(‎Created claim: summary (P836): The main objective of the project is to reduce greenhouse gas emissions by building micro-installations using renewable energy sources on individual holdings in Staszów, province Świętokrzyskie. The direct objective is part of the specific objective of Action 3.1: “Production and distribution of energy from renewable sources and is therefore in line with the support from Osi privaite”. 3 “Efficient and green energy”, of 14/20. The investment wil...)
Property / summary
 
The main objective of the project is to reduce greenhouse gas emissions by building micro-installations using renewable energy sources on individual holdings in Staszów, province Świętokrzyskie. The direct objective is part of the specific objective of Action 3.1: “Production and distribution of energy from renewable sources and is therefore in line with the support from Osi privaite”. 3 “Efficient and green energy”, of 14/20. The investment will be made using the “design and demolition” mode. The scope of the works includes the design, delivery and installation of renewable energy infrastructure for private residential buildings. In the framework of the project, the installation of two types of RES infrastructure is planned, namely: Solar collectors — 62 residential buildings and photovoltaic panels — 194 dwellings for 244 households. Out of the 244 households affected by the ferry in question. 54 are affected by energy poverty. Ue is 22.13 %. The installed capacity of the proj thermal energy is 0,2279 MWth. Electrical capacity of electric generators shall be 0,8131 MWe. The effect of this project will be to increase the use of renewable energy sources in, among others, the use of renewable energy sources in, for example, the generation of heat and electricity for the benefit of residents. INDICATORS: Number of units generating electricity generation from OE-194; Number of units of heat energy from OZE-62; Estimated annual decrease in greenhouse gas emissions of 663,244 tonnes of CO2 equivalent; Additional capacity for renewable heat generation. 0,2279 MWt; Additional electricity generation capacity from renewable energy sources. 0,8131 MWe; Thermal energy production from newly built RES 112,515 MWHT/year; Electricity generation from newly built generation capacity of installations using RES 736,95 MWhe. Proj shows an economic efficiency: ENPV = PLN 240 1656; EIRR = 14.5 %; B/C = 1,53.Deadline for completion of V-XI. (English)
Property / summary: The main objective of the project is to reduce greenhouse gas emissions by building micro-installations using renewable energy sources on individual holdings in Staszów, province Świętokrzyskie. The direct objective is part of the specific objective of Action 3.1: “Production and distribution of energy from renewable sources and is therefore in line with the support from Osi privaite”. 3 “Efficient and green energy”, of 14/20. The investment will be made using the “design and demolition” mode. The scope of the works includes the design, delivery and installation of renewable energy infrastructure for private residential buildings. In the framework of the project, the installation of two types of RES infrastructure is planned, namely: Solar collectors — 62 residential buildings and photovoltaic panels — 194 dwellings for 244 households. Out of the 244 households affected by the ferry in question. 54 are affected by energy poverty. Ue is 22.13 %. The installed capacity of the proj thermal energy is 0,2279 MWth. Electrical capacity of electric generators shall be 0,8131 MWe. The effect of this project will be to increase the use of renewable energy sources in, among others, the use of renewable energy sources in, for example, the generation of heat and electricity for the benefit of residents. INDICATORS: Number of units generating electricity generation from OE-194; Number of units of heat energy from OZE-62; Estimated annual decrease in greenhouse gas emissions of 663,244 tonnes of CO2 equivalent; Additional capacity for renewable heat generation. 0,2279 MWt; Additional electricity generation capacity from renewable energy sources. 0,8131 MWe; Thermal energy production from newly built RES 112,515 MWHT/year; Electricity generation from newly built generation capacity of installations using RES 736,95 MWhe. Proj shows an economic efficiency: ENPV = PLN 240 1656; EIRR = 14.5 %; B/C = 1,53.Deadline for completion of V-XI. (English) / rank
 
Normal rank

Revision as of 12:33, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction, renovation and upgrading of infrastructure for the production of electricity and heat from renewable sources in individual buildings
Project in Poland financed by DG Regio

