Construction of modern tourist and leisure facilities in the municipality of Iwatowice in the municipality of Ivanowice (Q112886): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The scope of the project is made up of the following elements: a. a preparatory work. Central tables: general information 1, Nordic walkingszt 1, 1, a wood 23,4 mszt 1, wooden 23.4 m of grillemszt of 1jka, with a wooden litter layer 16rack coated on a 4rack frame on 30 × 45 cm at × cm 23 cm in seat mb 38C. Space and mouth zone: safe bed 2 375, with a polyurethane waving (2 275), gravel flange (m² 705flange) concrete 8 × 25 cm mb 670hound: a wood...)
Property / summary
 
The scope of the project is made up of the following elements: a. a preparatory work. Central tables: general information 1, Nordic walkingszt 1, 1, a wood 23,4 mszt 1, wooden 23.4 m of grillemszt of 1jka, with a wooden litter layer 16rack coated on a 4rack frame on 30 × 45 cm at × cm 23 cm in seat mb 38C. Space and mouth zone: safe bed 2 375, with a polyurethane waving (2 275), gravel flange (m² 705flange) concrete 8 × 25 cm mb 670hound: a wooden arboreumm2 52, special arboretum humusm2 270, a rock loss of grillemm2 70D. Recreational and leisure area for the 1th set of toys. for children aged 1, the toy service 1, the toy is a young 1roundabouts equivalent to an equivalent 1orbits of 1orbiting the 1 kplwiser kplwecz 1 kplom 1 kplE. Construction work for the wall of the terrain mb 23-fence of 2.20 m for toittoi 4,0 x 3.0 m mb 12,5mb of the sanitary appliances Toi Toi and including one for people with a disability of 2pergol from bemab 30arboretum, 1 kplf. 1 kplF. Construction of the OŚWIETLENIApoles: part of 19, 8: spherical 50anywhere 19, directional 35nfold 8kwbw mb 60kabel: from the connector to the measurement cabinet mb 40, for the ground area mb 385, for the lighting of the parking area mb 215. according to 1G electrification. The rest of the project’s project location is ensured by public communication and will be in operation throughout the year. (English)
Property / summary: The scope of the project is made up of the following elements: a. a preparatory work. Central tables: general information 1, Nordic walkingszt 1, 1, a wood 23,4 mszt 1, wooden 23.4 m of grillemszt of 1jka, with a wooden litter layer 16rack coated on a 4rack frame on 30 × 45 cm at × cm 23 cm in seat mb 38C. Space and mouth zone: safe bed 2 375, with a polyurethane waving (2 275), gravel flange (m² 705flange) concrete 8 × 25 cm mb 670hound: a wooden arboreumm2 52, special arboretum humusm2 270, a rock loss of grillemm2 70D. Recreational and leisure area for the 1th set of toys. for children aged 1, the toy service 1, the toy is a young 1roundabouts equivalent to an equivalent 1orbits of 1orbiting the 1 kplwiser kplwecz 1 kplom 1 kplE. Construction work for the wall of the terrain mb 23-fence of 2.20 m for toittoi 4,0 x 3.0 m mb 12,5mb of the sanitary appliances Toi Toi and including one for people with a disability of 2pergol from bemab 30arboretum, 1 kplf. 1 kplF. Construction of the OŚWIETLENIApoles: part of 19, 8: spherical 50anywhere 19, directional 35nfold 8kwbw mb 60kabel: from the connector to the measurement cabinet mb 40, for the ground area mb 385, for the lighting of the parking area mb 215. according to 1G electrification. The rest of the project’s project location is ensured by public communication and will be in operation throughout the year. (English) / rank
 
Normal rank

Revision as of 08:18, 10 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of modern tourist and leisure facilities in the municipality of Iwatowice in the municipality of Ivanowice
Project in Poland financed by DG Regio

