(‎Created claim: summary (P836): The aim of the project is to ensure the energy independence of the Applicant’s industrial buildings located in Czermno. The applicant is carrying out a plastic processing plant itself, which requires large amounts of electricity, for the proper operation of the machinery, equipment and lighting. The project will lead to a situation where all energy comes from the renewable energy source, solar energy. In addition, the sale of surplus energy to t...)
Property / summary
 
The aim of the project is to ensure the energy independence of the Applicant’s industrial buildings located in Czermno. The applicant is carrying out a plastic processing plant itself, which requires large amounts of electricity, for the proper operation of the machinery, equipment and lighting. The project will lead to a situation where all energy comes from the renewable energy source, solar energy. In addition, the sale of surplus energy to the grid is assumed to be sold. The tasks to be carried out in the project include the purchase of fixed assets and the installation of the installation of a photovoltaic power plant up to 1 MW, together with the construction of an internal power plant, in order to connect the system to the buildings and to the grid connection. The project follows the design of the universal design — the system will be equipped with useful and easy-to-use control software. The project will be carried out in Czermno — parcel number: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (0002Czermno). The project is in line with the objectives of Action 3.1. ROP Woj. Świętokrzyskie Province covers the construction of an infrastructure for the generation of electricity from renewable energy sources — solar energy. The project only concerns the purchase of new, unused items. The project will meet the following indicators: product: Number of units of generation of electricity produced from RES — 1. Number of enterprises supported — 1 (b) Result: Electricity production from newly built RES — 757 MWhe/year Additional renewable electricity generation capacity — 0,85 MWe Increase in employment in supported enterprises — 4,5 FTE J.W. — men 3,0 — FTE women — 1,5 FTE Estimated annual decrease of GHG — 605.53 t/year (English)
Property / summary: The aim of the project is to ensure the energy independence of the Applicant’s industrial buildings located in Czermno. The applicant is carrying out a plastic processing plant itself, which requires large amounts of electricity, for the proper operation of the machinery, equipment and lighting. The project will lead to a situation where all energy comes from the renewable energy source, solar energy. In addition, the sale of surplus energy to the grid is assumed to be sold. The tasks to be carried out in the project include the purchase of fixed assets and the installation of the installation of a photovoltaic power plant up to 1 MW, together with the construction of an internal power plant, in order to connect the system to the buildings and to the grid connection. The project follows the design of the universal design — the system will be equipped with useful and easy-to-use control software. The project will be carried out in Czermno — parcel number: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (0002Czermno). The project is in line with the objectives of Action 3.1. ROP Woj. Świętokrzyskie Province covers the construction of an infrastructure for the generation of electricity from renewable energy sources — solar energy. The project only concerns the purchase of new, unused items. The project will meet the following indicators: product: Number of units of generation of electricity produced from RES — 1. Number of enterprises supported — 1 (b) Result: Electricity production from newly built RES — 757 MWhe/year Additional renewable electricity generation capacity — 0,85 MWe Increase in employment in supported enterprises — 4,5 FTE J.W. — men 3,0 — FTE women — 1,5 FTE Estimated annual decrease of GHG — 605.53 t/year (English) / rank
 
Normal rank

Revision as of 12:33, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic power plant of up to 1 MW to ensure energy independence in the “HEKO” installation
Project in Poland financed by DG Regio

    Statements

    0 references
    1,838,051.34 zloty
    0 references
    441,132.3216 Euro
    13 January 2020
    0 references
    4,185,835.55 zloty
    0 references
    1,004,600.5319999999 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 March 2018
    0 references
    31 October 2019
    0 references
    HENRYK KONIECZNY ZAKŁAD TWORZYW SZTUCZNYCH I WYROBÓW RÓŻNYCH "HEKO"
    0 references
    Celem projektu jest zapewnienie niezależności energetycznej budynkom przemysłowym Wnioskodawcy położonym w miejscowości Czermno. Wnioskodawca prowadzi tam samodzielnie zakład przetwórstwa tworzyw sztucznych, który wymaga dużych ilości energii elektrycznej, dla prawidłowego działania maszyn, urządzeń oraz oświetlenia hal. Realizacja niniejszego projektu ma doprowadzić do sytuacji, gdzie całość energii pochodziła będzie z odnawialnego źródła energii – energii słonecznej. Dodatkowo zakłada się sprzedaż nadwyżek produkowanej energii do sieci. Zadania jakie realizowane będą w projekcie obejmują zakup środków trwałych oraz prace montażowe - elektrownia fotowoltaiczna do mocy do 1 MW wraz z przebudową wewnętrznej instalacji elektroenergetycznej celem połączenia systemu z budynkami, a także przyłącze do sieci. Projekt realizuje koncepcję projektowania uniwersalnego – system wyposażony będzie m.in. użyteczne i łatwe w obsłudze oprogramowanie sterujące. Projekt realizowany będzie w miejscowości Czermno - nr działek: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (obręb 0002 Czermno). Projekt zgodny jest z założeniami Działania 3.1. RPO Woj. Świętokrzyskiego, bowiem obejmuje swoim zakresem budowę infrastruktury służącej do wytwarzania energii elektrycznej, pochodzącej ze źródeł odnawialnych - energii słonecznej. Projekt dotyczy wyłącznie zakupu nowych, nieużywanych elementów. Projekt pozwoli zrealizować następujące wskaźniki: a) Produktu: Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE - 1 szt. Liczba przedsiębiorstw otrzymujących wsparcie - 1 szt. b) Rezultatu: Produkcja energii elektrycznej z nowo wybudowanych inst. wykorzystujących OZE - 757 MWhe/rok Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych - 0,85 MWe Wzrost zatrudnienia we wspieranych przedsiębiorstwach - 4,5 EPC J.w. - mężczyźni 3,0 - EPC J.w. - kobiety - 1,5 EPC Szacowany roczny spadek emisji gazów cieplarnianych - 605,53 t/rok (Polish)
    0 references
    The aim of the project is to ensure the energy independence of the Applicant’s industrial buildings located in Czermno. The applicant is carrying out a plastic processing plant itself, which requires large amounts of electricity, for the proper operation of the machinery, equipment and lighting. The project will lead to a situation where all energy comes from the renewable energy source, solar energy. In addition, the sale of surplus energy to the grid is assumed to be sold. The tasks to be carried out in the project include the purchase of fixed assets and the installation of the installation of a photovoltaic power plant up to 1 MW, together with the construction of an internal power plant, in order to connect the system to the buildings and to the grid connection. The project follows the design of the universal design — the system will be equipped with useful and easy-to-use control software. The project will be carried out in Czermno — parcel number: 1088/2, 1089/2, 1090/2, 1091/2, 1092/2, 1086, 1087 (0002Czermno). The project is in line with the objectives of Action 3.1. ROP Woj. Świętokrzyskie Province covers the construction of an infrastructure for the generation of electricity from renewable energy sources — solar energy. The project only concerns the purchase of new, unused items. The project will meet the following indicators: product: Number of units of generation of electricity produced from RES — 1. Number of enterprises supported — 1 (b) Result: Electricity production from newly built RES — 757 MWhe/year Additional renewable electricity generation capacity — 0,85 MWe Increase in employment in supported enterprises — 4,5 FTE J.W. — men 3,0 — FTE women — 1,5 FTE Estimated annual decrease of GHG — 605.53 t/year (English)
    0 references

    Identifiers

    RPSW.03.01.00-26-0049/17
    0 references