Investment in renewable energy sources by the private health care plant of Farmed and Falmed, Elzbieta Falejczyk (Q116918): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project concerns the installation of a 15.37 kW photovoltaic power plant for the production of electricity and an air/air heat pump capacity of 2.9 kW to ensure that the heating equipment is not operated at the service and the cost of total heating is reduced (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of the NZZ Family and Special-Specialis...) |
||
Property / summary | |||
The project concerns the installation of a 15.37 kW photovoltaic power plant for the production of electricity and an air/air heat pump capacity of 2.9 kW to ensure that the heating equipment is not operated at the service and the cost of total heating is reduced (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of the NZZ Family and Special-Specialists Falmed Elżbieta Faleczyk, by setting up a photovoltaic micro-power plant and installing a heat pump. The main objective of the project will be achieved through specific objectives: 1.Construction of a terrestrial photovoltaic plant in 2017 of 15.37 kW in Sejny, ul. 1go Maja 4, with an annual production of 12 260 kWh. 2.Generating 12.26 MWh of electricity from renewable energy sources in 2018; 3.Reduction of C02 emissions to the environment in 2018 by 10,74 mgCO2/MWh 4.Reduction of CO2 emissions in 2018-60.60 % Planned to be purchased (elements of the plant): 3-phase wave 2 kW with a total power of 15.2 kW — mono-crystalline 290-PV panels — 53 pcs. — extruded aluminium structures, cabling, — DC/AC security, 4. The purchase of an air-air heat pump of power output of 2.9 kW 5. The production of 6,96 MWHT from RES in 2018. the project aims to achieve the following: — Number of enterprises receiving support1 in 2017, -Number of EEC-1 electricity generation units built in 2017, -Additional capacity to generate energy from renewable sources (Cl 30) — 15.37 kW in 2017, -Sazinated annual decrease in greenhouse gas emissions (Cl 34) C02-10,74 mgCO2/MWh -production of electricity from newly built installations using POE-12.26 MWh/year. — Number of generation units of thermal energy generated from 2017 to 1 — Manufacture of thermal energy from newly built installations using OF-6,96 MWHT/year (English) | |||
Property / summary: The project concerns the installation of a 15.37 kW photovoltaic power plant for the production of electricity and an air/air heat pump capacity of 2.9 kW to ensure that the heating equipment is not operated at the service and the cost of total heating is reduced (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of the NZZ Family and Special-Specialists Falmed Elżbieta Faleczyk, by setting up a photovoltaic micro-power plant and installing a heat pump. The main objective of the project will be achieved through specific objectives: 1.Construction of a terrestrial photovoltaic plant in 2017 of 15.37 kW in Sejny, ul. 1go Maja 4, with an annual production of 12 260 kWh. 2.Generating 12.26 MWh of electricity from renewable energy sources in 2018; 3.Reduction of C02 emissions to the environment in 2018 by 10,74 mgCO2/MWh 4.Reduction of CO2 emissions in 2018-60.60 % Planned to be purchased (elements of the plant): 3-phase wave 2 kW with a total power of 15.2 kW — mono-crystalline 290-PV panels — 53 pcs. — extruded aluminium structures, cabling, — DC/AC security, 4. The purchase of an air-air heat pump of power output of 2.9 kW 5. The production of 6,96 MWHT from RES in 2018. the project aims to achieve the following: — Number of enterprises receiving support1 in 2017, -Number of EEC-1 electricity generation units built in 2017, -Additional capacity to generate energy from renewable sources (Cl 30) — 15.37 kW in 2017, -Sazinated annual decrease in greenhouse gas emissions (Cl 34) C02-10,74 mgCO2/MWh -production of electricity from newly built installations using POE-12.26 MWh/year. — Number of generation units of thermal energy generated from 2017 to 1 — Manufacture of thermal energy from newly built installations using OF-6,96 MWHT/year (English) / rank | |||
Normal rank |
Revision as of 08:33, 10 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Investment in renewable energy sources by the private health care plant of Farmed and Falmed, Elzbieta Falejczyk |
