INCREASING THE ATTRACTIVENESS OF THE TOURIST INFRASTRUCTURE OF THE CITY OF SKIERNIEWICE (Q102142): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): THE PROJECT WILL CONSIST OF THE DEVELOPMENT OF TOURIST INFRASTRUCTURE IN THE FORM OF A TOURIST AND RECREATIONAL ROUTE LOCATED AROUND THE LAGOON OF SKIERNIEWICE. THE PROJECT WILL CONSIST OF SEVERAL TASKS: 1. THE ROUTING OF THE ROUTE WILL LEAD TO THE MOST ATTRACTIVE POINTS OF THE CITY. IN THE COURSE OF THE JOURNEY, QUEST WILL BE PREPARED — TOURS COMBINED WITH QUITTING/RIDDLE, WITH DIFFERENT DEGREES OF DIFFICULTY. A CERTIFIED PIT SHALL BE MADE DURI...)
Property / summary
 
THE PROJECT WILL CONSIST OF THE DEVELOPMENT OF TOURIST INFRASTRUCTURE IN THE FORM OF A TOURIST AND RECREATIONAL ROUTE LOCATED AROUND THE LAGOON OF SKIERNIEWICE. THE PROJECT WILL CONSIST OF SEVERAL TASKS: 1. THE ROUTING OF THE ROUTE WILL LEAD TO THE MOST ATTRACTIVE POINTS OF THE CITY. IN THE COURSE OF THE JOURNEY, QUEST WILL BE PREPARED — TOURS COMBINED WITH QUITTING/RIDDLE, WITH DIFFERENT DEGREES OF DIFFICULTY. A CERTIFIED PIT SHALL BE MADE DURING THE COURSE OF THE JOURNEY. 2. THE CONSTRUCTION OF A PEDESTRIAN PATH AROUND THE EDGE OF THE CONTAINER WILL BE DESIGNED FOR A PEDESTRIAN/CYCLE PATH HAVING A ASPHALT SURFACE AND A WIDTH OF 4.0 M AND A DAY. OK. 4.5 KM. 3 CYCLES WILL BE BUILT ON TRACK. 3. THE UPGRADING OF THE EXISTING BEACH HAS BEEN DESIGNED TO SET THE SANITARY AND HYGIENE SEGMENTS WITH SHOWERS, SANITARY HUBS AND THE ROOM FOR THE WC. THE LINE SEGMENT WILL BE BROUGHT INTO LINE WITH THE WATER AND THE ELECTRICITY. A PV ON THE ROOF WILL BE INSTALLED, PV ON A MINE CAPACITY. 3KWP, WILL CONTRIBUTE TO THE AIR HEAT PUMP FOR HOT SERVICE HOT WATER. 4. A CABLE ELECTRICAL SKI EXTRACT IS PLANNED FOR THE CONSTRUCTION OF A PORTABLE EXTRACT OF 2 SLAPS, WHICH IS BASED ON 2 PYLONACH. THE EXTRACT WILL INCLUDE: DRAG ANCHORS, BARRIER COMPLETE, RUN IN ARTIFICIAL FORM BY GRASS, FOAM, KAPOK, SKIS AND WASARDY, PONTOON FOR OPERATION AND MAINTENANCE OF OBSTACLES. 5. THE ELEMENTS OF A SMALL ARCHITECTURE AT THE DESIGNATED POINTS IN THE CYCLE AND PEDESTRIAN CYCLE WILL BE DESIGNED WITH A VIEW TO THE SURFACE OF THE CONCRETE SURFACE OF THE CONCRETE CUBE ON WHICH THE BENCHES, RACKS FOR BICYCLES, GARBAGE BINS, AIR CYLINDERS WILL BE SET. THE PROJECT IS IN LINE WITH THE CONCEPT OF UNIVERSAL DESIGN, BASED ON 7 RULES: BENEFITS FOR PEOPLE OF DIFFERENT EFFICIENCY, FLEXIBILITY IN USE, SIMPLE AND INTUITIVE USE, CLEAR INFORMATION, TOLERANCES ON ERRORS, COMFORTABLE USE WITHOUT EFFORT, SIZE AND SPACE SUITABLE FOR THE DOST (English)
