Comfort of the Johnston dam in the West Pres of La Teste de Buch (Q3668873): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in sta...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Comfort of the Johnston dam in the West Pres of La Teste de Buch |
Revision as of 10:29, 18 November 2021
Project Q3668873 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Comfort of the Johnston dam in the West Pres of La Teste de Buch |
Project Q3668873 in France |
Statements
329,331.00 Euro
0 references
778,325.0 Euro
0 references
42.31 percent
0 references
12 November 2015
0 references
2 September 2017
0 references
COMMUNE DE LA TESTE DE BUCH
0 references
Dans le cadre de sa politique de gestion des risques d'inondation par submersion marine, la Ville a choisi de prioriser son intervention sur la digue Jonsthon. Objectif 1 : réduire de la vulnérabilité des populations en réduisant le risque de submersion marine.Objectif 2 : préserver l'espace naturel sensible des Prés Salés Ouest.Objectif 3 : garantir le maintien du cheminement piéton, en tête de digue.Pour y répondre, la digue sera confortée par une butée de pied en palplanches côté bassin d'Arcachon et un talus en enrochements liaisonnés. En tête d'ouvrage sera reconstitué un cheminement piéton. Le talus coté Prés Salés Ouest sera recouvert d'une géo grille tridimensionnelle lui permettant de résister à la surverse. (French)
0 references
As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in stalks side of Arcachon basin and a co-linked rock slope. At the head of the building, a pedestrian path will be reconstituted. The West Pres Salés side slope will be covered with a three-dimensional geo-grid allowing it to withstand the overflow. (English)
18 November 2021
0 references
Rue Edmond Doré, 33260 La Teste-de-Buch, France
0 references
Identifiers
3290810
0 references