Construction of a system for the separate collection of waste in the municipality of Cybinka. (Q100386): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): The project is designed to construct a selective municipal waste collection point (PSZOK) as part of a municipal waste management system, which includes in particular: the investment in container facilities, along with the remaining routes, squares and roads, external facilities, the construction of a parking ramp and a garage, the construction of a fence, the creation of a hazardous waste warehouse, the purchase and installation of an overrun,...) |
||
Property / summary | |||
The project is designed to construct a selective municipal waste collection point (PSZOK) as part of a municipal waste management system, which includes in particular: the investment in container facilities, along with the remaining routes, squares and roads, external facilities, the construction of a parking ramp and a garage, the construction of a fence, the creation of a hazardous waste warehouse, the purchase and installation of an overrun, the supply of machinery and equipment, the building of educational equipment and equipment and the educational path, and the removal of wild landfills and the support of a system of separate collection of waste. The target groups: Residents of Cybino Residents of the Municipality of Cybinka and Pow. Specific objective of the project: Waste reduction, including hazardous waste from the Gm.Cybinka, being landfilled. The following shall be used: To increase the level of separate collection and to manage the improvement of the quality and functionality of the existing system for the separate collection of waste in the Gm. Cybinka through the creation of PSZOK in Cybince Increase the knowledge of the residents of Gm. Cybinka on the separate collection of waste. Product indicators: Number of information and educational campaigns related to waste management — 1 Number of sorted municipal waste collection points supported — 1 Number of waste management facilities being built — 0 Number of waste management facilities built: 1 Result indicators: Additional waste recycling capacity (CI 17) — 0 (tonnes/year) Number of persons receiving waste collection selective — 6 611 persons Number of persons covered by the waste management scheme — 6 611 — Increase in employment in supported enterprises (CI 8) (FTE) — 1 Employment increase in supported enterprises — women (FTE) — 0 Employment increase in supported enterprises — men (FTE) — 1 (English) | |||
Property / summary: The project is designed to construct a selective municipal waste collection point (PSZOK) as part of a municipal waste management system, which includes in particular: the investment in container facilities, along with the remaining routes, squares and roads, external facilities, the construction of a parking ramp and a garage, the construction of a fence, the creation of a hazardous waste warehouse, the purchase and installation of an overrun, the supply of machinery and equipment, the building of educational equipment and equipment and the educational path, and the removal of wild landfills and the support of a system of separate collection of waste. The target groups: Residents of Cybino Residents of the Municipality of Cybinka and Pow. Specific objective of the project: Waste reduction, including hazardous waste from the Gm.Cybinka, being landfilled. The following shall be used: To increase the level of separate collection and to manage the improvement of the quality and functionality of the existing system for the separate collection of waste in the Gm. Cybinka through the creation of PSZOK in Cybince Increase the knowledge of the residents of Gm. Cybinka on the separate collection of waste. Product indicators: Number of information and educational campaigns related to waste management — 1 Number of sorted municipal waste collection points supported — 1 Number of waste management facilities being built — 0 Number of waste management facilities built: 1 Result indicators: Additional waste recycling capacity (CI 17) — 0 (tonnes/year) Number of persons receiving waste collection selective — 6 611 persons Number of persons covered by the waste management scheme — 6 611 — Increase in employment in supported enterprises (CI 8) (FTE) — 1 Employment increase in supported enterprises — women (FTE) — 0 Employment increase in supported enterprises — men (FTE) — 1 (English) / rank | |||
