Runtech Systems Oy International Growth 2016-2018 (Q3749975): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Runtech Systems Oy International Growth 2016-2018

Revision as of 22:45, 22 November 2021

Project Q3749975 in France
Language Label Description Also known as
English
Runtech Systems Oy International Growth 2016-2018
Project Q3749975 in France

    Statements

    0 references
    130,645 Euro
    0 references
    130,645.0 Euro
    0 references
    100.0 percent
    0 references
    20 June 2016
    0 references
    30 June 2018
    0 references
    RUNTECH SYSTEMS OY
    0 references

    60°31'15.92"N, 26°55'38.96"E
    0 references
    48600
    0 references
    Nykyisen Marttilankatu 12:n hallin yhteyteen rakennetaan yhdyskäytävällä 950 m2:n kokoinen lisärakennus, johon sijoitetaan jatkossa varastoitavat komponentit ja siten vapautetaan nykyisestä hallista lattiatilaa varsinaiselle tuotannolle. Uuteen rakennukseen sijoitetaan myös tulevan tavaran vastaanottotarkastuspiste, joka varustetaan 3D-koordinaattimittauskoneella.Seuraavan kahden vuoden aikana panostetaan myös yhtiön tuotteiden ja teknologian markkinoimiseen alan tärkeimmissä tapahtumissa. (Finnish)
    0 references
    An additional building of 950 m² will be built in the hall of Marttilakatu 12 at the gateway, which will be equipped with the components to be stored in the future and thus free from the current hall floor space for actual production. The new building will also be equipped with a 3D Coordinate Measuring Machine. During the next two years, the company’s products and technology will also be promoted at major events in the field. (English)
    22 November 2021
    0 references

    Identifiers

    0 references