(Created claim: summary (P836): Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English) | |||||||||||||||
Property / summary: Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English) / qualifier | |||||||||||||||
point in time: 22 November 2021
|
Revision as of 14:12, 22 November 2021
Project Q3713406 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3713406 in France |
Statements
2,518,127.5 Euro
0 references
4,197,545.85 Euro
0 references
59.99 percent
0 references
1 March 2019
0 references
1 March 2020
0 references
GRAND PORT MARITIME DE LA REUNION
0 references
Suite à l’étude de faisabilité, la première solution a été retenue par le maître d'ouvrage à l'issu du rapport d'étude. Cette solution consiste à démolir le tablier construit en 1957 jusqu'au niveau du corbeau réalisé en 2ème phase en 1965. (French)
0 references
Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965. (English)
22 November 2021
0 references