Project in Poland financed by DG Regio |
Statements
71,500.0 zloty
0 references
110,000.0 zloty
0 references
65.0 percent
0 references
31 October 2018
0 references
31 December 2018
0 references
NIEPUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ PRZYCHODNIA RODZINNA I SPECJALISTYCZNA "FALMED" ELŻBIETA FALEJCZYK
0 references
Projekt dotyczy montażu elektrowni fotowoltaicznej o mocy 15,37 kW do produkcji energii elektrycznej oraz instalacji pompy ciepła typu powietrze-powietrze o mocy 2,9 kW mającej na celu zapewnienie bezobsługowej pracy urządzeń grzewczych i obniżenie kosztów całkowitych ogrzewania(typ2). Celem głównym niniejszego projektu dywersyfikacja przychodów, obniżenie kosztów działalności operacyjnej oraz negatywnego wpływu na środowisko przez NZOZ Przychodnia Rodzinna i Specjalistyczna Falmed Elżbieta Falejczyk poprzez uruchomienie mikroelektrowni fotowoltaicznej i instalację pompy ciepła. Cel główny projektu zostanie osiągnięty poprzez realizację celów szczegółowych: 1.Budowa naziemnej elektrowni fotowoltaicznej w 2017 roku o mocy 15,37kW w miejscowości Sejny przy ul 1go Maja 4 o rocznej produkcji 12260 kWh. 2.Wyprodukowanie 12,26 MWh energii elektrycznej z OZE w 2018 roku; 3.Zmniejszenie emisji C02 do środowiska w 2018 roku o 10,74 mgCO2/MWh 4.Redukcja emisji CO2 w 2018r.- 60,60% Planowane do zakupu środki trwałe (elementy elektrowni): -Falownik 3-fazowy 2 szt o łącznej mocy 15,2kW -panele fotowoltaiczne monokrystaliczne 290 W- 53 szt. -atestowane konstrukcje aluminiowe, -okablowanie, -zabezpieczenie DC/AC, 4. Zakup pompy ciepła typu powietrze-powietrze o mocy 2,9 kW 5. Wyprodukowanie 6,96 MWht energii cieplnej z OZE w 2018 Projekt zakłada osiągnięcie poniższych wskaźników: -Liczba przedsiębiorstw otrzymujących wsparcie-1 w 2017, -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE- 1szt. w 2017, -Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (Cl 30)- 15,37 kW w 2017, -Szacowany roczny spadek emisji gazów cieplarnianych (Cl 34) C02- 10,74 mgCO2/MWh -Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE- 12,26 MWh/ rok. -Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE- 1 szt w 2017 - Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE- 6,96 MWht/rok (Polish)
0 references
The project concerns the installation of a 15.37 kW photovoltaic power plant for the production of electricity and an air/air heat pump capacity of 2.9 kW to ensure that the heating equipment is not operated at the service and the cost of total heating is reduced (typ2). The main objective of this project is to diversify income, reduce the costs of operating activities and the negative environmental impact of the NZZ Family and Special-Specialists Falmed Elżbieta Faleczyk, by setting up a photovoltaic micro-power plant and installing a heat pump. The main objective of the project will be achieved through specific objectives: 1.Construction of a terrestrial photovoltaic plant in 2017 of 15.37 kW in Sejny, ul. 1go Maja 4, with an annual production of 12 260 kWh. 2.Generating 12.26 MWh of electricity from renewable energy sources in 2018; 3.Reduction of C02 emissions to the environment in 2018 by 10,74 mgCO2/MWh 4.Reduction of CO2 emissions in 2018-60.60 % Planned to be purchased (elements of the plant): 3-phase wave 2 kW with a total power of 15.2 kW — mono-crystalline 290-PV panels — 53 pcs. — extruded aluminium structures, cabling, — DC/AC security, 4. The purchase of an air-air heat pump of power output of 2.9 kW 5. The production of 6,96 MWHT from RES in 2018. the project aims to achieve the following: — Number of enterprises receiving support1 in 2017, -Number of EEC-1 electricity generation units built in 2017, -Additional capacity to generate energy from renewable sources (Cl 30) — 15.37 kW in 2017, -Sazinated annual decrease in greenhouse gas emissions (Cl 34) C02-10,74 mgCO2/MWh -production of electricity from newly built installations using POE-12.26 MWh/year. — Number of generation units of thermal energy generated from 2017 to 1 — Manufacture of thermal energy from newly built installations using OF-6,96 MWHT/year (English)
0 references
Identifiers
RPPD.05.01.00-20-0450/17
0 references