Solar installation for REG FORM Company with Limited Liability Company limited by its limited liability (Q118602): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substanc...)
Property / summary
 
The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substances. The project will be based on the installation of the PV system on land owned by the Applicant in Mielec at ulica Investors 5. For undertaking a photovoltaic system has been designed for a photovoltaic system consisting of 524 PV modules covering an area of 878.6 m² with a total capacity of at least 151,96 kWp, tj 0,15 MWe. The investment will be carried out by the end of 2020. Stage I — construction of a construction project, Stage II — construction of a photovoltaic installation and obtaining the necessary administrative documents, Stage III — investor supervision of the project as a whole (operations carried out in parallel to stages I and II). Scope of the project: — 290W units — 524 units — 152 kpl — 30 kW — 5 pcs — switchgear DC — 5 pcs, — AC distribution — 5 pcs, — grounding installation — 5 items, — cabling DC — 1880 mb, — cabling AC including cable route from PV to connections in the station: 1 kpl, — production monitoring system — 1 t., — installation of connections for cables between panels, inverters and connections, installation of support structures and PV panels, installation of support structures and PV panels: existing connection at the station with a hit on the site. 3191 at a distance ca. 0.07 km from the land photovoltaic installation. (English)
Property / summary: The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substances. The project will be based on the installation of the PV system on land owned by the Applicant in Mielec at ulica Investors 5. For undertaking a photovoltaic system has been designed for a photovoltaic system consisting of 524 PV modules covering an area of 878.6 m² with a total capacity of at least 151,96 kWp, tj 0,15 MWe. The investment will be carried out by the end of 2020. Stage I — construction of a construction project, Stage II — construction of a photovoltaic installation and obtaining the necessary administrative documents, Stage III — investor supervision of the project as a whole (operations carried out in parallel to stages I and II). Scope of the project: — 290W units — 524 units — 152 kpl — 30 kW — 5 pcs — switchgear DC — 5 pcs, — AC distribution — 5 pcs, — grounding installation — 5 items, — cabling DC — 1880 mb, — cabling AC including cable route from PV to connections in the station: 1 kpl, — production monitoring system — 1 t., — installation of connections for cables between panels, inverters and connections, installation of support structures and PV panels, installation of support structures and PV panels: existing connection at the station with a hit on the site. 3191 at a distance ca. 0.07 km from the land photovoltaic installation. (English) / rank
 
Normal rank

Revision as of 08:50, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar installation for REG FORM Company with Limited Liability Company limited by its limited liability
Project in Poland financed by DG Regio

    Statements

    0 references
    509,575.0 zloty
    0 references
    122,298.0 Euro
    13 January 2020
    0 references
    735,660.0 zloty
    0 references
    176,558.4 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2017
    0 references
    31 December 2020
    0 references
    REG FORM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SP. K.
    0 references
    Głównym celem projektu jest rozpoczęcie przez Wnioskodawcę produkcji energii elektrycznej na potrzeby własne z wykorzystaniem OZE. W wyniku montażu instalacji Inwestor będzie w stanie wyprodukować na potrzeby własne energię elektryczną, która częściowo zaspokoi potrzeby Przedsiębiorstwa do prawidłowego funkcjonowania, zapewni bezpieczeństwo energetyczne przedsiębiorstwa oraz wpłynie pozytywnie na środowisko naturalne poprzez ograniczenie emisji substancji szkodliwych. Przedsięwzięcie polegać będzie na instalacji systemu fotowoltaicznego na gruncie należącym do Wnioskodawcy w Mielcu przy ulicy Inwestorów 5. Dla potrzeb Przedsiębiorstwa zaprojektowany został system fotowoltaiczny składający się z 524 modułów PV na powierzchni 878,6 m2 o łącznej mocy min. 151,96 kWp, tj 0,15 MWe. Inwestycja zostanie zrealizowana do końca 2020 r. Inwestor projektu, REG FORM Sp. z o.o Sp. k., wybrał z zachowaniem zasad konkurencyjności wykonawcę inwestycji, która zostanie zrealizowana w trzech etapach: Etap I –wykonanie projektu budowlanego, Etap II – budowa instalacji fotowoltaicznej oraz uzyskanie niezbędnych dokumentów administracyjnych, Etap III – nadzór inwestorski nad całością przedsięwzięcia (działania wykonywane równolegle z etapami I i II). Zakres projektu: - moduły polikrystaliczne o mocy jednostkowej 290W - 524 szt. - konstrukcje wsporcze 152 kpl, - falowniki 30 kW - 5 szt., - rozdzielnice DC - 5 szt., - rozdzielnice AC - 5 szt., - instalacja uziemiająca - 5 szt., - okablowanie DC - 1880 mb, - okablowanie AC, w tym trasa kablowa od systemu PV do przyłącza w stacji trafo - 1 kpl, - system monitoringu produkcji - 1szt., - wykonanie podłączeń okablowania pomiędzy panelami, falownikami i przyłącza, - montaż konstrukcji wsporczych i paneli PV Miejsce przyłączenia: istniejące przyłącze w stacji trafo, znajdującej się na działce ewid. 3191 w odległości ok. 0,07 km od gruntowej instalacji fotowoltaicznej. (Polish)
    0 references
    The main objective of the project is to start the production of electricity for own use by the applicant using RES. As a result of the installation of an investment plant, the investor will be in a position to produce for its own electricity, which partly satisfies the firm’s needs for proper functioning, will ensure the energy security of the enterprise and will have a positive impact on the environment by reducing emissions of harmful substances. The project will be based on the installation of the PV system on land owned by the Applicant in Mielec at ulica Investors 5. For undertaking a photovoltaic system has been designed for a photovoltaic system consisting of 524 PV modules covering an area of 878.6 m² with a total capacity of at least 151,96 kWp, tj 0,15 MWe. The investment will be carried out by the end of 2020. Stage I — construction of a construction project, Stage II — construction of a photovoltaic installation and obtaining the necessary administrative documents, Stage III — investor supervision of the project as a whole (operations carried out in parallel to stages I and II). Scope of the project: — 290W units — 524 units — 152 kpl — 30 kW — 5 pcs — switchgear DC — 5 pcs, — AC distribution — 5 pcs, — grounding installation — 5 items, — cabling DC — 1880 mb, — cabling AC including cable route from PV to connections in the station: 1 kpl, — production monitoring system — 1 t., — installation of connections for cables between panels, inverters and connections, installation of support structures and PV panels, installation of support structures and PV panels: existing connection at the station with a hit on the site. 3191 at a distance ca. 0.07 km from the land photovoltaic installation. (English)
    0 references

    Identifiers

    RPPK.03.01.00-18-0513/17
    0 references