Property / summary: THE PROJECT WILL CONSIST OF THE DEVELOPMENT OF TOURIST INFRASTRUCTURE IN THE FORM OF A TOURIST AND RECREATIONAL ROUTE LOCATED AROUND THE LAGOON OF SKIERNIEWICE. THE PROJECT WILL CONSIST OF SEVERAL TASKS: 1. THE ROUTING OF THE ROUTE WILL LEAD TO THE MOST ATTRACTIVE POINTS OF THE CITY. IN THE COURSE OF THE JOURNEY, QUEST WILL BE PREPARED — TOURS COMBINED WITH QUITTING/RIDDLE, WITH DIFFERENT DEGREES OF DIFFICULTY. A CERTIFIED PIT SHALL BE MADE DURING THE COURSE OF THE JOURNEY. 2. THE CONSTRUCTION OF A PEDESTRIAN PATH AROUND THE EDGE OF THE CONTAINER WILL BE DESIGNED FOR A PEDESTRIAN/CYCLE PATH HAVING A ASPHALT SURFACE AND A WIDTH OF 4.0 M AND A DAY. OK. 4.5 KM. 3 CYCLES WILL BE BUILT ON TRACK. 3. THE UPGRADING OF THE EXISTING BEACH HAS BEEN DESIGNED TO SET THE SANITARY AND HYGIENE SEGMENTS WITH SHOWERS, SANITARY HUBS AND THE ROOM FOR THE WC. THE LINE SEGMENT WILL BE BROUGHT INTO LINE WITH THE WATER AND THE ELECTRICITY. A PV ON THE ROOF WILL BE INSTALLED, PV ON A MINE CAPACITY. 3KWP, WILL CONTRIBUTE TO THE AIR HEAT PUMP FOR HOT SERVICE HOT WATER. 4. A CABLE ELECTRICAL SKI EXTRACT IS PLANNED FOR THE CONSTRUCTION OF A PORTABLE EXTRACT OF 2 SLAPS, WHICH IS BASED ON 2 PYLONACH. THE EXTRACT WILL INCLUDE: DRAG ANCHORS, BARRIER COMPLETE, RUN IN ARTIFICIAL FORM BY GRASS, FOAM, KAPOK, SKIS AND WASARDY, PONTOON FOR OPERATION AND MAINTENANCE OF OBSTACLES. 5. THE ELEMENTS OF A SMALL ARCHITECTURE AT THE DESIGNATED POINTS IN THE CYCLE AND PEDESTRIAN CYCLE WILL BE DESIGNED WITH A VIEW TO THE SURFACE OF THE CONCRETE SURFACE OF THE CONCRETE CUBE ON WHICH THE BENCHES, RACKS FOR BICYCLES, GARBAGE BINS, AIR CYLINDERS WILL BE SET. THE PROJECT IS IN LINE WITH THE CONCEPT OF UNIVERSAL DESIGN, BASED ON 7 RULES: BENEFITS FOR PEOPLE OF DIFFERENT EFFICIENCY, FLEXIBILITY IN USE, SIMPLE AND INTUITIVE USE, CLEAR INFORMATION, TOLERANCES ON ERRORS, COMFORTABLE USE WITHOUT EFFORT, SIZE AND SPACE SUITABLE FOR THE DOST (English) / rank
 
Normal rank

Revision as of 09:46, 6 March 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
INCREASING THE ATTRACTIVENESS OF THE TOURIST INFRASTRUCTURE OF THE CITY OF SKIERNIEWICE
Project in Poland financed by DG Regio

    Statements

    0 references
    5,928,030.2 zloty
    0 references
    1,422,727.248 Euro
    13 January 2020
    0 references
    8,828,252.2 zloty
    0 references
    2,118,780.528 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 November 2016
    0 references
    28 September 2018
    0 references
    MIASTO SKIERNIEWICE
    0 references

