Thermal modernisation and improvement of the energy efficiency of two blocks of building cooperative “Skarpa” (Q105498): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The main objective of the project is to improve the quality of the environment by thermo-modernisation of the residential buildings located at ul. Fesseldice 108A and 108B at Faisława. The project will help to reduce the need for thermal energy in buildings. In addition, a comprehensive thermal modernisation process will reduce air pollution and improve cleaner air pollution. This will be done by reducing CO2 emissions and other greenhouse gases...) |
||
Property / summary | |||
The main objective of the project is to improve the quality of the environment by thermo-modernisation of the residential buildings located at ul. Fesseldice 108A and 108B at Faisława. The project will help to reduce the need for thermal energy in buildings. In addition, a comprehensive thermal modernisation process will reduce air pollution and improve cleaner air pollution. This will be done by reducing CO2 emissions and other greenhouse gases and dusts into the atmosphere. As a consequence, the investment will improve the standard of living of the inhabitants of the buildings covered by the project (reduction of operating costs) as well as of the inhabitants of the municipality (improvement of the quality of the environment). The project involves improving the energy efficiency of residential buildings at ul. Facts 108A and 108B by, inter alia: 1. Construction work — eligible: 1.1. Demolition works including works that allow the installation of window and door frames and the insulation of roof and hatch windows. 1.2. Works including the insulation of the basement of the basement of the basement. It includes both the preparation of the ground and the insulation of the division. 1.3. Work involving the replacement of windows and Assembly of pressure ants. 1.4. Work involving the exchange of doors with replacement works. 1.5. The supply and assembly of thermal heads, thermosets and a heat meter. 1.6. Work including the insulation of the building envelope. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.7. Work including the insulation of the hatch barrier. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.8. Work including window openings with trim. The project addresses energy poverty and fulfils the ex-ante conditions of Directive 2006/32/EC. (English) | |||
Property / summary: The main objective of the project is to improve the quality of the environment by thermo-modernisation of the residential buildings located at ul. Fesseldice 108A and 108B at Faisława. The project will help to reduce the need for thermal energy in buildings. In addition, a comprehensive thermal modernisation process will reduce air pollution and improve cleaner air pollution. This will be done by reducing CO2 emissions and other greenhouse gases and dusts into the atmosphere. As a consequence, the investment will improve the standard of living of the inhabitants of the buildings covered by the project (reduction of operating costs) as well as of the inhabitants of the municipality (improvement of the quality of the environment). The project involves improving the energy efficiency of residential buildings at ul. Facts 108A and 108B by, inter alia: 1. Construction work — eligible: 1.1. Demolition works including works that allow the installation of window and door frames and the insulation of roof and hatch windows. 1.2. Works including the insulation of the basement of the basement of the basement. It includes both the preparation of the ground and the insulation of the division. 1.3. Work involving the replacement of windows and Assembly of pressure ants. 1.4. Work involving the exchange of doors with replacement works. 1.5. The supply and assembly of thermal heads, thermosets and a heat meter. 1.6. Work including the insulation of the building envelope. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.7. Work including the insulation of the hatch barrier. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.8. Work including window openings with trim. The project addresses energy poverty and fulfils the ex-ante conditions of Directive 2006/32/EC. (English) / rank | |||
Normal rank |
Revision as of 09:28, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation and improvement of the energy efficiency of two blocks of building cooperative “Skarpa” |
Project in Poland financed by DG Regio |
Statements
1,542,602.55 zloty
0 references
3,141,264.41 zloty
0 references
66.49 percent
0 references
22 January 2019
0 references
30 November 2021
0 references
SPÓŁDZIELNIA BUDOWLANO-MIESZKANIOWA "SKARPA"
0 references
Celem głównym projektu jest poprawa jakości środowiska naturalnego poprzez termomodernizację budynków mieszkalnych zlokalizowanych przy ul. Fajsławice 108A i 108B w Fajsławicach. Realizacja projektu posłuży zmniejszeniu zapotrzebowania na energię cieplną w budynkach. Ponadto przeprowadzenie procesu kompleksowej termomodernizacji przyczyni się do redukcji zanieczyszczenia powietrza atmosferycznego i poprawy jego czystości. Stanie się to dzięki zmniejszeniu emisji CO2 i innych gazów cieplarnianych oraz pyłów do atmosfery. W konsekwencji inwestycja poprawi komfort życia mieszkańców budynków objętych projektem (zmniejszenie kosztów eksploatacji) jak również mieszkańców gminy (poprawa jakości środowiska naturalnego). Projekt obejmuje poprawę efektywności energetycznej budynków mieszkalnych przy ul. Fajsławice 108A i 108B poprzez m.in.: 1. Prace związane z branżą budowlaną- kwalifikowalne: 1.1. Roboty rozbiórkowe obejmujące prace umożliwiające montaż stolarki okiennej i drzwiowej oraz docieplenie przegród dachu czy lukarn. 1.2. Prace obejmujące docieplenie przegrody stropu piwnic. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody. 1.3. Prace obejmujące wymianę okien oraz montaż nawiewników ciśnieniowych. 1.4. Prace obejmujące wymianę drzwi wraz z pracami odtworzeniowymi. 1.5. Dostarczenie i montaż głowic termostatycznych, termozaworów cyrkulacji i licznika ciepła. 1.6. Prace obejmujące docieplenie przegrody cokołu. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody wraz z wykończeniem. 1.7. Prace obejmujące docieplenie przegrody lukarn. Obejmuje zarówno przygotowanie podłoża jak również wykonanie docieplenia przegrody wraz z wykończeniem. 1.8. Prace obejmujące zamurowanie otworów okiennych wraz z wykończeniem. Projekt w przeciwdziała ubóstwu energetycznemu oraz spełnia warunki ex-ante z dyrektywy 2006/32/EC. (Polish)
0 references
The main objective of the project is to improve the quality of the environment by thermo-modernisation of the residential buildings located at ul. Fesseldice 108A and 108B at Faisława. The project will help to reduce the need for thermal energy in buildings. In addition, a comprehensive thermal modernisation process will reduce air pollution and improve cleaner air pollution. This will be done by reducing CO2 emissions and other greenhouse gases and dusts into the atmosphere. As a consequence, the investment will improve the standard of living of the inhabitants of the buildings covered by the project (reduction of operating costs) as well as of the inhabitants of the municipality (improvement of the quality of the environment). The project involves improving the energy efficiency of residential buildings at ul. Facts 108A and 108B by, inter alia: 1. Construction work — eligible: 1.1. Demolition works including works that allow the installation of window and door frames and the insulation of roof and hatch windows. 1.2. Works including the insulation of the basement of the basement of the basement. It includes both the preparation of the ground and the insulation of the division. 1.3. Work involving the replacement of windows and Assembly of pressure ants. 1.4. Work involving the exchange of doors with replacement works. 1.5. The supply and assembly of thermal heads, thermosets and a heat meter. 1.6. Work including the insulation of the building envelope. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.7. Work including the insulation of the hatch barrier. It includes both the preparation of the ground and the execution of a heating barrier with trim. 1.8. Work including window openings with trim. The project addresses energy poverty and fulfils the ex-ante conditions of Directive 2006/32/EC. (English)
0 references
Identifiers
RPLU.05.03.00-06-0020/19
0 references