31028 Biomass heating and heat network La Romaine (Q3698772): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Construction of a centralised biomass boiler room with heating network feeding 2 communal buildings in Vezet-La Romaine. The installation includes a 60 kW automatic boiler, coupled with a 1500-litre balloon. The energy produced annually is estimated at 110 MWh, with a consumption of 24 tonnes of pellets. Substation requirements are 79 MWh for a total capacity of 49 kW. The CO2 emission saving generated by this operation is 24 tonnes., translated...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
31028 Biomass heating and heat network La Romaine

Revision as of 11:29, 22 November 2021

Project Q3698772 in France
Language Label Description Also known as
English
31028 Biomass heating and heat network La Romaine
Project Q3698772 in France

    Statements

    0 references
    38,600.0 Euro
    0 references
    82,483.96 Euro
    0 references
    46.8 percent
    0 references
    4 April 2018
    0 references
    26 March 2019
    0 references
    Commune de La Romaine
    0 references
    Réalisation d'une chaufferie biomasse centralisée avec réseau de chaleur alimentant 2 bâtiments communaux à Vezet-La Romaine. L'installation comprend une chaudière automatique de 60kW, couplée à un ballon-tampon de 1500 litres. L’énergie produite annuellement est estimée à 110 MWh, pour une consommation de 24 tonnes de granulés. Les besoins en sous-stations sont de 79 MWh pour une puissance totale de 49 kW. L'économie d'émission de CO2 générée par cette opération est de 24 tonnes. (French)
    0 references
    Construction of a centralised biomass boiler room with heating network feeding 2 communal buildings in Vezet-La Romaine. The installation includes a 60 kW automatic boiler, coupled with a 1500-litre balloon. The energy produced annually is estimated at 110 MWh, with a consumption of 24 tonnes of pellets. Substation requirements are 79 MWh for a total capacity of 49 kW. The CO2 emission saving generated by this operation is 24 tonnes. (English)
    22 November 2021
    0 references

    Identifiers

    FC0019391
    0 references