Integrated infrastructure for low-emission transport in the town of Tarnów and the market in the town of Tuchów (Q112527): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project shall comprise the following works: construction of the ParkRide parking area with the journeys i.e. parking spaces with the crossing points and the journeys made by the municipal road in the construction of the railway street in Tuchów to rebuild existing pavements and build new pedestrian lines in order to support the construction of the construction of the built car park, the renovation and construction of the drainage system, i.e...)
Property / summary
 
The project shall comprise the following works: construction of the ParkRide parking area with the journeys i.e. parking spaces with the crossing points and the journeys made by the municipal road in the construction of the railway street in Tuchów to rebuild existing pavements and build new pedestrian lines in order to support the construction of the construction of the built car park, the renovation and construction of the drainage system, i.e. the replacement of the existing water wells within the ul. The construction of a water waste water system in the area of the built construction site, with the discharge of water to the existing combined channel, for the construction of existing roads with the construction of a bicycle and monitoring installation for the construction of an existing economic building, along with the construction of the construction of the construction of an existing economic building, including the connection of the mains, the sanitary sewage system and the electricity.Parking will be used only for those who park the car and to switch to a means of public transport. To this end, information boards will be installed. In addition, a temporary verification of the use of the parking area by staff of the Town Hall will be carried out. The costs of the railway street are planned only to the extent necessary to travel to the parking area of the municipal road from the provincial road 977. Length The project has a railway project of 278.7 m, with the car park located in parallel to the street. In view of the higher costs of the project than originally foreseen in the Charter, part of the costs of the railway street is excluded from the eligibility. the project provides a solution for improving the safety of passengers, i.e. monitoring. The selected lighting poles have been installed in order to install the monitoring cameras. The parking will be free of charge. Foreseen in the draft, ticketing and exit gate facilities will not be implemented. As a result, the holders of the MKA will be able to use the car park without hindrance. In the frame of the MKA I can turn onto the train to Cracow by Tarnow and Mr Sącz. (English)
Property / summary: The project shall comprise the following works: construction of the ParkRide parking area with the journeys i.e. parking spaces with the crossing points and the journeys made by the municipal road in the construction of the railway street in Tuchów to rebuild existing pavements and build new pedestrian lines in order to support the construction of the construction of the built car park, the renovation and construction of the drainage system, i.e. the replacement of the existing water wells within the ul. The construction of a water waste water system in the area of the built construction site, with the discharge of water to the existing combined channel, for the construction of existing roads with the construction of a bicycle and monitoring installation for the construction of an existing economic building, along with the construction of the construction of the construction of an existing economic building, including the connection of the mains, the sanitary sewage system and the electricity.Parking will be used only for those who park the car and to switch to a means of public transport. To this end, information boards will be installed. In addition, a temporary verification of the use of the parking area by staff of the Town Hall will be carried out. The costs of the railway street are planned only to the extent necessary to travel to the parking area of the municipal road from the provincial road 977. Length The project has a railway project of 278.7 m, with the car park located in parallel to the street. In view of the higher costs of the project than originally foreseen in the Charter, part of the costs of the railway street is excluded from the eligibility. the project provides a solution for improving the safety of passengers, i.e. monitoring. The selected lighting poles have been installed in order to install the monitoring cameras. The parking will be free of charge. Foreseen in the draft, ticketing and exit gate facilities will not be implemented. As a result, the holders of the MKA will be able to use the car park without hindrance. In the frame of the MKA I can turn onto the train to Cracow by Tarnow and Mr Sącz. (English) / rank
 
Normal rank

Revision as of 11:48, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Integrated infrastructure for low-emission transport in the town of Tarnów and the market in the town of Tuchów
Project in Poland financed by DG Regio

