The protection of sea banks in the Heral Peninsula (Q85106): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wooden...) |
||
Property / summary | |||
Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wooden bulb. the renewed system will consist of about 144 moth.The length of the section where the task will be carried out in relation to the length to be protected in accordance with the POM shall be 59 %.Product indicators:Number of facilities built for flood protection purposes:1 Result indicators:The length of the coastline where action is taken with regard to the protection of sea banks — 12 km. (English) | |||
Property / summary: Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wooden bulb. the renewed system will consist of about 144 moth.The length of the section where the task will be carried out in relation to the length to be protected in accordance with the POM shall be 59 %.Product indicators:Number of facilities built for flood protection purposes:1 Result indicators:The length of the coastline where action is taken with regard to the protection of sea banks — 12 km. (English) / rank | |||
Normal rank |
Revision as of 10:05, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The protection of sea banks in the Heral Peninsula |
Project in Poland financed by DG Regio |
Statements
63,750,000.0 zloty
0 references
75,000,000.0 zloty
0 references
85.0 percent
0 references
1 April 2017
0 references
30 April 2022
0 references
URZĄD MORSKI W GDYNI
0 references
Zakres przedmiotowy projektu: Głównym elementem przedsięwzięcia jest odbudowa ostróg na odcinku od 0,3 km we Władysławowie do 12,3 km w Kuźnicy. Istniejące ostrogi (ok. 110 szt.) zostaną zlikwidowane. Pozostawione zostaną 4 ostrogi, które zostały wykonane w 2012 roku oraz 5 ostróg przy falochronie Portu Władysławowo.Planowane jest odtworzenie 135 ostróg. Przewidziany do odbudowy system ostróg zostanie wykonany z pali drewnianych.Sumarycznie odnowiony system będzie się składał z około 144 ostróg. Długość odcinka na którym realizowane będzie zadanie w stosunku do długości odcinka przeznaczonego do ochrony zgodnie z POBM wynosi 59%. Wskaźniki produktu: Liczba wybudowanych urządzeń dla celów ochrony przeciwpowodziowej - szt. 1 Wskaźniki rezultatu: Długość linii brzegowej, na której prowadzone są działania z zakresu ochrony brzegów morskich – 12 km. (Polish)
0 references
Project scope:The main element of the project is the reconstruction of the corner over 0.3 km in Władysławowo to 12.3 km in Kuźnica.Existing sharpness (ca.110 units) will be liquidated.There will be a maximum of 4 pages which have been carried out in 2012 and a 5th anniversary in the event of the protection of the port of Władysławow.A is planned to be reconstituted at 135th anniversary.The reintroduction of the system will be made with a wooden bulb. the renewed system will consist of about 144 moth.The length of the section where the task will be carried out in relation to the length to be protected in accordance with the POM shall be 59 %.Product indicators:Number of facilities built for flood protection purposes:1 Result indicators:The length of the coastline where action is taken with regard to the protection of sea banks — 12 km. (English)
0 references
Identifiers
POIS.02.01.00-00-0026/17
0 references