    51°57'29.2"N, 20°8'41.6"E
    0 references
    PRZEDSIĘWZIĘCIE BĘDZIE POLEGAŁO NA STWORZENIU INFRASTRUKTURY TURYSTYCZNEJ W POSTACI WYZNACZENIA SZLAKU TURYSTYCZNEGO I REKREACYJNEJ NA TERENACH WOKÓŁ ZALEWU ZADĘBIE W SKIERNIEWICACH. NA REALIZACJĘ PRZEDSIĘWZIĘCIA BĘDZIE SKŁADAŁO SIĘ KILKA ZADAŃ: 1. WYZNACZENIE TRASY WYCIECZKOWEJ TRASA BĘDZIE PROWADZIĆ PRZEZ NAJBARDZIEJ ATRAKCYJNE PUNKTY MIASTA. W CIĄGU TRASY ZOSTANIE PRZYGOTOWANY QUEST – ZWIEDZANIE POŁĄCZONE Z ROZWIĄZYWANIEM QUIZÓW/ZAGADEK, O RÓŻNYCH STOPNIACH TRUDNOŚCI. W CIĄGU TRASY PLANOWANE JEST UTWORZENIE CERTYFIKOWANEGO PIT. 2. WYBUDOWANIE ŚCIEŻKI PIESZO-ROWEROWEJ WOKÓŁ BRZEGÓW ZBIORNIKA ZAPROJEKTOWANA ZOSTANIE ŚCIEŻKA PIESZO-ROWEROWA O NAWIERZCHNI ASFALTOWEJ I SZEROKOŚCI 4,0 M I DŁ. OK. 4,5KM. WYBUDOWANE ZOSTANĄ 3 ZJAZDY ROWEROWE DO ŚCIEŻKI. 3. MODERNIZACJA ISTNIEJĄCEJ PLAŻY ZAPLANOWANO USTAWIENIE SEGMENTÓW SANITARNO-HIGIENICZNYCH Z NATRYSKAMI, WĘZŁAMI SANITARNYMI ORAZ POMIESZCZENIA WC. DO SEGMENTU ZOSTANIE DOPROWADZONA SIEĆ WOD-KAN, ORAZ ELEKTRYCZNA. NA DACHU ZOSTANIE ZAMONTOWANA INSTALACJA FOTOWOLTAICZNA PV O MOCY MIN. 3KWP, BĘDZIE ZASILAŁA POWIETRZNE POMPY CIEPŁA DO CELÓW C.W.U. 4. LINOWY ELEKTRYCZNY WYCIĄG NART WODNYCH ZAPLANOWANO BUDOWĘ PRZENOŚNEGO WYCIĄGU 2 SŁUPOWEGO, OPARTEGO NA 2 PYLONACH. W SKŁAD WYCIĄGU WEJDĄ M.IN: KOTWY ODCIĄGOWE, KOMPLET PRZESZKÓD, POMOST STARTOWY PŁYWAJĄCY WYŁOŻONY SZTUCZNĄ TRAWĄ, PIANKI, KAPOKI, NARTY I WAKEBOARDY, PONTON DO OBSŁUGI I KONSERWACJI PRZESZKÓD. 5. ELEMENTY MAŁEJ ARCHITEKTURY W WYZNACZONYCH MIEJSCACH PRZY ŚCIEŻCE ROWEROWO-PIESZEJ ZOSTANĄ ZAPROJEKTOWANE MIEJSCA WYPOCZYNKOWO-WIDOKOWE O NAWIERZCHNI Z KOSTKI BETONOWEJ, NA KTÓREJ USTAWIONE BĘDĄ ŁAWKI, STOJAKI NA ROWERY, KOSZE NA ŚMIECI, SIŁOWNIA NA POWIETRZU. PROJEKT JEST ZGODNY Z KONCEPCJĄ UNIWERSALNEGO PROJEKTOWANIA, OPARTEGO NA 7 REGUŁACH: UŻYTECZNOŚĆ DLA OSÓB O RÓŻNEJ SPRAWNOŚCI, ELASTYCZNOŚĆ W UŻYTKOWANIU, PROSTE I INTUICYJNE UŻYTKOWANIE, CZYTELNA INFORMACJA, TOLERANCJA NA BŁĘDY, WYGODNE UŻYTKOWANIE BEZ WYSIŁKU, WIELKOŚĆ I PRZESTRZEŃ ODPOWIEDNIE DLA DOST (Polish)
