Modernisation of equipment and construction work at BTZ Lahn-Dill (Q3303807): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3361983 / rank
 
Normal rank

Revision as of 13:15, 26 October 2021

Project Q3303807 in Germany
Language Label Description Also known as
English
Modernisation of equipment and construction work at BTZ Lahn-Dill
Project Q3303807 in Germany

    Statements

    0 references
    3,268,378.59 Euro
    0 references
    12 December 2016
    0 references
    15 December 2019
    0 references
    Handwerkskammer Wiesbaden
    0 references
    0 references
    0 references

    50°34'12.14"N, 8°29'0.49"E
    0 references
    35576
    0 references
    Die Handwerkskammer Wiesbaden führt im BTZ Lahn-Dill "Arnold-Spruck-Haus" in Wetzlar die Modernisierung der Ausstattung und Baumaßnahmen durch. Neben der Anpassung der Ausstattung an die technische Entwicklung in dem Fachbereich Metalltechnik werden der Neubau einer beheizten Multifunktionshalle und einer unbeheizten Lagerhalle für die Kfz-Technik, die Erweiterung der überdachten Lagerfläche, der Einbau eines Gasbrennwertkessels und eines Blockheizkraftwerkes für das Internat, der Ersatz von Lüftungs-und Klimaanlage, die Schaffung eines gepflasterten Weges im Außenbereich für den Staplerverkehr und weitere kleine baulichen Maßnahmen durchgeführt. (German)
    0 references
    At the BTZ Lahn-Dill “Arnold-Spruck-Haus” in Wetzlar, the Wiesbaden Chamber of Crafts carries out the modernisation of the equipment and construction measures. In addition to adapting the equipment to the technical development in the field of metal technology, the construction of a heated multifunctional hall and an unheated warehouse for automotive technology, the extension of the covered storage area, the installation of a gas-fired boiler and a combined heat and power plant for the boarding school, the replacement of ventilation and air conditioning, the creation of a paved road in the outdoor area for forklifts and other small structural measures. (English)
    24 October 2021
    0 references

    Identifiers

    DE_TEMPORARY_6591
    0 references