Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II (Q123662): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles., Adding English summary) |
||
Property / summary | |||
The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles. (English) | |||
Property / summary: The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles. (English) / rank | |||
Normal rank |
Revision as of 10:01, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of lighting supplied by renewable energy in the municipality of Suzec — stage II |
Project in Poland financed by DG Regio |
Statements
554,115.0 zloty
0 references
651,900.0 zloty
0 references
85.0 percent
0 references
1 October 2019
0 references
30 November 2020
0 references
GMINA SUSZEC
0 references
Przedmiotem projektu jest budowa oświetlenia ulicznego hybrydowego na terenie Gminy Suszec w ilości 48 szt. Każda lampa będzie zasilana modułem fotowoltaicznym i turbiną wiatrową. Lampy będą zainstalowane na stalowych słupach o wysokości 9,5 mb, posadowione na stopie fundamentowej. (Polish)
0 references
The object of the project is the construction of street lighting in the municipality of Suzac in 48. Each lamp will be powered by a photovoltaic module and a wind turbine. The lamps will be installed on a base rate of 9,5 mb on the steel poles. (English)
0 references
Identifiers
RPSL.04.01.01-24-0077/19
0 references