Connection of the investment site ‘KomisPort’ through the construction of a road along with the necessary infrastructure. (Q115097): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project consists of the construction of a new section of the municipal road of 0.295 km long, connecting the street. Kloericka (regional road No 423) from ul. Elewatorowa in Kędzierzyn-Koźle, at the boundary of zone B of conservation protection. The planned road is designed to communicate investment sites in the surroundings of the Port of Koźle with regional road No 423. As a result, the intersection was designed to be crossed with the prov...)
Property / summary
 
The project consists of the construction of a new section of the municipal road of 0.295 km long, connecting the street. Kloericka (regional road No 423) from ul. Elewatorowa in Kędzierzyn-Koźle, at the boundary of zone B of conservation protection. The planned road is designed to communicate investment sites in the surroundings of the Port of Koźle with regional road No 423. As a result, the intersection was designed to be crossed with the provincial road by coordinating and coordinating the junction to the existing road (length of the regional road built: 0.026 km, length of the upgraded regional road 0.127 km). Along the new road, a pedestrian cycle is foreseen, which will be integrated into the urban cycle network in the future by improving the safety of road users travelling, inter alia, to their place of residence and to work (1 draft). The project is directly linked to the project: “Strengthening the investment potential of the Kędzierzyn-Strzelki Subregion by arming the investment areas adjacent to the Port of Koźle” under Sub-measure 2.2.1. ROP PP 2014-2020, which consists of the construction of an internal road combined with an Elementary Street and arming the investment areas by bringing them to the sanitary, storm-water system, the water network, the telex network and the teletechnical channel. The construction of the municipal road connecting the Elewatorsk street with Kłodnicka and leading directly to or from the newly formed part of the investment area is therefore one of the elements of a comprehensive investment to strengthen the region’s economic potential. This project will be carried out in partnership with the Opolskie Region. The project partner will be responsible for the proper supervision of the works carried out within the intersection and the maintenance of the built and rebuilt infrastructure. (English)
Property / summary: The project consists of the construction of a new section of the municipal road of 0.295 km long, connecting the street. Kloericka (regional road No 423) from ul. Elewatorowa in Kędzierzyn-Koźle, at the boundary of zone B of conservation protection. The planned road is designed to communicate investment sites in the surroundings of the Port of Koźle with regional road No 423. As a result, the intersection was designed to be crossed with the provincial road by coordinating and coordinating the junction to the existing road (length of the regional road built: 0.026 km, length of the upgraded regional road 0.127 km). Along the new road, a pedestrian cycle is foreseen, which will be integrated into the urban cycle network in the future by improving the safety of road users travelling, inter alia, to their place of residence and to work (1 draft). The project is directly linked to the project: “Strengthening the investment potential of the Kędzierzyn-Strzelki Subregion by arming the investment areas adjacent to the Port of Koźle” under Sub-measure 2.2.1. ROP PP 2014-2020, which consists of the construction of an internal road combined with an Elementary Street and arming the investment areas by bringing them to the sanitary, storm-water system, the water network, the telex network and the teletechnical channel. The construction of the municipal road connecting the Elewatorsk street with Kłodnicka and leading directly to or from the newly formed part of the investment area is therefore one of the elements of a comprehensive investment to strengthen the region’s economic potential. This project will be carried out in partnership with the Opolskie Region. The project partner will be responsible for the proper supervision of the works carried out within the intersection and the maintenance of the built and rebuilt infrastructure. (English) / rank
 
