Improvement of the communication link between the islands of Usefamiliar islands and of the Wolin in Świnoujście — construction of a tunnel under the ‘ring fence’ (Q85957): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout., Adding English summary) |
||
Property / summary | |||
It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout. (English) | |||
Property / summary: It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout. (English) / rank | |||
Normal rank |
Revision as of 10:01, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Improvement of the communication link between the islands of Usefamiliar islands and of the Wolin in Świnoujście — construction of a tunnel under the ‘ring fence’ |
Project in Poland financed by DG Regio |
Statements
775,677,722.67 zloty
0 references
186,162,653.44079998 Euro
0.24 Euro
13 January 2020
0 references
913,850,818.99 zloty
0 references
85.0 percent
0 references
1 January 2014
0 references
31 March 2023
0 references
GMINA MIASTO ŚWINOUJŚCIE
0 references
Zakłada się wykonanie tunelu jednonawowego w technologii tarczy drążonej TBM, dł. 1,44 km. Pozostałymi elementami układu drogowego będą: drogi dojazdowe do tunelu: wyspa Uznam drogi dojazdowe do tunelu wraz ze stacją poboru opłat, wyspa Wolin drogi dojazdowe do tunelu oraz rondo. (Polish)
0 references
It is assumed that the one-on-bed tunnel in the TBM panel will be performed.1.44 km.The other components of the road system will be:access routes to the tunnel:the island is familiar with the access roads to the tunnel along with the toll station, the island of Wolin access roads to the tunnel and the roundabout. (English)
0 references
Identifiers
POIS.04.02.00-00-0021/16
0 references