    Statements

    0 references
    934,964.58 zloty
    0 references
    224,391.4992 Euro
    13 January 2020
    0 references
    2,061,478.45 zloty
    0 references
    494,754.828 Euro
    13 January 2020
    0 references
    74.34 percent
    0 references
    1 January 2018
    0 references
    31 December 2018
    0 references
    GMINA TUCHÓW
    0 references
    Projekt obejmuje następujące roboty budowlane: budowa parkingu ParkRide z dojazdami tj. miejsc postojowych z jezdnią manewrową i zjazdami z drogi gminnej przebudowę ulicy Kolejowej w Tuchowie remont istniejących chodników i budowę nowych ciągów pieszych zapewniających obsługę komunikacyjną budowanego parkingu remont i budowę systemu odwodnienia tj. wymianę istniejących studzienek wodnościekowych w ciągu ul. Kolejowej, budowę odcinka kanalizacji deszczowej na obszarze budowanego parkingu z odprowadzeniem wód do istniejącego kanału ogólnospławnego remont istniejących zjazdów w ciągu remontowanego chodnika montaż prefabrykowanych wiat rowerowych ze stojakami budowę sieci oświetlenia ulicznego i monitoringu przebudowę istniejącego budynku gospodarczego, wraz wykonaniem przyłącza sieci wodociągowej, kanalizacji sanitarnej i sieci elektrycznej.Parking wykorzystywany będzie wyłącznie na potrzeby osób parkujących samochód i przesiadających się na środek komunikacji zbiorowej. W tym celu zainstalowane zostaną tablice informacyjne. Ponadto prowadzona będzie czasowa weryfikacja wykorzystania parkingu przez pracowników Urzędu Miasta. Koszty ulicy Kolejowej zaplanowano wyłącznie w niezbędnym zakresie jest to dojazd do parkingu droga gminna z drogi wojewódzkiej 977. Długość ul. Kolejowej w ramach projektu wynosi 278,7 m przy czym parking zlokalizowany jest równolegle z ulicą. Z uwagi na wyższe koszty projektu niż pierwotnie planowano w Karcie wyłączono z kwalifikowalności część kosztów ulicy Kolejowej.W projekcie przewidziano rozwiązanie służące podniesieniu bezpieczeństwa podróżnych tj. monitoring. Na wybranych masztach oświetleniowych przewidziano montaż kamer monitoringu. Parking będzie nieodpłatny. Przewidziany w projekcie bud. biletomat i bramki wjazduwyjazdu nie będą realizowane. W związku z tym osoby posiadające MKA będą mogły bez przeszkód korzystać z parkingu. W ramach MKA mogę przesiąść się na pociąg do Krakowa przez Tarnów oraz N. Sącza. (Polish)
    0 references
    The project shall comprise the following works: construction of the ParkRide parking area with the journeys i.e. parking spaces with the crossing points and the journeys made by the municipal road in the construction of the railway street in Tuchów to rebuild existing pavements and build new pedestrian lines in order to support the construction of the construction of the built car park, the renovation and construction of the drainage system, i.e. the replacement of the existing water wells within the ul. The construction of a water waste water system in the area of the built construction site, with the discharge of water to the existing combined channel, for the construction of existing roads with the construction of a bicycle and monitoring installation for the construction of an existing economic building, along with the construction of the construction of the construction of an existing economic building, including the connection of the mains, the sanitary sewage system and the electricity.Parking will be used only for those who park the car and to switch to a means of public transport. To this end, information boards will be installed. In addition, a temporary verification of the use of the parking area by staff of the Town Hall will be carried out. The costs of the railway street are planned only to the extent necessary to travel to the parking area of the municipal road from the provincial road 977. Length The project has a railway project of 278.7 m, with the car park located in parallel to the street. In view of the higher costs of the project than originally foreseen in the Charter, part of the costs of the railway street is excluded from the eligibility. the project provides a solution for improving the safety of passengers, i.e. monitoring. The selected lighting poles have been installed in order to install the monitoring cameras. The parking will be free of charge. Foreseen in the draft, ticketing and exit gate facilities will not be implemented. As a result, the holders of the MKA will be able to use the car park without hindrance. In the frame of the MKA I can turn onto the train to Cracow by Tarnow and Mr Sącz. (English)
    0 references

    Identifiers

    RPMP.04.05.02-12-0336/17
    0 references