(Created claim: summary (P836): The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory costs:...) |
||
Property / summary | |||
The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory costs: 1.1 energy audits; 1.2 financial and economic analysis; 1.3 functional-utility program 2.Thermomodernisation of the Gminny Centre for Social Assistance — insulation of partitions (walls, ceilings), installation of counter 3.kindergarten branch in Marcinkowicach — insulation of partitions (walls, ceiling); replacement of heat sources, photovoltaic system with meter 4.Primary school in Januszowa — insulation of partitioning partitions. (walls), replacement of windows, door, installation of the heat meter 5. (walls, ceilings), replacement of the heat source — biomass, heat counter, co.7.Primary school in Ridziałów — insulation of partitions (walls, ceiling), replacement of windows, doors, replacement of the heat source — biomass, heat counter, modernisation of c.o. of regulation 8. school assembly in Chomraice — insulation of partitions (walls, ceiling), source of heat and hot water — gas, heat and hot water meters, control of c.9. school assembly in Marcinkowicach — insulation of partitioning systems. (walls, ceiling), exchange of doors, exchange of regulated and heat meters, heat meters. 10.School assembly in Paszyn — insulation of bulkheads (walls, ceilings), replacement of doors, replacement of hot., replacement of the heat source — gas, Csurvival meter continuing at point Q of the grant application (English) | |||
Property / summary: The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory costs: 1.1 energy audits; 1.2 financial and economic analysis; 1.3 functional-utility program 2.Thermomodernisation of the Gminny Centre for Social Assistance — insulation of partitions (walls, ceilings), installation of counter 3.kindergarten branch in Marcinkowicach — insulation of partitions (walls, ceiling); replacement of heat sources, photovoltaic system with meter 4.Primary school in Januszowa — insulation of partitioning partitions. (walls), replacement of windows, door, installation of the heat meter 5. (walls, ceilings), replacement of the heat source — biomass, heat counter, co.7.Primary school in Ridziałów — insulation of partitions (walls, ceiling), replacement of windows, doors, replacement of the heat source — biomass, heat counter, modernisation of c.o. of regulation 8. school assembly in Chomraice — insulation of partitions (walls, ceiling), source of heat and hot water — gas, heat and hot water meters, control of c.9. school assembly in Marcinkowicach — insulation of partitioning systems. (walls, ceiling), exchange of doors, exchange of regulated and heat meters, heat meters. 10.School assembly in Paszyn — insulation of bulkheads (walls, ceilings), replacement of doors, replacement of hot., replacement of the heat source — gas, Csurvival meter continuing at point Q of the grant application (English) / rank | |||
Normal rank |
Revision as of 11:42, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of public buildings and increasing the use of renewable energy sources in the commune of Chełłm |
Project in Poland financed by DG Regio |
Statements
1,754,506.87 zloty
0 references
5,422,091.43 zloty
0 references
1,301,301.9431999999 Euro
0.24 Euro
13 January 2020
0 references
41.99 percent
0 references
30 September 2016
0 references
28 December 2018
0 references
GMINA CHEŁMIEC
0 references
Inwestycja polega na przeprowadzeniu prac termomodernizacyjnych, modernizacji systemów grzewczych, zastosowaniu OZE (fotowoltaika, kolektory słoneczne, biomasa) w 11 budynkach użyteczności publicznej. Optymalny zakres prac określono na podstawie audytów energetycznych opracowanych zgodnie z „Metodyką ...”: Zakres prac wynikający z audytu oraz pozostałe niezbędne elementy obejmują następujące zadania i działania (opisane szczegółowo w punkcie C.2.3): 1.Koszty przygotowawcze: 1.1 audyty energetyczne; 1.2 analiza finansowo-ekonomiczna; 1.3 program funkcjonalno-użytkowy 2.Termomodernizacja - Gminny Ośrodek Pomocy Społecznej - docieplenie przegród zewn. (ściany, stropy), montaż licznika 3.Oddział Przedszkolny w Marcinkowicach - docieplenie przegród zewn. (ściany, strop); wymiana źródeł ciepła, system fotowoltaiczny z licznikiem 4.Szkoła Podstawowa w Januszowej - docieplenie przegród zewn. (ściany), wymiana okien, drzwi, montaż licznika ciepła 5.Szkoła Podstawowa w Klęczanach - docieplenie przegród zewn.(ściany, stropy), wymiana luksferów, wymiana źródła ciepła – biomasa, licznik ciepła, modernizacja inst. c.o. 6.Szkoła Podstawowa w Niskowej - docieplenie przegród zewn. (ściany, stropy), wymiana źródła ciepła - biomasa, licznik ciepła, wymiana inst. c.o. 7.Szkoła Podstawowa w Rdziostowie - docieplenie przegród zewn. (ściany, strop), wymiana okien, drzwi, wymiana źródła ciepła - biomasa, licznik ciepła, modernizacja inst. c.o. z regulacją 8.Zespół Szkół w Chomranicach - docieplenie przegród zewn. (ściany, strop), wymiana źródła ciepła i c.w.u - gaz, liczniki ciepła i ciepłej wody, regulacja inst. c.o. 9.Zespół Szkół w Marcinkowicach - docieplenie przegród zewn. (ściany, strop), wymiana drzwi, wymiana inst. c.o. z regulacją, liczniki ciepła. 10.Zespół Szkół w Paszynie - docieplenie przegród zewn.(ściany, stropy), wymiana drzwi, wymiana inst. c.o., Wymiana źródła ciepła – gaz, licznik ciepła Ciąg dalszy w punkcie Q wniosku o dofinansowanie (Polish)
0 references
The investment consists of the renovation of heating systems, the modernisation of heating systems, the use of RES (photovoltaic, solar collectors, biomass) in 11 public buildings. The optimal scope of work was determined on the basis of energy audits prepared in accordance with ‘Methodology...’: The scope of the audit work and the other necessary elements include the following tasks and activities (detailed in point C.2.3): 1.Preparatory costs: 1.1 energy audits; 1.2 financial and economic analysis; 1.3 functional-utility program 2.Thermomodernisation of the Gminny Centre for Social Assistance — insulation of partitions (walls, ceilings), installation of counter 3.kindergarten branch in Marcinkowicach — insulation of partitions (walls, ceiling); replacement of heat sources, photovoltaic system with meter 4.Primary school in Januszowa — insulation of partitioning partitions. (walls), replacement of windows, door, installation of the heat meter 5. (walls, ceilings), replacement of the heat source — biomass, heat counter, co.7.Primary school in Ridziałów — insulation of partitions (walls, ceiling), replacement of windows, doors, replacement of the heat source — biomass, heat counter, modernisation of c.o. of regulation 8. school assembly in Chomraice — insulation of partitions (walls, ceiling), source of heat and hot water — gas, heat and hot water meters, control of c.9. school assembly in Marcinkowicach — insulation of partitioning systems. (walls, ceiling), exchange of doors, exchange of regulated and heat meters, heat meters. 10.School assembly in Paszyn — insulation of bulkheads (walls, ceilings), replacement of doors, replacement of hot., replacement of the heat source — gas, Csurvival meter continuing at point Q of the grant application (English)
0 references
Identifiers
RPMP.04.03.02-12-0197/16