Renewables for Terespol — phase II (Q104737): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will be...)
Property / summary
 
Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will be located on private residential buildings (roofs and façades). They shall not exceed 3 m above the roof surface. The project uses web portals to implement clean energy services and products. A project website will be created which will include the following elements: project description, installation instructions, RES information and usable technologies, electronic communication forms for the user. It also implements an intelligent energy management system based on ICT that addresses the measurement, operation and monitoring of the installed equipment (on-line connection). The project will be useful for all project stakeholders. The city of Terespol will own a new RES infrastructure which will improve the quality of the municipal services provided. The operation of an installation will lead to a reduction in maintenance costs as well as a saving of time by minimising the operation. By reducing the ‘low’ emissions of domestic furnaces, including in particular particulate matter PM10, which has been found in the Lubelskie zone in excess of the standard 24-hour limits, the project contributes to the objectives of the ‘air quality programme for the Lublin area’ (classified as Area C and thus obliged to draw up a programme). (English)
Property / summary: Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will be located on private residential buildings (roofs and façades). They shall not exceed 3 m above the roof surface. The project uses web portals to implement clean energy services and products. A project website will be created which will include the following elements: project description, installation instructions, RES information and usable technologies, electronic communication forms for the user. It also implements an intelligent energy management system based on ICT that addresses the measurement, operation and monitoring of the installed equipment (on-line connection). The project will be useful for all project stakeholders. The city of Terespol will own a new RES infrastructure which will improve the quality of the municipal services provided. The operation of an installation will lead to a reduction in maintenance costs as well as a saving of time by minimising the operation. By reducing the ‘low’ emissions of domestic furnaces, including in particular particulate matter PM10, which has been found in the Lubelskie zone in excess of the standard 24-hour limits, the project contributes to the objectives of the ‘air quality programme for the Lublin area’ (classified as Area C and thus obliged to draw up a programme). (English) / rank
 
Normal rank

Revision as of 09:22, 9 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renewables for Terespol — phase II
Project in Poland financed by DG Regio

    Statements

    0 references
    2,859,224.19 zloty
    0 references
    686,213.8056 Euro
    13 January 2020
    0 references
    3,754,757.81 zloty
    0 references
    901,141.8744 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 March 2016
    0 references
    29 November 2019
    0 references
    GMINA MIASTO TERESPOL
    0 references
    W ramach projektu zrealizowanych zostanie 278 instalacji OZE (wskaźniki produktów projektu), w tym: 149 instalacji kolektorów słonecznych o łącznej mocy: 0,646 MW, 11 powietrznych pomp ciepła o łącznej mocy 0,038 MW, 69 pieców na biomasę o łącznej mocy 1,275 MW i 49 otwartych instalacji fotowoltaicznych o łącznej mocy 0,116 MW. Łączna moc zainstalowana urządzeń wyniesie: 2,075 MW. Wszystkie instalacje zlokalizowane będą na prywatnych budynkach mieszkalnych (dachy i elewacje). Ich wysokość nie przekroczy 3 m powyżej powierzchnię dachu. Projekt wykorzystuje portale internetowe w celu wdrożenia usług i produktów czystej energii. Utworzona zostanie strona internetowa projektu, która będzie zawierać następujące m.in. elementy: opis projektu, instrukcje obsługi instalacji, informacje o OZE oraz możliwych do zastosowania technologiach, formularze do komunikacji elektronicznej użytkownik - wnioskodawca. Wdraża również inteligentny system zarządzania energią w oparciu o technologie TIK, które dotyczą pomiaru, obsługi i monitoringu zainstalowanych urządzeń (połączenie on-line). Przedsięwzięcie będzie użyteczne dla wszystkich interesariuszy projektu. Miasto Terespol będzie właścicielem nowej infrastruktury OZE, która wpłynie na poprawę jakości świadczonych usług komunalnych. Użytkowanie instalacji wpłynie na obniżenie kosztów utrzymania, a także oszczędność czasu poprzez zminimalizowanie czynności obsługi. Poprzez ograniczenie emisji "niskiej" z palenisk domowych, w tym w szczególności pyłu zawieszonego PM10, którego ponadnormatywne stężenia 24-godzinne stwierdzono w strefie lubelskiej, projekt przyczynia się do realizacji założeń "Programu ochrony powietrza dla strefy lubelskiej" (została zakwalifikowana jako strefa C, a tym samym zobligowana do opracowania Programu). (Polish)
    0 references
    Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will be located on private residential buildings (roofs and façades). They shall not exceed 3 m above the roof surface. The project uses web portals to implement clean energy services and products. A project website will be created which will include the following elements: project description, installation instructions, RES information and usable technologies, electronic communication forms for the user. It also implements an intelligent energy management system based on ICT that addresses the measurement, operation and monitoring of the installed equipment (on-line connection). The project will be useful for all project stakeholders. The city of Terespol will own a new RES infrastructure which will improve the quality of the municipal services provided. The operation of an installation will lead to a reduction in maintenance costs as well as a saving of time by minimising the operation. By reducing the ‘low’ emissions of domestic furnaces, including in particular particulate matter PM10, which has been found in the Lubelskie zone in excess of the standard 24-hour limits, the project contributes to the objectives of the ‘air quality programme for the Lublin area’ (classified as Area C and thus obliged to draw up a programme). (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0139/16
    0 references