G1 Danube HWS Pssau — Lindau Gear Factory (Q3297676): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The flood protection measure consists essentially of flood protection walls, a dike and mobile elements that close the wall and dike openings for the traffic connections in the event of floods. In addition, 5 pumping stations, a lifting unit and a sewage pump will be built., translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
G1 Danube HWS Pssau — Lindau Gear Factory |
Revision as of 16:04, 24 October 2021
Project Q3297676 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | G1 Danube HWS Pssau — Lindau Gear Factory |
Project Q3297676 in Germany |
Statements
18,500,000.0 Euro
0 references
1 January 2014
0 references
31 December 2022
0 references
Freistaat Bayern vertreten durch das Wasserwirtschaftsamt Deggendorf
0 references
Die Hochwasserschutzmaßnahme besteht im Wesentlichen aus Hochwasserschutzmauern, einem Deich und mobilen Elementen die im Hochwasserfall die Mauer- und Deichöffnungen für die Verkehrsverbindungen verschließen. Außerdem werden 5 Pumpwerke, ein Hebewerk und ein Abwasserpumpwerk errichtet. (German)
0 references
The flood protection measure consists essentially of flood protection walls, a dike and mobile elements that close the wall and dike openings for the traffic connections in the event of floods. In addition, 5 pumping stations, a lifting unit and a sewage pump will be built. (English)
24 October 2021
0 references
Passau
0 references
Identifiers
DE_TEMPORARY_463
0 references