(Created claim: summary (P836): The project is part of the construction of the New Route du Littoral and more particularly on the viaduct at sea part of which each block requires several circular ducts to pass prestressed cables when the concrete is poured., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project is part of the construction of the New Route du Littoral and more particularly on the viaduct at sea part of which each block requires several circular ducts to pass prestressed cables when the concrete is poured. (English) | |||||||||||||||
Property / summary: The project is part of the construction of the New Route du Littoral and more particularly on the viaduct at sea part of which each block requires several circular ducts to pass prestressed cables when the concrete is poured. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is part of the construction of the New Route du Littoral and more particularly on the viaduct at sea part of which each block requires several circular ducts to pass prestressed cables when the concrete is poured. (English) / qualifier | |||||||||||||||
point in time: 22 November 2021
|
Revision as of 14:06, 22 November 2021
Project Q3712755 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3712755 in France |
Statements
9,324.17 Euro
0 references
58,276.07 Euro
0 references
16.0 percent
0 references
1 March 2016
0 references
31 May 2016
0 references
SAS ALDES REUNION
0 references
Le projet s'inscrit dans le cadre de la construction de la Nouvelle Route du Littoral et plus particulièrement sur la partie viaduc en mer dont chaque bloc requiert plusieurs gaines circulaires pour faire passer des câbles de précontraintes lorsque le béton est coulé. (French)
0 references
The project is part of the construction of the New Route du Littoral and more particularly on the viaduct at sea part of which each block requires several circular ducts to pass prestressed cables when the concrete is poured. (English)
22 November 2021
0 references
Identifiers
RE0002861
0 references