(Created claim: summary (P836): The main goal of the project is to reduce the level of energy consumption in public buildings, which has so far been inflated in particular during the heating period due to the lack of adequate warming and insulation of buildings, the inertia of the doors and the poor technical condition.Investment will reduce the demand for final energy consumption by 131 GJ/year and reduce greenhouse gas (CO2) emissions by 263,93 tonnes/year.The improvement of...) |
||
Property / summary | |||
The main goal of the project is to reduce the level of energy consumption in public buildings, which has so far been inflated in particular during the heating period due to the lack of adequate warming and insulation of buildings, the inertia of the doors and the poor technical condition.Investment will reduce the demand for final energy consumption by 131 GJ/year and reduce greenhouse gas (CO2) emissions by 263,93 tonnes/year.The improvement of buildings will consist of the completion of works resulting from a reduction in the final energy demand delivered to buildings for heating and domestic hot water.Thermal insulation of partitions will be aligned with the minimum energy saving and thermal insulation requirements laid down in technical and construction regulations which will apply from 2021.Renewable energy sources for domestic hot water will be installed. (English) | |||
Property / summary: The main goal of the project is to reduce the level of energy consumption in public buildings, which has so far been inflated in particular during the heating period due to the lack of adequate warming and insulation of buildings, the inertia of the doors and the poor technical condition.Investment will reduce the demand for final energy consumption by 131 GJ/year and reduce greenhouse gas (CO2) emissions by 263,93 tonnes/year.The improvement of buildings will consist of the completion of works resulting from a reduction in the final energy demand delivered to buildings for heating and domestic hot water.Thermal insulation of partitions will be aligned with the minimum energy saving and thermal insulation requirements laid down in technical and construction regulations which will apply from 2021.Renewable energy sources for domestic hot water will be installed. (English) / rank | |||
Normal rank |
Revision as of 09:35, 4 March 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of Building No 41, 41A — 41B in m. Koszalin |
Project in Poland financed by DG Regio |
Statements
2,070,653.5 zloty
0 references
3,115,140.22 zloty
0 references
85.0 percent
0 references
18 August 2015
0 references
30 November 2017
0 references
CENTRALNY OŚRODEK SZKOLENIA STRAŻY GRANICZNEJ IM. MARSZAŁKA POLSKI JÓZEFA PIŁSUDSKIEGO W KOSZALINIE
0 references
Głównym celem projektu jest obniżenie poziomu zużycia energii w budynkach użyteczności publicznej, który dotychczas jest zawyżony zwłaszcza w okresie grzewczym w związku z brakiem odpowiedniego ocieplenia i izolacji budynków, nieszczelnością drzwi i złym stanem technicznym. Podjęcie inwestycji doprowadzi do zmniejszenia zapotrzebowania na zużycie energii końcowej o 131 GJ/rok oraz pozwoli na zredukowanie emisji gazów cieplarnianych (CO2) o 263,93 Mg/rok. Ulepszenie budynków będzie polegało na przeprowadzeniu prac w wyniku, których następuje zmniejszenie zapotrzebowania na energię końcową dostarczoną do budynków na potrzeby ogrzewania i przygotowania ciepłej wody użytkowej. Izolacyjność cieplna przegród, będzie dostosowana do minimalnych wymagań dotyczących oszczędności energii i izolacyjności cieplnej określonych w przepisach techniczno-budowlanych, które obowiązywać będą od roku 2021. Zostaną zamontowane odnawialne źródła energii na potrzeby ciepłej wody użytkowej. (Polish)
0 references
The main goal of the project is to reduce the level of energy consumption in public buildings, which has so far been inflated in particular during the heating period due to the lack of adequate warming and insulation of buildings, the inertia of the doors and the poor technical condition.Investment will reduce the demand for final energy consumption by 131 GJ/year and reduce greenhouse gas (CO2) emissions by 263,93 tonnes/year.The improvement of buildings will consist of the completion of works resulting from a reduction in the final energy demand delivered to buildings for heating and domestic hot water.Thermal insulation of partitions will be aligned with the minimum energy saving and thermal insulation requirements laid down in technical and construction regulations which will apply from 2021.Renewable energy sources for domestic hot water will be installed. (English)
0 references
Identifiers
POIS.01.03.01-00-0047/16