Madiana Energy Modernisation (Q3686658): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): The energy consumption of the Madiana Congress Centre is important. It represents an average of 4.5GWh/year coming almost exclusively from the EDF electricity grid. This consumption based mainly on imported fossil fuels (heavy fuel and domestic fuel oil) has a large environmental impact which can be quantified 3,500 tonnes of C02/year (source ADEME Martinique). Given the constant increase in energy bills, the management has decided to take a dee...)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Madiana Energy Modernisation

Revision as of 18:09, 18 November 2021

Project Q3686658 in France
Language Label Description Also known as
English
Madiana Energy Modernisation
Project Q3686658 in France

    Statements

    0 references
    673,764.62 Euro
    0 references
    1,392,400.27 Euro
    0 references
    48.39 percent
    0 references
    7 April 2016
    0 references
    2 March 2019
    0 references
    MADIANA CONGRES SAS
    0 references

    14°37'12.97"N, 61°5'36.24"W
    0 references
    97233
    0 references
    La consommation énergétique du Palais des Congrès de Madiana est importante. Elle représente en moyenne 4,5GWh/an provenant presque exclusivement du réseau électrique EDF. Cette consommation basée essentiellement sur les énergies fossiles importées (fioul lourd et fioul domestique), a un gros impact environnemental qui peut être quantifié 3 500 tonnes de C02/an (source ADEME Martinique). Face au constant renchérissement des factures énergétiques, la direction a décidé d’engager une démarche profonde et durable de maîtrise des coûts et des consommations d’énergie. Madiana Modernisation énergétique est la première étape de ce projet d'ensemble. Il concerne la modernisation du système de climatisation qui représente 70% de la consommation du site. Les actions prioritaires à mettre en œuvre sur la période d'exécution du projet (2017-2018) : - Améliorer la capacité et l'efficacité du système de production de froid - Améliorer l'efficacité du système de distribution de froid - Mettre en place des actions de Maîtrise de l'énergie - Mettre en place un système de management de l'énergie afin de pérenniser la démarche de transition énergétique. (French)
    0 references
    The energy consumption of the Madiana Congress Centre is important. It represents an average of 4.5GWh/year coming almost exclusively from the EDF electricity grid. This consumption based mainly on imported fossil fuels (heavy fuel and domestic fuel oil) has a large environmental impact which can be quantified 3,500 tonnes of C02/year (source ADEME Martinique). Given the constant increase in energy bills, the management has decided to take a deep and sustainable approach to controlling energy costs and consumption. Madiana Energy Modernisation is the first step in this overall project. It concerns the modernisation of the air conditioning system, which accounts for 70 % of the site’s consumption. The priority actions to be implemented over the implementation period of the project (2017-2018): — Improve the capacity and efficiency of the cooling system — Improving the efficiency of the cold distribution system — Implement energy management actions — Establish an energy management system to sustain the energy transition process. (English)
    18 November 2021
    0 references

    Identifiers

    MQ0012072
    0 references