    Statements

    0 references
    2,433,775.85 zloty
    0 references
    584,106.204 Euro
    13 January 2020
    0 references
    4,874,780.46 zloty
    0 references
    1,169,947.3103999998 Euro
    13 January 2020
    0 references
    55.0 percent
    0 references
    31 October 2017
    0 references
    30 November 2019
    0 references
    GMINA STASZÓW
    0 references
    Celem głównym projektu jest ograniczenie emisji gazów cieplarnianych poprzez budowę mikroinstalacji wykorzystujących odnawialne źródła energii w gospodarstwach indywidualnych na terenie Gminy Staszów, woj. Świętokrzyskie. Cel bezpośredni proj. wpisuje się w cel szczegółowy Działania 3.1 tj.:„Wytwarzanie i dystrybucja energii pochodzącej ze źródeł odnawialnych, zatem jest zgodny ze wsparciem w ramach Osi Prioryt. 3 „Efektywna i zielona energia” RPOWŚ 14/20. Inwestycja będzie realizowana w trybie „ZAPROJEKTUJ I WYBUDUJ”. Zakres robót obejmuje zaprojektowanie, dostawę i montaż infrastruktury odnawialnych źródeł energii dla prywatnych budynków mieszkalnych. W ramach proj. planuje się montaż dwóch rodzajów infrastruktury OZE, a mianowicie: KOLEKTORY słoneczne-62 budynków mieszkalnych i PANELE fotowoltaiczne-194 budynków mieszkalnych dla 244 gospodarstw domowych. Spośród 244 gospodarstw domowych objętych przedmiotowym proj. 54 dotkniętych jest problemem ubóstwa energetycznego. Wskaźnik Ue wynosi 22,13%. Moc zainstalowana energii cieplnej proj. wynosi 0,2279 MWth. Moc zainstalowana energii elektr. proj. wynosi 0,8131 MWe. Rezultatem bezpośr. przedmiotowego proj. będzie zwiększenie wykorzystania odnawialnych źródeł energii w gm. Staszów w zakresie wytwarzania energii cieplnej i elektr. na potrzeby mieszkańców. WSKAŹNIKI: Licz. wybud. jednostek wytwarzania energii elektr. z OZE-194 szt; Licz. wybud. jednostek energii cieplnej z OZE-62 szt; Szacowany roczny spadek emisji gazów cieplarnianych 663,244 ton równoważnika CO2; Dodat. zdolność wytwarzania energii cieplnej ze źródeł odnawial. 0,2279 MWt; Dodat. zdolność wytwarzania energii elektr. ze źródeł odnawial. 0,8131 MWe; Produkcja energii cieplnej z nowo wybudowanych inst. wykorzystujących OZE 112,515 MWht/rok; Produkcja energii elektr. z nowo wybudowanych mocy wytwórczych instalacji wykorzystujących OZE 736,95 MWhe. Proj. wykazuje efektywność ekonomiczną:ENPV= 240 1656PLN; EIRR=14,5 %; B/C=1,53.Termin wykon.V-XI 2019. (Polish)
    0 references
    The main objective of the project is to reduce greenhouse gas emissions by building micro-installations using renewable energy sources on individual holdings in Staszów, province Świętokrzyskie. The direct objective is part of the specific objective of Action 3.1: “Production and distribution of energy from renewable sources and is therefore in line with the support from Osi privaite”. 3 “Efficient and green energy”, of 14/20. The investment will be made using the “design and demolition” mode. The scope of the works includes the design, delivery and installation of renewable energy infrastructure for private residential buildings. In the framework of the project, the installation of two types of RES infrastructure is planned, namely: Solar collectors — 62 residential buildings and photovoltaic panels — 194 dwellings for 244 households. Out of the 244 households affected by the ferry in question. 54 are affected by energy poverty. Ue is 22.13 %. The installed capacity of the proj thermal energy is 0,2279 MWth. Electrical capacity of electric generators shall be 0,8131 MWe. The effect of this project will be to increase the use of renewable energy sources in, among others, the use of renewable energy sources in, for example, the generation of heat and electricity for the benefit of residents. INDICATORS: Number of units generating electricity generation from OE-194; Number of units of heat energy from OZE-62; Estimated annual decrease in greenhouse gas emissions of 663,244 tonnes of CO2 equivalent; Additional capacity for renewable heat generation. 0,2279 MWt; Additional electricity generation capacity from renewable energy sources. 0,8131 MWe; Thermal energy production from newly built RES 112,515 MWHT/year; Electricity generation from newly built generation capacity of installations using RES 736,95 MWhe. Proj shows an economic efficiency: ENPV = PLN 240 1656; EIRR = 14.5 %; B/C = 1,53.Deadline for completion of V-XI. (English)
    0 references

    Identifiers

    RPSW.03.01.00-26-0022/17
    0 references