Installation of Efficient Lighting in the Garden of Our Lady of Grace – Rosary (Q2853711): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: budget (P474): 30,774.6 euro)
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
Property / budget
 
36,205.0 Euro
Amount36,205.0 Euro
UnitEuro
Property / budget: 36,205.0 Euro / rank
 
Normal rank
Property / EU contribution
 
30,775.0 Euro
Amount30,775.0 Euro
UnitEuro
Property / EU contribution: 30,775.0 Euro / rank
 
Normal rank
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 06:28, 22 October 2021

Project Q2853711 in Portugal
Language Label Description Also known as
English
Installation of Efficient Lighting in the Garden of Our Lady of Grace – Rosary
Project Q2853711 in Portugal

    Statements

    0 references
    0 references
    30,775.0 Euro
    0 references
    36,205.0 Euro
    0 references
    85.0 percent
    0 references
    1 March 2019
    0 references
    31 December 2019
    0 references
    MUNICÍPIO DE LAGOA-AÇORES
    0 references
    0 references

    37°7'57.29"N, 8°27'18.18"W
    0 references
    A operação localiza-se no Jardim de Nossa Senhora da Graça - Rosário, no concelho de Lagoa.A Câmara Municipal de Lagoa propõe-se a intervir em luminárias de Iluminação Pública que apresenta consumos de eletricidade totais anuais de, aproximadamente, 5.256 kWh/ano. Estes valores representam uma faturação de cerca de 726euros/ano. A intervenção caracteriza-se por substituição/instalação direta para LED, associada a soluções de telegestão da rede (Portuguese)
    0 references
    The operation is located in the Jardim de Nossa Senhora da Graça – Rosario, in the municipality of Lagoa.The Municipality of Lagoa proposes to intervene in public lighting lamps that have total annual electricity consumption of approximately 5,256 kWh/year. These figures represent an invoicing of around EUR 726/year. The intervention is characterised by direct replacement/installation for LED, associated with telemanagement solutions of the network (English)
    6 July 2021
    0 references
    Lagoa
    0 references

    Identifiers

    ACORES-04-1203-FEDER-000006
    0 references