Normal rank |
Revision as of 10:01, 6 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a system for the separate collection of waste in the municipality of Cybinka. |
Project in Poland financed by DG Regio |
Statements
2,220,889.72 zloty
0 references
4,552,823.96 zloty
0 references
60.0 percent
0 references
3 January 2017
0 references
31 December 2021
0 references
ZAKŁAD USŁUG KOMUNALNYCH CYBINKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
W ramach projektu zaplanowano budowę Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) w ramach systemu gospodarowania odpadami komunalnymi, co obejmuje w szczególności: inwestycję w kontenerowe zaplecze wraz ze stróżówką, place i drogi, instalacje zewnętrzne, budowę rampy i wiaty garażowej, wykonanie ogrodzenia, stworzenie magazynu odpadów niebezpiecznych, zakup i montaż wagi najazdowej, dostawę maszyn i urządzeń, budowę wiaty edukacyjnej wraz z wyposażeniem oraz ścieżką edukacyjną, oraz likwidacja dzikich składowisk i wsparcie systemu selektywnej zbiórki odpadów kom. Grupy docelowe: Mieszkańcy Cybinki Mieszkańcy Gminy Cybinka i Pow. Słubickiego Instytucje Ochrony Środowiska Gł. cel projektu: Zmniejszenie poziomu odpadów kom., w tym odpadów niebezpiecznych z obszaru Gm.Cybinka, podlegających składowaniu. Cele szcz.: Zwiększenie poziomu selektywnego zbierania odpadów kom. i przekazania do zagospodarowania Poprawa jakości i funkcjonalności istniejącej infr. systemu selektywnej zbiórki odpadów na terenie Gm. Cybinka poprzez utworzenie PSZOK w Cybince Zwiększenie poziomu wiedzy mieszkańców Gm. Cybinka na temat selektywnej zbiórki odpadów kom. Wskaźniki produktu: Liczba kampanii informacyjno-edukacyjnych związanych z gospodarką odpadami – 1 szt. Liczba wspartych Punktów Selektywnego Zbierania Odpadów Komunalnych – 1 szt. Liczba przebudowanych zakładów zagospodarowania odpadów – 0 szt. Liczba wybudowanych zakładów zagospodarowania odpadów - 1 szt. Wskaźniki rezultatu: Dodatkowe możliwości przerobowe w zakresie recyklingu odpadów (CI 17) - 0 (tony/rok) Liczba osób objętych selektywnym zbieraniem odpadów – 6 611 os Liczba osób objętych systemem zagospodarowania odpadów – 6 611 os Wzrost zatrudnienia we wspieranych przedsiębiorstwach (CI 8) (EPC) – 1 Wzrost zatrudnienia we wspieranych przedsiębiorstwach – kobiety (EPC) – 0 Wzrost zatrudnienia we wspieranych przedsiębiorstwach – mężczyźni (EPC) – 1 (Polish)
0 references
The project is designed to construct a selective municipal waste collection point (PSZOK) as part of a municipal waste management system, which includes in particular: the investment in container facilities, along with the remaining routes, squares and roads, external facilities, the construction of a parking ramp and a garage, the construction of a fence, the creation of a hazardous waste warehouse, the purchase and installation of an overrun, the supply of machinery and equipment, the building of educational equipment and equipment and the educational path, and the removal of wild landfills and the support of a system of separate collection of waste. The target groups: Residents of Cybino Residents of the Municipality of Cybinka and Pow. Specific objective of the project: Waste reduction, including hazardous waste from the Gm.Cybinka, being landfilled. The following shall be used: To increase the level of separate collection and to manage the improvement of the quality and functionality of the existing system for the separate collection of waste in the Gm. Cybinka through the creation of PSZOK in Cybince Increase the knowledge of the residents of Gm. Cybinka on the separate collection of waste. Product indicators: Number of information and educational campaigns related to waste management — 1 Number of sorted municipal waste collection points supported — 1 Number of waste management facilities being built — 0 Number of waste management facilities built: 1 Result indicators: Additional waste recycling capacity (CI 17) — 0 (tonnes/year) Number of persons receiving waste collection selective — 6 611 persons Number of persons covered by the waste management scheme — 6 611 — Increase in employment in supported enterprises (CI 8) (FTE) — 1 Employment increase in supported enterprises — women (FTE) — 0 Employment increase in supported enterprises — men (FTE) — 1 (English)
0 references
Identifiers
RPLB.04.02.00-08-0004/18
0 references