set up. in SzocOP ROP WZM 2014-2020-A more treated waste water and better water quality. (English) | |||
Property / summary: The conversion of the SUW installation will consist of a change in the working technology, i.e. the hydroforter system with a one-stage water pumping system will be replaced by a two-step water pumping system, together with the construction of the clean water reservoirs and the one-step filtration of water will be changed into two steps with two aerators to aerate the water. In Brajniki, the construction of a mains network with a long length is being designed. 11.746,6 mb. The investment will take the following plots of land: Geodesic zone Vision: plot No 168, 263, Brajniki surveying perimeter: plot No 1/3; 3; 5/5; 5/6; 5/8; 6; 8/1; 8/2; 9; 10; 11/1; 13/1; 13/4; 14; 15; 16/1; 17; 20; 21/2; 23; 26/7; 26/19; 26/23; 27/3; 27/5; 27/6; 27/8; 27/11; 28; 29; 30; 35; 42/10; 42/12; 42/15; 42/16; 42/35; 46/5; 46/7; 46/20; 46/80; 46/83; 58/12; 58/13; 58/29; 58/30; 58/34; 58/43; 58/50; 76/6; 84/10; 85/18; 86/12; 86/32; 88/4; 88/5; 89/4; 92; 93; 95/1; 95/2; 96/1; 96/2; 97/2; 99/2; 102. The village of Witopa and the Brajniki are located in the area of the agglomeration which is being analysed. The concept of the replacement of a water treatment plant in a station is linked to the widening of the station’s share of the station in the construction of water for the production of water for economic purposes. Current water abstraction due to inadequate hygiene and sanitation conditions is zero. The drought in Vilnius since September 2015 is closed because of very poor water performance. In water, Witowa’s water supplies hydroformance, which at present provides water to the municipality. At present, the inhabitants of Brajnik have built a sewerage network, and water is taken from deep water wells. The construction of deep water wells by the population. The project is to be set up. in SzocOP ROP WZM 2014-2020-A more treated waste water and better water quality. (English) / rank | |||
Normal rank |
Revision as of 13:02, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving water management in the water catchment area of the Lake Świętajno within Wivo and Brajniki |
Project in Poland financed by DG Regio |
Statements
2,143,808.8 zloty
0 references
3,235,305.62 zloty
0 references
85.0 percent
0 references
13 April 2018
0 references
29 November 2019
0 references
GMINA JEDWABNO
0 references
Przebudowa instalacji SUW będzie polegała na zmianie technologii pracy tj. układ hydroforowy z jednostopniowym pompowaniem wody zostanie zastąpiony układem dwustopniowego pompowania wody wraz z budową zbiorników wyrównawczych wody czystej oraz filtracja jednostopniowa zostanie zmieniona na filtrację dwustopniową z dwoma aeratorami do napowietrzania wody. W miejscowości Brajniki projektuje się budowę sieci wodociągowej o dł. 11.746,6 mb. Inwestycja będzie przebiegała przez następujące działki: Obręb geodezyjny Witowo: nr działki 168, 263, Obręb geodezyjny Brajniki: nr działki 1/3; 3; 5/5; 5/6; 5/8; 6; 8/1; 8/2; 9; 10; 11/1; 13/1; 13/4; 14; 15; 16/1; 17; 20; 21/2; 23; 26/7; 26/19; 26/23; 27/3; 27/5; 27/6; 27/8; 27/11; 28; 29; 30; 35; 42/10; 42/12; 42/15; 42/16; 42/35; 46/5; 46/7; 46/20; 46/80; 46/83; 58/12; 58/13; 58/29; 58/30; 58/34; 58/43; 58/50; 76/6; 84/10; 85/18; 86/12; 86/32; 88/4; 88/5; 89/4; 92; 93; 95/1; 95/2; 96/1; 96/2; 97/2; 99/2; 102. Miejscowości Witowo i Brajniki położone są na obszarze aglomeracji, który jest skanalizowany. Koncepcja wymiany instalacji uzdatniania wody w stacji powiązana jest ze zwiększeniem udziału stacji w Witowie w ogólnej produkcji wody do celów bytowo gospodarczych. Obecny pobór wody ze względu na nieodpowiednie warunki higieniczno-sanitarne jest zerowy. SUW w Witowie od września 2015 r. jest zamknięta z powodu bardzo złych wyników wody. W wodę mieszkańców Witowa zaopatruje hydrofornia w Jedwabnie, która w chwili obecnej dostarcza wodę na teren gminy. W chwili obecnej mieszkańcy Brajnik mają wybudowaną sieć kanalizacyjną, a wodę pobierają ze studni głębinowych. Budowa studni głębinowych przez mieszk., letników, pensjonaty i hotele w miejscowościach Brajniki, Warchały i Narty powoduje osuszanie się jeziora Świętajno. Projekt wpisuje się w założ. określ. w SzOOP RPO WiM 2014-2020-cel szczegół-więcej oczyszczonych ścieków i lepsza jakość wody. (Polish)
0 references
The conversion of the SUW installation will consist of a change in the working technology, i.e. the hydroforter system with a one-stage water pumping system will be replaced by a two-step water pumping system, together with the construction of the clean water reservoirs and the one-step filtration of water will be changed into two steps with two aerators to aerate the water. In Brajniki, the construction of a mains network with a long length is being designed. 11.746,6 mb. The investment will take the following plots of land: Geodesic zone Vision: plot No 168, 263, Brajniki surveying perimeter: plot No 1/3; 3; 5/5; 5/6; 5/8; 6; 8/1; 8/2; 9; 10; 11/1; 13/1; 13/4; 14; 15; 16/1; 17; 20; 21/2; 23; 26/7; 26/19; 26/23; 27/3; 27/5; 27/6; 27/8; 27/11; 28; 29; 30; 35; 42/10; 42/12; 42/15; 42/16; 42/35; 46/5; 46/7; 46/20; 46/80; 46/83; 58/12; 58/13; 58/29; 58/30; 58/34; 58/43; 58/50; 76/6; 84/10; 85/18; 86/12; 86/32; 88/4; 88/5; 89/4; 92; 93; 95/1; 95/2; 96/1; 96/2; 97/2; 99/2; 102. The village of Witopa and the Brajniki are located in the area of the agglomeration which is being analysed. The concept of the replacement of a water treatment plant in a station is linked to the widening of the station’s share of the station in the construction of water for the production of water for economic purposes. Current water abstraction due to inadequate hygiene and sanitation conditions is zero. The drought in Vilnius since September 2015 is closed because of very poor water performance. In water, Witowa’s water supplies hydroformance, which at present provides water to the municipality. At present, the inhabitants of Brajnik have built a sewerage network, and water is taken from deep water wells. The construction of deep water wells by the population. The project is to be set up. in SzocOP ROP WZM 2014-2020-A more treated waste water and better water quality. (English)
0 references
Identifiers
RPWM.05.02.00-28-0014/17