By nature — photovoltaic in the municipality of Competent (Q104655): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): The project (P) will be located in. The scope of P. requires the installation of 134 units of a 0,43-MW inversion). Project. Steel. 3 KW for 20, 3 TA for roof tops — 111k; 5 kW posadwrapped in -3ht. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GW use. Objective.) with implementation effects. Ms P. will be around 500 in 134...)
Property / summary
 
The project (P) will be located in. The scope of P. requires the installation of 134 units of a 0,43-MW inversion). Project. Steel. 3 KW for 20, 3 TA for roof tops — 111k; 5 kW posadwrapped in -3ht. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GW use. Objective.) with implementation effects. Ms P. will be around 500 in 134 site. Instal., which is owned throughout its life (5s). GW, which is situated on the building. HEADS. The objective of P. is wider. RES in GW. Specific objectives: OBJECTIVE 1: Techn. [0.42 MW in 2018]; OBJECTIVE 2: Minority of charges [374,48 MWHT/year since 2019]; OBJECTIVE 3: The reduction of pollution. [311.38 t. CO2/rok since 2019]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. The RPO WL, i.e. the sub-region and the region on the basis of a major potentiation, and in favour of a greater degree of social cohesion and a terytor. P., together with the social and economic roots, will be influential on the fight against climate change. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Social business in conjunction with one another. [Uruguayan. WWW, in the stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. GW. On the subst. PROGR. OCHR. Air DLA STREFY LUBEL. in GW no claim. Approval/target position for air quality assessment. (English)
Property / summary: The project (P) will be located in. The scope of P. requires the installation of 134 units of a 0,43-MW inversion). Project. Steel. 3 KW for 20, 3 TA for roof tops — 111k; 5 kW posadwrapped in -3ht. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GW use. Objective.) with implementation effects. Ms P. will be around 500 in 134 site. Instal., which is owned throughout its life (5s). GW, which is situated on the building. HEADS. The objective of P. is wider. RES in GW. Specific objectives: OBJECTIVE 1: Techn. [0.42 MW in 2018]; OBJECTIVE 2: Minority of charges [374,48 MWHT/year since 2019]; OBJECTIVE 3: The reduction of pollution. [311.38 t. CO2/rok since 2019]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. The RPO WL, i.e. the sub-region and the region on the basis of a major potentiation, and in favour of a greater degree of social cohesion and a terytor. P., together with the social and economic roots, will be influential on the fight against climate change. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Social business in conjunction with one another. [Uruguayan. WWW, in the stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. GW. On the subst. PROGR. OCHR. Air DLA STREFY LUBEL. in GW no claim. Approval/target position for air quality assessment. (English) / rank
 
Normal rank

Revision as of 09:24, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
By nature — photovoltaic in the municipality of Competent
Project in Poland financed by DG Regio

    Statements

    0 references
    1,399,085.87 zloty
    0 references
    335,780.6088 Euro
    13 January 2020
    0 references
    2,159,552.64 zloty
    0 references
    518,292.6336 Euro
    13 January 2020
    0 references
    73.86 percent
    0 references
    27 April 2016
    0 references
    30 June 2020
    0 references
    GMINA WŁODAWA
    0 references
    Projekt (P.) zlokaliz. będzie na ter. woj. lubel., w pow. włodawskim., w gm. Włodawa(GW).Teren P. obejmuje 13 miejsc. w GW. Zakres P. zakłada instalację 134 szt. zestaw. inst. fotowolt. w obiekt. prywat. o sum. mocy 0,43 MW. Zaprojekt. Instal. 3 KW posadowione na gruncie 20 szt., 3KW posadowiane na połaci dachowej - 111szt.; 5KW posadowione na gruncie -3szt. P. przewid. również zaprojekt. i wykon. portalu internet., który będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna liczba mieszk. GW korzyst. (GR. DOCEL.) z efektów realiz. P. wyniesie ok. 500 w 134 obiekt. Instal., będące przez cały okres trwałości (5lat) własn. GW, zost. usytuow. na budyn. stanow. własn. os. prywat., z którymi GW. podpisała um. użycz. GŁÓW. CELEM P. jest zwiększ. stosow. OZE na terenie GW. Cele szczegół.: CEL 1: Upowszechn. techn. [ ] [0,42MW w 2018r.].; CEL 2: Zmniejsz. obciążeń [ ] [374,48 Mwht/rok od 2019r.]; CEL 3: Reduk. zanieczyszcz. [ ][311,38 t. ekwiwal. CO2 / rok od 2019r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL, tj. podn. konkuren. regionu w oparciu o wewn. potencj., sprzyjaj. zwiększ. spójn. społ. i terytor. P., obok korz. społ. i gosp. będzie wpływ. na skuteczn. przeciwdzi. zmian. klimatu. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. infor. [uruch. Serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GW. Na podst. PROGR. OCHR. POWIETRZA DLA STREFY LUBEL. w GW nie stwierdz. przekrocz. Poz. dopuszcz. lub docel. w odnieś. do subst. podlegaj. ocenie jakości powietrza. (Polish)
    0 references
    The project (P) will be located in. The scope of P. requires the installation of 134 units of a 0,43-MW inversion). Project. Steel. 3 KW for 20, 3 TA for roof tops — 111k; 5 kW posadwrapped in -3ht. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GW use. Objective.) with implementation effects. Ms P. will be around 500 in 134 site. Instal., which is owned throughout its life (5s). GW, which is situated on the building. HEADS. The objective of P. is wider. RES in GW. Specific objectives: OBJECTIVE 1: Techn. [0.42 MW in 2018]; OBJECTIVE 2: Minority of charges [374,48 MWHT/year since 2019]; OBJECTIVE 3: The reduction of pollution. [311.38 t. CO2/rok since 2019]. It is part of both the priorite objective. 4 (installation of energy from RES) as well as the head. The RPO WL, i.e. the sub-region and the region on the basis of a major potentiation, and in favour of a greater degree of social cohesion and a terytor. P., together with the social and economic roots, will be influential on the fight against climate change. They are part of the operational objectives. (2.5- equip. You cut. Consumer Infrastructure, Switch-over, Energy.; 3.6 — Social business in conjunction with one another. [Uruguayan. WWW, in the stand. WCAG 2.0]; 4.5 — Racijon. and a resource efficient. for business and recreation, and with respect to conservation and security purposes, see SRWL 2014-2020. GW. On the subst. PROGR. OCHR. Air DLA STREFY LUBEL. in GW no claim. Approval/target position for air quality assessment. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0030/16
    0 references