Drainage of the city of Brusy (Q122524): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The object of the project is the design and implementation of the drainage of the western parts of Brus and ul. Kalwarna. The area is now built and planned for future construction and covers areas west of ul. Gdansk, in the direction of the River Niewraki, as well as the land located on the Kalwartown Street. The main objective of the project is therefore to prevent environmental risks and minimise the adverse effects of their effects on the lev...)
Property / summary
 
The object of the project is the design and implementation of the drainage of the western parts of Brus and ul. Kalwarna. The area is now built and planned for future construction and covers areas west of ul. Gdansk, in the direction of the River Niewraki, as well as the land located on the Kalwartown Street. The main objective of the project is therefore to prevent environmental risks and minimise the adverse effects of their effects on the level of safety in the city and municipality of Brusy, by developing a system of collection and treatment of rainwater and mites within its borders. This will be achieved by carrying out comprehensive work on the construction of 2.778 km of storm water collection and the construction of retention basins with a capacity of 11 115.00 m³, together with an accompanying infrastructure, which will benefit 5 149 people (who are residents) of flood protection measures. The project thus planned fulfils the objectives of the 11.1-2014 ROP PP -2020. (English)
Property / summary: The object of the project is the design and implementation of the drainage of the western parts of Brus and ul. Kalwarna. The area is now built and planned for future construction and covers areas west of ul. Gdansk, in the direction of the River Niewraki, as well as the land located on the Kalwartown Street. The main objective of the project is therefore to prevent environmental risks and minimise the adverse effects of their effects on the level of safety in the city and municipality of Brusy, by developing a system of collection and treatment of rainwater and mites within its borders. This will be achieved by carrying out comprehensive work on the construction of 2.778 km of storm water collection and the construction of retention basins with a capacity of 11 115.00 m³, together with an accompanying infrastructure, which will benefit 5 149 people (who are residents) of flood protection measures. The project thus planned fulfils the objectives of the 11.1-2014 ROP PP -2020. (English) / rank
 
Normal rank

Revision as of 09:52, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Drainage of the city of Brusy
Project in Poland financed by DG Regio

    Statements

    0 references
    6,382,448.11 zloty
    0 references
    1,531,787.5464 Euro
    13 January 2020
    0 references
    9,118,398.02 zloty
    0 references
    2,188,415.5248 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    25 September 2017
    0 references
    31 December 2020
    0 references
    GMINA BRUSY
    0 references
    Przedmiotem realizacji projektu jest zaprojektowanie i wykonanie odwodnienia zachodniej części Brus oraz ul. Kalwaryjnej. Obszar ten jest obecnie zabudowany oraz przewidziany pod przyszłą zabudowę i obejmuje tereny na zachód od ul. Gdańskiej w kierunku rzeki Niechwaszcz oraz tereny przy ulicy Kalwaryjnej. Celem głównym projektu jest zatem zapobieganie zagrożeniom środowiska i ograniczenia niekorzystnego wpływu ich skutków na poziom bezpieczeństwa na terenie miasta i gminy Brusy, poprzez rozwój systemu odbioru i oczyszczania wód opadowych i roztopowych w jego granicach. Cel ten zostanie osiągnięty poprzez wykonanie kompleksowych prac z zakresu budowy 2,778 km kanalizacji deszczowej oraz budowy zbiorników retencyjnych o pojemności 11 115,00 m3 wraz z infrastrukturą towarzyszącą, dzięki czemu 5 149 osób (będących mieszkańcami Brus) odniesie korzyści ze środków ochrony przeciwpowodziowej. Tak zaplanowany projekt wypełnia założenia Działania 11.1 RPO WP na lata 2014-2020. (Polish)
    0 references
    The object of the project is the design and implementation of the drainage of the western parts of Brus and ul. Kalwarna. The area is now built and planned for future construction and covers areas west of ul. Gdansk, in the direction of the River Niewraki, as well as the land located on the Kalwartown Street. The main objective of the project is therefore to prevent environmental risks and minimise the adverse effects of their effects on the level of safety in the city and municipality of Brusy, by developing a system of collection and treatment of rainwater and mites within its borders. This will be achieved by carrying out comprehensive work on the construction of 2.778 km of storm water collection and the construction of retention basins with a capacity of 11 115.00 m³, together with an accompanying infrastructure, which will benefit 5 149 people (who are residents) of flood protection measures. The project thus planned fulfils the objectives of the 11.1-2014 ROP PP -2020. (English)
    0 references

    Identifiers

    RPPM.11.01.00-22-0025/16
    0 references