    0 references
    THE PROJECT WILL CONSIST OF THE DEVELOPMENT OF TOURIST INFRASTRUCTURE IN THE FORM OF A TOURIST AND RECREATIONAL ROUTE LOCATED AROUND THE LAGOON OF SKIERNIEWICE. THE PROJECT WILL CONSIST OF SEVERAL TASKS: 1. THE ROUTING OF THE ROUTE WILL LEAD TO THE MOST ATTRACTIVE POINTS OF THE CITY. IN THE COURSE OF THE JOURNEY, QUEST WILL BE PREPARED — TOURS COMBINED WITH QUITTING/RIDDLE, WITH DIFFERENT DEGREES OF DIFFICULTY. A CERTIFIED PIT SHALL BE MADE DURING THE COURSE OF THE JOURNEY. 2. THE CONSTRUCTION OF A PEDESTRIAN PATH AROUND THE EDGE OF THE CONTAINER WILL BE DESIGNED FOR A PEDESTRIAN/CYCLE PATH HAVING A ASPHALT SURFACE AND A WIDTH OF 4.0 M AND A DAY. OK. 4.5 KM. 3 CYCLES WILL BE BUILT ON TRACK. 3. THE UPGRADING OF THE EXISTING BEACH HAS BEEN DESIGNED TO SET THE SANITARY AND HYGIENE SEGMENTS WITH SHOWERS, SANITARY HUBS AND THE ROOM FOR THE WC. THE LINE SEGMENT WILL BE BROUGHT INTO LINE WITH THE WATER AND THE ELECTRICITY. A PV ON THE ROOF WILL BE INSTALLED, PV ON A MINE CAPACITY. 3KWP, WILL CONTRIBUTE TO THE AIR HEAT PUMP FOR HOT SERVICE HOT WATER. 4. A CABLE ELECTRICAL SKI EXTRACT IS PLANNED FOR THE CONSTRUCTION OF A PORTABLE EXTRACT OF 2 SLAPS, WHICH IS BASED ON 2 PYLONACH. THE EXTRACT WILL INCLUDE: DRAG ANCHORS, BARRIER COMPLETE, RUN IN ARTIFICIAL FORM BY GRASS, FOAM, KAPOK, SKIS AND WASARDY, PONTOON FOR OPERATION AND MAINTENANCE OF OBSTACLES. 5. THE ELEMENTS OF A SMALL ARCHITECTURE AT THE DESIGNATED POINTS IN THE CYCLE AND PEDESTRIAN CYCLE WILL BE DESIGNED WITH A VIEW TO THE SURFACE OF THE CONCRETE SURFACE OF THE CONCRETE CUBE ON WHICH THE BENCHES, RACKS FOR BICYCLES, GARBAGE BINS, AIR CYLINDERS WILL BE SET. THE PROJECT IS IN LINE WITH THE CONCEPT OF UNIVERSAL DESIGN, BASED ON 7 RULES: BENEFITS FOR PEOPLE OF DIFFERENT EFFICIENCY, FLEXIBILITY IN USE, SIMPLE AND INTUITIVE USE, CLEAR INFORMATION, TOLERANCES ON ERRORS, COMFORTABLE USE WITHOUT EFFORT, SIZE AND SPACE SUITABLE FOR THE DOST (English)
    0 references

    Identifiers

    RPLD.06.02.01-10-0019/16
    0 references