Solar collectors assembly in the municipality of Kurów (Q104695): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) wit...) |
||
Property / summary | |||
Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) with the results of the implementation of P. will amount to 1400 in 471 sites. The plant, which is owned by the GK over its lifetime (5 years), will be located on buildings owned by people at the stage of privatisation with which GK has signed loan agreements. The main CELEM is to increase the use of RES in the area of GK. Specific objectives: OBJECTIVE 1: The generalisation of the production of clean energy to the residential sector through the universal assembly of RES in the municipality [471 with a total capacity of 1.50 MW in 2019, production of 901,41MWht in 2019]; OBJECTIVE 2: Reduction of emissions of ambient air by reducing the emission of harmful compounds by increasing the share of energy from renewable sources [307.40 t CO2/rok since 2020].Objective 3: Minority of the financial burden of local communities resulting from the energy levy due to the creation of individual RES installations [471 installations since 2019]. The area of the Kurów area is covered by the ‘Air Protection Programme for the Lublin area’. According to it, no exceedances were identified in the area of the Kurów chamber. (English) | |||
Property / summary: Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) with the results of the implementation of P. will amount to 1400 in 471 sites. The plant, which is owned by the GK over its lifetime (5 years), will be located on buildings owned by people at the stage of privatisation with which GK has signed loan agreements. The main CELEM is to increase the use of RES in the area of GK. Specific objectives: OBJECTIVE 1: The generalisation of the production of clean energy to the residential sector through the universal assembly of RES in the municipality [471 with a total capacity of 1.50 MW in 2019, production of 901,41MWht in 2019]; OBJECTIVE 2: Reduction of emissions of ambient air by reducing the emission of harmful compounds by increasing the share of energy from renewable sources [307.40 t CO2/rok since 2020].Objective 3: Minority of the financial burden of local communities resulting from the energy levy due to the creation of individual RES installations [471 installations since 2019]. The area of the Kurów area is covered by the ‘Air Protection Programme for the Lublin area’. According to it, no exceedances were identified in the area of the Kurów chamber. (English) / rank | |||
Normal rank |
Revision as of 09:22, 9 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Solar collectors assembly in the municipality of Kurów |
Project in Poland financed by DG Regio |
Statements
3,779,482.5 zloty
0 references
4,616,924.35 zloty
0 references
1,108,061.8439999998 Euro
0.24 Euro
13 January 2020
0 references
85.0 percent
0 references
1 March 2016
0 references
31 July 2019
0 references
GMINA KURÓW
0 references
Projekt (P.) zlokalizowany na ter. woj. lubelskiego, w pow. puławskim, w gm. Kurów (GK).Teren P. obejmuje 18 miejscowości w GK. Zakres P. zakłada instalację 471 szt. zestawów kolektorów słonecznych w obiektach prywatnych do przygotowania C.W.U. o łącznej mocy 1,50MW. P. przewiduje również zaprojektowanie i wykonanie portalu internetowego, który będzie pełnił funkcje edukacyjne, promocyjne oraz oferował usługi on-line. Łączna liczba mieszkańców GK korzystających (GRUPA DOCELOWA) z efektów realizacji P. wyniesie ok.1400 w 471 obiektach. Instalacje, będące przez cały okres trwałości (5lat) własnością GK, będą usytuowane na budynkach stanowiących własność osób prywat., z którymi GK. podpisała umowy użyczenia. GŁÓWNYM CELEM P. jest zwiększenie stosowania OZE na terenie GK. Cele szczegół.: CEL 1: Upowszechnienie technologii wytwarzania czystej energii wśród mieszk. poprzez powszechny montaż OZE na terenie gminy [471 szt. o łącznej mocy 1,50MW w 2019r.,produkcja 901,41MWht w 2019r.].; CEL 2: Redukcja zanieczyszczeń powietrza atmosferycznego poprzez zmniejsz. emisji związków szkodliwych dzięki zwiększ. udziału energii ze źródeł odnawialnych [307,40 t. ekwiwalentu CO2 / rok od 2020r.].CEL 3: Zmniejsz. obciążeń finansowych społeczności lokalnej wynikających z opłat za energię dzięki utworzeniu indywidualnych instalacji wykorzystujących OZE [471 instalacji od 2019r.]. Teren gm. Kurów objęty jest "Programem ochrony powietrza dla strefy lubelskiej". Zgodnie z nim na terenie gm. Kurów nie stwierdzono przekroczeń. (Polish)
0 references
Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) with the results of the implementation of P. will amount to 1400 in 471 sites. The plant, which is owned by the GK over its lifetime (5 years), will be located on buildings owned by people at the stage of privatisation with which GK has signed loan agreements. The main CELEM is to increase the use of RES in the area of GK. Specific objectives: OBJECTIVE 1: The generalisation of the production of clean energy to the residential sector through the universal assembly of RES in the municipality [471 with a total capacity of 1.50 MW in 2019, production of 901,41MWht in 2019]; OBJECTIVE 2: Reduction of emissions of ambient air by reducing the emission of harmful compounds by increasing the share of energy from renewable sources [307.40 t CO2/rok since 2020].Objective 3: Minority of the financial burden of local communities resulting from the energy levy due to the creation of individual RES installations [471 installations since 2019]. The area of the Kurów area is covered by the ‘Air Protection Programme for the Lublin area’. According to it, no exceedances were identified in the area of the Kurów chamber. (English)
0 references
Identifiers
RPLU.04.01.00-06-0082/16
0 references