Energy efficiency related to the thermal modernisation of the primary school building in Kuunio municipality (Q109025): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project aims at improving the energy efficiency of the Primary School in Kuunio municipality. Thermal modernisation will help to improve the efficiency of the generation, transmission and accumulation of heat. The complexity of the project will include: — insulation of the plant, which consists of the thermal modernisation of the building envelope, including external walls and ceilings, — reconstruction of heating systems with installation o...)
Property / summary
 
The project aims at improving the energy efficiency of the Primary School in Kuunio municipality. Thermal modernisation will help to improve the efficiency of the generation, transmission and accumulation of heat. The complexity of the project will include: — insulation of the plant, which consists of the thermal modernisation of the building envelope, including external walls and ceilings, — reconstruction of heating systems with installation of a new heat source, insulation of the floor space, replacement of windows and external doors, — replacement of lighting on energy efficient, — installation of renewable energy sources associated with the earth’s heat pump as a source of thermal energy in the building, installation of sub-vertical valves and thermostats, — storm-water system. The important installation of ground heat pumps as a renewable source of energy will contribute to the reduction of gas emissions. In addition, this entails a reduction in the fees for water heating. This also results in a reduction in demand for energy resources that would reduce the cost of maintenance. (English)
Property / summary: The project aims at improving the energy efficiency of the Primary School in Kuunio municipality. Thermal modernisation will help to improve the efficiency of the generation, transmission and accumulation of heat. The complexity of the project will include: — insulation of the plant, which consists of the thermal modernisation of the building envelope, including external walls and ceilings, — reconstruction of heating systems with installation of a new heat source, insulation of the floor space, replacement of windows and external doors, — replacement of lighting on energy efficient, — installation of renewable energy sources associated with the earth’s heat pump as a source of thermal energy in the building, installation of sub-vertical valves and thermostats, — storm-water system. The important installation of ground heat pumps as a renewable source of energy will contribute to the reduction of gas emissions. In addition, this entails a reduction in the fees for water heating. This also results in a reduction in demand for energy resources that would reduce the cost of maintenance. (English) / rank
 
Normal rank

Revision as of 11:21, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy efficiency related to the thermal modernisation of the primary school building in Kuunio municipality
Project in Poland financed by DG Regio

    Statements

    0 references
    839,600.0 zloty
    0 references
    201,504.0 Euro
    13 January 2020
    0 references
    1,060,570.0 zloty
    0 references
    254,536.8 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    4 January 2016
    0 references
    31 January 2018
    0 references
    GMINA GOWOROWO
    0 references

    52°54'2.5"N, 21°33'25.2"E
    0 references
    Projekt służy poprawie efektywności energetycznej Szkoły Podstawowej w Kuninie w gminie Goworowo. Zabieg termomodernizacji będzie polegał na ulepszeniu sprawności wytwarzania, przesyłu i akumulacji energii cieplnej. Kompleksowość projektu obejmować będzie: - ocieplenie obiektu polegające na termomodernizacji przegród zewnętrznych obiektu, w tym ścian zewnętrznych i stropodachów, - przebudowę systemów grzewczych wraz z instalacją nowego źródła ciepła, - ocieplenie podłóg, - wymianę okien i drzwi zewnętrznych, - wymianę oświetlenia na energooszczędne, - instalację odnawialnego źródła energii związaną z realizacją pompy ciepła z ziemi jako źródłem energii cieplnej w budynku, - instalację zaworów podpionowych i termostatów, - instalację kanalizacji deszczowej. Co ważne instalacja gruntowych pomp ciepła, jako odnawialnego źródła energii, przyczyni się do spadku emisji gazów. Ponadto wiąże się to ze zmniejszeniem opłat za ogrzewanie wody. Skutkuje to także zmniejszeniem zapotrzebowania na surowce energetyczne, które świadczyłyby o obniżeniu kosztów utrzymania obiektów. (Polish)
    0 references
    The project aims at improving the energy efficiency of the Primary School in Kuunio municipality. Thermal modernisation will help to improve the efficiency of the generation, transmission and accumulation of heat. The complexity of the project will include: — insulation of the plant, which consists of the thermal modernisation of the building envelope, including external walls and ceilings, — reconstruction of heating systems with installation of a new heat source, insulation of the floor space, replacement of windows and external doors, — replacement of lighting on energy efficient, — installation of renewable energy sources associated with the earth’s heat pump as a source of thermal energy in the building, installation of sub-vertical valves and thermostats, — storm-water system. The important installation of ground heat pumps as a renewable source of energy will contribute to the reduction of gas emissions. In addition, this entails a reduction in the fees for water heating. This also results in a reduction in demand for energy resources that would reduce the cost of maintenance. (English)
    0 references

    Identifiers

    RPMA.04.02.00-14-5353/16
    0 references