Construction of PV installations for OPK Opole Lubelskie (Q104832): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): 1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,00...) |
||
Property / summary | |||
1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,00 PLN net 3----- Basic 0.1244 MW electricity production 136.9 MWh. Avoided emissions of CO2 45.48 t annihilation 5 units producing electricity — an increase in employment by 1 people overseeing installations and monitoring energy consumption in a company. 4------------- Installations will be built in rural 0612055.5---------Technically, installation will consist of a specified number of panels in series of polycrystalline photovoltaic panels in series in the string and string and will be connected to the inverter, that is to say, an alternating current of the power processor with parameters that comply with the network parameters as defined by the Distribution Network Operator. The panel and inverters must have appropriate certificates of entry into service in Poland. In addition, each installation will be equipped with ICT technology to monitor the production of electricity and inverters and solar panels. Access to this data by implementing ICT will be possible via the website made available by the manufacturer of inverters or smartphone applications. 6------- Investment as construction of a mixed installation does not require either a building permit or notification or notification of the works as a result of the construction law (height of installations below 3 m) 7-----/----/EC, the applicant will promote the project and the knowledge of renewable energy sources by distributing the information leaflets to its customers. (English) | |||
Property / summary: 1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,00 PLN net 3----- Basic 0.1244 MW electricity production 136.9 MWh. Avoided emissions of CO2 45.48 t annihilation 5 units producing electricity — an increase in employment by 1 people overseeing installations and monitoring energy consumption in a company. 4------------- Installations will be built in rural 0612055.5---------Technically, installation will consist of a specified number of panels in series of polycrystalline photovoltaic panels in series in the string and string and will be connected to the inverter, that is to say, an alternating current of the power processor with parameters that comply with the network parameters as defined by the Distribution Network Operator. The panel and inverters must have appropriate certificates of entry into service in Poland. In addition, each installation will be equipped with ICT technology to monitor the production of electricity and inverters and solar panels. Access to this data by implementing ICT will be possible via the website made available by the manufacturer of inverters or smartphone applications. 6------- Investment as construction of a mixed installation does not require either a building permit or notification or notification of the works as a result of the construction law (height of installations below 3 m) 7-----/----/EC, the applicant will promote the project and the knowledge of renewable energy sources by distributing the information leaflets to its customers. (English) / rank | |||
Normal rank |
Revision as of 09:27, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of PV installations for OPK Opole Lubelskie |
Project in Poland financed by DG Regio |
Statements
222,525.0 zloty
0 references
608,235.0 zloty
0 references
45.0 percent
0 references
1 April 2018
0 references
31 December 2018
0 references
OPOLSKIE PRZEDSIĘBIORSTWO KOMUNALNE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
1---- celem projektu jest obniżenie kosztów energii elektrycznej poprzez produkcję energii elektrycznej na własne potrzeby. Cel zostanie zrealizowany przez budowę 5 mikro instalacji fotowoltaicznej jednej na terenie oczyszczalni ścieków i czterech na stacjach uzdatniania wody o łącznej mocy 0,1244 MW. 2.-------- Zdania -wybudowanie mikro instalacji fotowoltaicznych o mocy 0,1244 MW Koszty kwalifikowane 494 500,00 PLN netto. Dotacja 222 525,00 PLN netto 3----- Podstawowe wskaźniki moc 0,1244 MW Produkcja energii roczna 136,9 MWh. Uniknięta emisja CO2 45,48 t rocznie---wybudowanie 5 jednostek produkujących energię elektryczną- wzrost zatrudnienia o 1 osobę nadzorującą instalacje i monitorującą zużycie energii w firmie. 4--------- Instalacje zostaną wybudowane na terenie wiejskim 0612055 .5--------Technicznie instalacja będzie się składała z określonej liczby paneli fotowoltaicznych polikrystalicznych połączonych szeregowo w stringi i string zostanie podłączony do inwertera czyli urządzenia przetwarzającego prąd stały w prąd zmienny o parametrach zgodnych z parametrami sieci określonymi przez Operatora Sieci Dystrybucyjnej. Panel i inwerter muszą posiadać odpowiednie certyfikaty dopuszczające do pracy w Polsce. Dodatkowo każda instalacja zostanie wyposażona w technologię TIK, której zadaniem jest monitoring produkcji energii elektrycznej oraz parametrów inwertera a także paneli fotowoltaicznych. Dostęp do tych danych poprzez zaimplementowana technologię TIK będzie możliwy przez stronę internetową udostępnioną przez producenta inwertera lub przez aplikacje na Smartfonie. 6------- Inwestycja jako budowa miro instalacji nie wymaga pozwolenia na budowę ani zgłoszenie ani zgłoszenia robót co wynika wprost z Prawa Budowlanego (wysokość instalacji poniżej 3m) 7--------Po zakończeniu projektu wnioskodawca będzie promował projekt oraz wiedzę na temat odnawialnych żródeł energii poprzez dystrybucję ulotek informacyjnych wśród swoich klientów. (Polish)
0 references
1---- the aim of the project is to reduce the cost of electricity by producing electricity for own use. The target will be achieved by the construction of 5 micro photovoltaic installations within the waste water treatment plant and four at the water treatment plants with a total capacity of 0.1244 MW. 2.------------ Wash — Construction of micro-installations with a capacity of 0.1244 MW (PLN 494 500,00 net eligible costs). Net grant 222 525,00 PLN net 3----- Basic 0.1244 MW electricity production 136.9 MWh. Avoided emissions of CO2 45.48 t annihilation 5 units producing electricity — an increase in employment by 1 people overseeing installations and monitoring energy consumption in a company. 4------------- Installations will be built in rural 0612055.5---------Technically, installation will consist of a specified number of panels in series of polycrystalline photovoltaic panels in series in the string and string and will be connected to the inverter, that is to say, an alternating current of the power processor with parameters that comply with the network parameters as defined by the Distribution Network Operator. The panel and inverters must have appropriate certificates of entry into service in Poland. In addition, each installation will be equipped with ICT technology to monitor the production of electricity and inverters and solar panels. Access to this data by implementing ICT will be possible via the website made available by the manufacturer of inverters or smartphone applications. 6------- Investment as construction of a mixed installation does not require either a building permit or notification or notification of the works as a result of the construction law (height of installations below 3 m) 7-----/----/EC, the applicant will promote the project and the knowledge of renewable energy sources by distributing the information leaflets to its customers. (English)
0 references
Identifiers
RPLU.04.02.00-06-0004/17
0 references