Normal rank

Revision as of 11:50, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Connection of the investment site ‘KomisPort’ through the construction of a road along with the necessary infrastructure.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,362,724.43 zloty
    0 references
    327,053.86319999996 Euro
    13 January 2020
    0 references
    2,478,131.38 zloty
    0 references
    594,751.5312 Euro
    13 January 2020
    0 references
    54.99 percent
    0 references
    25 September 2017
    0 references
    30 November 2018
    0 references
    GMINA KĘDZIERZYN-KOŹLE
    0 references
    Projekt polega na budowie nowego odcinka drogi gminnej o długości 0,295 km, łączącej ul. Kłodnicką (drogę wojewódzką nr 423) z ul. Elewatorową w Kędzierzynie-Koźlu, w granicy strefy B ochrony konserwatorskiej. Projektowana droga ma za zadanie komunikować tereny inwestycyjne w otoczeniu Portu Koźle z drogą wojewódzką nr 423. Dlatego zaprojektowano skrzyżowanie z drogą wojewódzką dowiązując się i koordynując kształt skrzyżowania do istniejącej jezdni (długość wybudowanej drogi wojewódzkiej - 0,026 km, długość przebudowanej drogi wojewódzkiej 0,127 km). Wzdłuż nowej drogi przewidziano ciąg pieszo-rowerowy, który w przyszłości włączony zostanie do sieci ścieżek rowerowych miasta zapewniając poprawę bezpieczeństwa uczestników ruchu drogowego dojeżdżających m.in. do miejsca zamieszkania oraz pracy (1 projekt). Przedmiotowy projekt jest bezpośrednio powiązany z przedsięwzięciem pn. „Wzmocnienie potencjału inwestycyjnego Subregionu Kędzierzyńsko-Strzeleckiego poprzez uzbrojenie terenów inwestycyjnych przylegających do Portu w Koźlu” realizowanym w ramach Poddziałania 2.2.1. RPO WO 2014-2020, który polega na budowie drogi wewnętrznej połączonej z ulicą Elewatorową i uzbrojeniu terenów inwestycyjnych poprzez doprowadzenie do nich sieci sanitarnej, deszczowej, wodociągowej, sieć telekom. i kanał teletechniczny. Budowa drogi gminnej łączącej ulicę Elewatorową z Kłodnicką i prowadzącą bezpośrednio do lub przez nowo powstałe tereny inwestycyjne jest zatem jednym z elementów kompleksowej inwestycji polegającej na wzmocnieniu potencjału gospodarczego regionu. Niniejszy projekt realizowany będzie w partnerstwie z Województwem Opolskim. Partner projektu odpowiedzialny będzie za właściwy nadzór prac prowadzonych w obrębie skrzyżowania oraz zachowanie trwałości wybudowanej i przebudowanej infrastruktury. (Polish)
    0 references
    The project consists of the construction of a new section of the municipal road of 0.295 km long, connecting the street. Kloericka (regional road No 423) from ul. Elewatorowa in Kędzierzyn-Koźle, at the boundary of zone B of conservation protection. The planned road is designed to communicate investment sites in the surroundings of the Port of Koźle with regional road No 423. As a result, the intersection was designed to be crossed with the provincial road by coordinating and coordinating the junction to the existing road (length of the regional road built: 0.026 km, length of the upgraded regional road 0.127 km). Along the new road, a pedestrian cycle is foreseen, which will be integrated into the urban cycle network in the future by improving the safety of road users travelling, inter alia, to their place of residence and to work (1 draft). The project is directly linked to the project: “Strengthening the investment potential of the Kędzierzyn-Strzelki Subregion by arming the investment areas adjacent to the Port of Koźle” under Sub-measure 2.2.1. ROP PP 2014-2020, which consists of the construction of an internal road combined with an Elementary Street and arming the investment areas by bringing them to the sanitary, storm-water system, the water network, the telex network and the teletechnical channel. The construction of the municipal road connecting the Elewatorsk street with Kłodnicka and leading directly to or from the newly formed part of the investment area is therefore one of the elements of a comprehensive investment to strengthen the region’s economic potential. This project will be carried out in partnership with the Opolskie Region. The project partner will be responsible for the proper supervision of the works carried out within the intersection and the maintenance of the built and rebuilt infrastructure. (English)
    0 references

    Identifiers

    RPOP.06.01.00-16-0025/17
    0 references