Investment of renewable energy sources in the municipality of Borzytukhom, Czarna Dąbówka and Tuchka (Q122462): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main a...)
Property / summary
 
The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main aim of the project is to increase the use of energy from RES by the municipalities involved in the project by the construction of RES installations. The power of the planned RES systems was selected on the basis of the volume of electricity and heat demand of the building. It is intended to connect the solar system to the grid, the type of installation on grid. Prosumers will produce it for their own needs. (English)
Property / summary: The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main aim of the project is to increase the use of energy from RES by the municipalities involved in the project by the construction of RES installations. The power of the planned RES systems was selected on the basis of the volume of electricity and heat demand of the building. It is intended to connect the solar system to the grid, the type of installation on grid. Prosumers will produce it for their own needs. (English) / rank
 
Normal rank

Revision as of 09:52, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Investment of renewable energy sources in the municipality of Borzytukhom, Czarna Dąbówka and Tuchka
Project in Poland financed by DG Regio

    Statements

    0 references
    6,944,453.06 zloty
    0 references
    1,666,668.7343999997 Euro
    13 January 2020
    0 references
    9,901,349.88 zloty
    0 references
    2,376,323.9712 Euro
    13 January 2020
    0 references
    83.16 percent
    0 references
    1 October 2018
    0 references
    30 November 2019
    0 references
    GMINA BORZYTUCHOM
    0 references
    Projekt polega na budowie 97 instalacji paneli fotowoltaicznych, 253 instalacji kolektorów słonecznych, 47 instalacji pomp ciepła, 67 instalacji kotłów na biomasę. Projektem objęte zostaną 32 budynki użyteczności publicznej oraz 432 budynki mieszkalne z terenu gminy Borzytuchom, Tuchomie oraz Czarna Dąbrówka. Projekt pozwoli na redukcję 1 718,45 Mg CO2/rok. Łączna moc wybudowanych instalacji OZE wyniesie 3,65 MW. Celem głównym projektu jest zwiększenie wykorzystania energii pochodzącej z OZE przez Gminy biorące udział w projekcie poprzez budowę instalacji OZE. Moc zaplanowanych układów OZE została dobrana w oparciu o wielkość zapotrzebowania na energię elektryczną i cieplną przez dany budynek. Zakłada się podłączenie systemu fotowoltaicznego do sieci – typ instalacji on grid. Prosumenci energii elektrycznej i cieplnej wytwarzać ją będą na własne potrzeby. (Polish)
    0 references
    The project consists of the construction of 97 photovoltaic installations, 253 solar collectors installations, 47 heat pump installations, 67 biomass boiler installations. The project will include 32 public buildings and 432 residential buildings from the municipality of Borzytukhom, Tuchop and Czarna Dąbrówka. The project will allow a reduction of 1 718,45 Mg CO2/rok. The total capacity of the RES installations built will be 3.65 MW. The main aim of the project is to increase the use of energy from RES by the municipalities involved in the project by the construction of RES installations. The power of the planned RES systems was selected on the basis of the volume of electricity and heat demand of the building. It is intended to connect the solar system to the grid, the type of installation on grid. Prosumers will produce it for their own needs. (English)
    0 references

    Identifiers

    RPPM.10.03.01-22-0153/16
    0 references