Thermal improvement of 30 housing units in Vittel — Tranches 2-2Bis — Buildings 1-2-3-7 (Q3698183): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): These buildings built in 1955-56 are no longer isolated. They are connected to the communal heating network. The beginning of the district has already been processed, this operation will finalise the thermal improvement. The objectives are to: — Reduction of tenants’ charges — Providing extra comfort by removing cold walls — Ensure good ventilation of the dwellings — Reducing attractiveness to buildings, translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Thermal improvement of 30 housing units in Vittel — Tranches 2-2Bis — Buildings 1-2-3-7

Revision as of 10:56, 22 November 2021

Project Q3698183 in France
Language Label Description Also known as
English
Thermal improvement of 30 housing units in Vittel — Tranches 2-2Bis — Buildings 1-2-3-7
Project Q3698183 in France

    Statements

    0 references
    166,079.2 Euro
    0 references
    474,512.0 Euro
    0 references
    35.0 percent
    0 references
    1 January 2016
    0 references
    31 December 2019
    0 references
    VOSGELIS OFFICE PUBLIC DE L'HABITAT DU DEPARTEMENT DES VOSGES
    0 references

    48°12'40.00"N, 5°57'23.15"E
    0 references
    88800
    0 references
    Ces bâtiments construits en 1955-56 ne sont plus isolés. Ils sont raccordés sur le réseau de chauffage communal. Le début du quartier a déjà été traité, cette opération en finalisera l'amélioration thermique. Les objectifs recherchés sont les suivants: - Diminution des charges des locataires - Apporter un surplus de confort en supprimant les parois froides - S'assurer d'une bonne ventilation des logements - Redonner de l'attractivité aux bâtiments (French)
    0 references
    These buildings built in 1955-56 are no longer isolated. They are connected to the communal heating network. The beginning of the district has already been processed, this operation will finalise the thermal improvement. The objectives are to: — Reduction of tenants’ charges — Providing extra comfort by removing cold walls — Ensure good ventilation of the dwellings — Reducing attractiveness to buildings (English)
    22 November 2021
    0 references

    Identifiers

    LO0019033
    0 references