    Statements

    0 references
    485,941.16 zloty
    0 references
    116,625.87839999999 Euro
    13 January 2020
    0 references
    881,069.9 zloty
    0 references
    211,456.77599999998 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    1 September 2016
    0 references
    31 October 2018
    0 references
    GMINA IWANOWICE
    0 references
    Zakres rzeczowy projektu skład się z następujących elementów:A. PRACE PRZYGOTOWAWCZEDok. techniczna szt1B. STREFA CENTRALNA tablice: informacyjna ogólnaszt 1, program. nordic walkingszt 1, witaczszt 1, z regul. strefa maluchaszt 1, z regul. strefa dzieciszt 1altana: drewniana 23,4 mszt 1, drewniana 23,4 m z grillemszt 1ławka drewniana bez oparciaszt 23kosz na śmieci drewniany z pokrywąszt 16stojak na roweryszt 4murki w arboretum 30 x 45 cm siedziska mb 38C. STREFA SPACEROWA I NAWIERZCHNIEnawierzchnia: bezpieczna z korym2 375, bezp. poliuretanowam2 275, żwirowa dojśćm2 705obrzeża betonowe 8 x 25 cm mb 670nawierzchnie: drewniana arboretumm2 52, specjalna arboretum humusm2 270, kamienna przy altanie z grillemm2 70D. STREFA REKREACJI I SPĘDZANIA CZASU WOLNEGOhuśtawka bocianie gniazdoszt 1zestaw zabaw. dla najmłodszychszt 1huśtawka wagowaszt 1bujak sprężynowyszt 1karuzela czteroramiennaszt 1piaskownica zamykanaszt 1sześciokątny zestaw sprawn.szt 1zestaw: sprawnośc. dla dzieci star.szt 1, zabawowy dla dzieci młod.szt 1karuzela typu równoważniaszt 1orbitrek 1 kplwyciskanie siedząc 1 kpltwister 1 kplbiegacz 1 kplwahadło 1 kplE. ROBOTY BUDOWLANErozbiórka muru i uporząkowanie terenu mb 23ogrodzenie 2,20m dla toitoi 4,0 x 3,0m mb 12,5urządzenia sanitarne toi toi w tym jeden dla osób niepełnosprawnychszt 2pergola z belek mb 30arboretum edukacyjnoekologicznoprzyrodnicze 1 kplmonitoring wizyjny WiFi 6 kamer 1 kplF. BUDOWA OŚWIETLENIAsłupy: oświetl. parkoweszt 19, oświetl. wysokieszt 8oprawy: kuliste do 50wszt 19, kierunkowe 35wszt 8listwy led rgbw mb 60kabel: od złącza do szafki pomiarowej mb 40, dla oświetl. parkowego mb 385, dla oświetl. parkingu mb 215szafka pomiarowa wg proj. elektrykiszt 1G. POZOSTAŁE KOSZTYNadzór inwestorskiZarządzanie projektemDo lokalizacji projektu jest zapewniona komunikacja publiczna.Obiekt będzie funkcjonował cały rok. (Polish)
    0 references
    The scope of the project is made up of the following elements: a. a preparatory work. Central tables: general information 1, Nordic walkingszt 1, 1, a wood 23,4 mszt 1, wooden 23.4 m of grillemszt of 1jka, with a wooden litter layer 16rack coated on a 4rack frame on 30 × 45 cm at × cm 23 cm in seat mb 38C. Space and mouth zone: safe bed 2 375, with a polyurethane waving (2 275), gravel flange (m² 705flange) concrete 8 × 25 cm mb 670hound: a wooden arboreumm2 52, special arboretum humusm2 270, a rock loss of grillemm2 70D. Recreational and leisure area for the 1th set of toys. for children aged 1, the toy service 1, the toy is a young 1roundabouts equivalent to an equivalent 1orbits of 1orbiting the 1 kplwiser kplwecz 1 kplom 1 kplE. Construction work for the wall of the terrain mb 23-fence of 2.20 m for toittoi 4,0 x 3.0 m mb 12,5mb of the sanitary appliances Toi Toi and including one for people with a disability of 2pergol from bemab 30arboretum, 1 kplf. 1 kplF. Construction of the OŚWIETLENIApoles: part of 19, 8: spherical 50anywhere 19, directional 35nfold 8kwbw mb 60kabel: from the connector to the measurement cabinet mb 40, for the ground area mb 385, for the lighting of the parking area mb 215. according to 1G electrification. The rest of the project’s project location is ensured by public communication and will be in operation throughout the year. (English)
    0 references

    Identifiers

    RPMP.06.03.01-12-0460/16
    0 references