Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work (Q3687013): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
||
Property / contained in NUTS | |||
Property / contained in NUTS: Martinique / rank | |||
Normal rank |
Revision as of 11:30, 22 November 2021
Project Q3687013 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Demolition, reconstruction of Schoelcher High School — Tranche 1: Deconstruction, Supporting, Terraces, VRD, Outdoor fittings & Structure second work |
Project Q3687013 in France |
Statements
18,059,430.35 Euro
0 references
42,393,028.99 Euro
0 references
42.6 percent
0 references
1 January 2017
0 references
30 March 2020
0 references
COLLECTIVITE TERRITORIALE DE MARTINIQUE
0 references
97200
0 references
En 2006, la Région a retenu la reconstruction du lycée Victor Schoelcher sur son site actuel. En effet, les bâtiments en service ont été construits entre 1933 et 1937. Cette reconstruction a été motivé par l’état de la structure du bâti, l’évolution des dispositions pédagogiques et l’exigence notamment de nouvelles mesures de sécurité et d’accessibilité aux PMR qui ne permettaient pas d’envisager une réhabilitation dans des conditions satisfaisantes de sûreté, de fonctionnalité, de confort, de coût de travaux et de coût de maintenance. Toutefois, la prise en compte de l’indéniable intérêt de cet ensemble architectural de type moderniste a conduit à renforcer la proposition du projet lauréat du concours, d’une conservation et d’une rénovation des bâtiments et escaliers constituant l’entrée historique. Pour mémoire, jusqu’à juin 2016, ce lycée d’enseignement général et technologique accueillait une communauté scolaire regroupée dans 18 bâtiments et composée de 1 426 élèves, 125 enseignants et 75 personnels. La capacité du nouveau lycée sera d’environ 1 400 élèves et étudiants avec un renforcement du post-bac. L’opération comprend la démolition, la reconstruction et la mise en place d’un nouvel équipement aux normes parasismiques. (French)
0 references
In 2006, the Region retained the reconstruction of Victor Schoelcher High School at its current site. Indeed, the buildings in service were built between 1933 and 1937. This reconstruction was motivated by the state of the structure of the building, the evolution of educational arrangements and the requirement, in particular, of new safety and accessibility measures for PRMs which did not allow for rehabilitation under satisfactory conditions of safety, functionality, comfort, cost of work and maintenance costs. However, taking into account the undeniable interest of this modernist architectural ensemble has led to strengthening the proposal of the winning project of the competition, for the conservation and renovation of the buildings and staircases constituting the historic entrance. For the record, until June 2016, this school of general and technological education hosted a school community grouped in 18 buildings and composed of 1,426 pupils, 125 teachers and 75 staff. The capacity of the new high school will be about 1,400 students with a reinforcement of the post-bac. The operation includes the demolition, reconstruction and installation of new seismic equipment. (English)
18 November 2021
0 references
Identifiers
MQ0015413
0 references